Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 514 results ...

Ökmen, & and Öztaş, A (2008) Construction Project Network Evaluation with Correlated Schedule Risk Analysis Model. Journal of Construction Engineering and Management, 134(01), 49–63.

Abdelhamid, T S and Everett, J G (2000) Identifying Root Causes of Construction Accidents. Journal of Construction Engineering and Management, 126(01), 52–60.

Abdelhamid, T S and Everett, J G (1999) Physiological Demands of Concrete Slab Placing and Finishing Work. Journal of Construction Engineering and Management, 125(01), 47–52.

Abdul Nabi, M and El-adaway, I H (2022) Understanding Disputes in Modular Construction Projects: Key Common Causes and Their Associations. Journal of Construction Engineering and Management, 148(01).

Abotaleb, I S and El-adaway, I H (2017) Construction Bidding Markup Estimation Using a Multistage Decision Theory Approach. Journal of Construction Engineering and Management, 143(01).

AbouRizk, S M and Wales, R J (1997) Combined Discrete-Event/Continuous Simulation for Project Planning. Journal of Construction Engineering and Management, 123(01), 11–20.

Abowitz, D A and Toole, T M (2010) Mixed Method Research: Fundamental Issues of Design, Validity, and Reliability in Construction Research. Journal of Construction Engineering and Management, 136(01), 108–16.

Abu Samra, S, Ahmed, M, Hammad, A and Zayed, T (2018) Multiobjective Framework for Managing Municipal Integrated Infrastructure. Journal of Construction Engineering and Management, 144(01).

Abu‐Hijleh, S F and Ibbs, C W (1993) Systematic Automated Management Exception Reporting. Journal of Construction Engineering and Management, 119(01), 87–104.

Abudayyeh, O (2003) Undergraduate Research Mentoring Model in Construction Engineering and Management. Journal of Construction Engineering and Management, 129(01), 65–69.

Adeli, H and Wu, M (1998) Regularization Neural Network for Construction Cost Estimation. Journal of Construction Engineering and Management, 124(01), 18–24.

Ahmadian, F F A, Akbarnezhad, A, Rashidi, T H and Waller, S T (2016) Accounting for Transport Times in Planning Off-Site Shipment of Construction Materials. Journal of Construction Engineering and Management, 142(01).

Ahmed, H I (2023) Mechanical Behavior, Microstructure, and Chloride-Penetration Resistance of Glass Waste Nanopowder Magnetic Concrete. Journal of Construction Engineering and Management, 149(01).

Ahn, S and Lee, S (2015) Methodology for Creating Empirically Supported Agent-Based Simulation with Survey Data for Studying Group Behavior of Construction Workers. Journal of Construction Engineering and Management, 141(01).

Aljassmi, H, Han, S and Davis, S (2014) Project Pathogens Network: New Approach to Analyzing Construction-Defects-Generation Mechanisms. Journal of Construction Engineering and Management, 140(01).

Allouche, E N, Ariaratnam, S T and Lueke, J S (2000) Horizontal Directional Drilling: Profile of an Emerging Industry. Journal of Construction Engineering and Management, 126(01), 68–76.

Alvanchi, A, Lee, S and AbouRizk, S (2012) Dynamics of Working Hours in Construction. Journal of Construction Engineering and Management, 138(01), 66–77.

Amies, P, Jin, X and Senaratne, S (2023) Systematic Literature Review on Success Criteria for Dam Engineering Projects. Journal of Construction Engineering and Management, 149(01).

Ammar, M A (2013) LOB and CPM Integrated Method for Scheduling Repetitive Projects. Journal of Construction Engineering and Management, 139(01), 44–50.

Ammar, M A (2011) Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows. Journal of Construction Engineering and Management, 137(01), 65–71.

Anvuur, A M and Kumaraswamy, M M (2016) Effects of Teamwork Climate on Cooperation in Crossfunctional Temporary Multi-Organization Workgroups. Journal of Construction Engineering and Management, 142(01).

Arashpour, M, Wakefield, R, Blismas, N and Abbasi, B (2016) Quantitative Analysis of Rate-Driven and Due Date–Driven Construction: Production Efficiency, Supervision, and Controllability in Residential Projects. Journal of Construction Engineering and Management, 142(01).

Arditi, D (1985) Construction Productivity Improvement. Journal of Construction Engineering and Management, 111(01), 1–14.

Arditi, D (1983) Diffusion of Network Planning in Construction. Journal of Construction Engineering and Management, 109(01), 1–12.

Arditi, D and Gutierrez, A E (1991) Factors Affecting U.S. Contractors' Performance Overseas. Journal of Construction Engineering and Management, 117(01), 27–46.

Arditi, D and Patel, B K (1989) Impact Analysis of Owner‐Directed Acceleration. Journal of Construction Engineering and Management, 115(01), 144–57.

Arroyo, P, Tommelein, I D and Ballard, G (2015) Comparing AHP and CBA as Decision Methods to Resolve the Choosing Problem in Detailed Design. Journal of Construction Engineering and Management, 141(01).

Asghari, V and Hsu, S (2022) Upscaling Complex Project-Level Infrastructure Intervention Planning to Network Assets. Journal of Construction Engineering and Management, 148(01).

Ayinla, K, Cheung, F and Skitmore, M (2022) Process Waste Analysis for Offsite Production Methods for House Construction: A Case Study of Factory Wall Panel Production. Journal of Construction Engineering and Management, 148(01).

Azhar, S, Ahmad, I and Sein, M K (2010) Action Research as a Proactive Research Method for Construction Engineering and Management. Journal of Construction Engineering and Management, 136(01), 87–98.

Back, W E, Boles, W W and Fry, G T (2000) Defining Triangular Probability Distributions from Historical Cost Data. Journal of Construction Engineering and Management, 126(01), 29–37.

Badger, W W and Mulligan, D E (1995) Rationale and Benefits Associated with International Alliances. Journal of Construction Engineering and Management, 121(01), 100–11.

Bai, S, Li, M, Song, L and Kong, R (2021) Developing a Common Library of Prefabricated Structure Components through Graphic Media Mapping to Improve Design Efficiency. Journal of Construction Engineering and Management, 147(01).

Bakatjan, S, Arikan, M and Tiong, R L K (2003) Optimal Capital Structure Model for BOT Power Projects in Turkey. Journal of Construction Engineering and Management, 129(01), 89–97.

Bakhoum, E S and Brown, D C (2012) Developed Sustainable Scoring System for Structural Materials Evaluation. Journal of Construction Engineering and Management, 138(01), 110–9.

Ballard, G and Howell, G (1998) Shielding Production: Essential Step in Production Control. Journal of Construction Engineering and Management, 124(01), 11–17.

Ballesteros-Pérez, P, Sanz-Ablanedo, E, Soetanto, R, González-Cruz, M C, Larsen, G D and Cerezo-Narváez, A (2020) Duration and Cost Variability of Construction Activities: An Empirical Study. Journal of Construction Engineering and Management, 146(01).

Bambrick, B (1994) Construction of an Island. Journal of Construction Engineering and Management, 120(01), 223–7.

Barkokebas, B, Al-Hussein, M and Hamzeh, F (2023) Assessment of Digital Twins to Reassign Multiskilled Workers in Offsite Construction Based on Lean Thinking. Journal of Construction Engineering and Management, 149(01).

Barraza, G A, Back, W E and Mata, F (2004) Probabilistic Forecasting of Project Performance Using Stochastic S Curves. Journal of Construction Engineering and Management, 130(01), 25–32.

Basha, I M, Gab-Allah, A A and Amer, M I (1995) Construction of Ameria Caisson in Egypt. Journal of Construction Engineering and Management, 121(01), 13–19.

Bashford, H H, Walsh, K D and Sawhney, A (2005) Production System Loading–Cycle Time Relationship in Residential Construction. Journal of Construction Engineering and Management, 131(01), 15–22.

Beliveau, Y J, Dixit, S S, Dal, T and Morad, A A (1993) Multitask Motion Planning for Material Handling in Construction. Journal of Construction Engineering and Management, 119(01), 180–91.

Beliveau, Y J, Snyder, D A and Vorster, M C (1991) DBE Programs—New Model. Journal of Construction Engineering and Management, 117(01), 176–92.

Bell, L C and Stukhart, G (1986) Attributes of Materials Management Systems. Journal of Construction Engineering and Management, 112(01), 14–21.

Bemelmans, J, Voordijk, H, Vos, B and Buter, J (2012) Assessing Buyer-Supplier Relationship Management: Multiple Case-Study in the Dutch Construction Industry. Journal of Construction Engineering and Management, 138(01), 163–76.

Bernold, L E and Lee, T S (2010) Experimental Research in Construction. Journal of Construction Engineering and Management, 136(01), 26–35.

Bo, X and Chan, A P C (2012) Investigation of Barriers to Entry into the Design-Build Market in the People’s Republic of China. Journal of Construction Engineering and Management, 138(01), 120–7.

Boles, W W, Maxwell, D A, Scott, W D, Heermann, P D, Yarborough, T and Underwood, J (1995) Construction Automation and Robotics—Pathway to Implementation. Journal of Construction Engineering and Management, 121(01), 143–52.

Bonnal, P, Gourc, D and Lacoste, G (2004) Where Do We Stand with Fuzzy Project Scheduling?. Journal of Construction Engineering and Management, 130(01), 114–23.

Borg, L and Song, H (2015) Quality Change and Implications for Productivity Development: Housing Construction in Sweden 1990–2010. Journal of Construction Engineering and Management, 141(01).

Bossink, B A G and Brouwers, H J H (1996) Construction Waste: Quantification and Source Evaluation. Journal of Construction Engineering and Management, 122(01), 55–60.

Bröchner, J and Grandinson, B (1992) R&D Cooperation by Swedish Contractors. Journal of Construction Engineering and Management, 118(01), 3–16.

Burati, J L, Farrington, J J and Ledbetter, W B (1992) Causes of Quality Deviations in Design and Construction. Journal of Construction Engineering and Management, 118(01), 34–49.

Burati, J L, Matthews, M F and Kalidindi, S N (1992) Quality Management Organizations and Techniques. Journal of Construction Engineering and Management, 118(01), 112–28.

Bynum, P, Issa, R R A and Olbina, S (2013) Building Information Modeling in Support of Sustainable Design and Construction. Journal of Construction Engineering and Management, 139(01), 24–34.

C. B., T and R. P., F (1986) Organizational Alternatives for Large Projects. Journal of Construction Engineering and Management, 112(01), 49–61.

C. William, I (1986) “Brand Name or Equal” Product Specifications. Journal of Construction Engineering and Management, 112(01), 1–13.

Caldas, C H, Kim, J, Haas, C T, Goodrum, P M and Zhang, D (2015) Method to Assess the Level of Implementation of Productivity Practices on Industrial Projects. Journal of Construction Engineering and Management, 141(01).

Carino, N J, Lew, H S and Stone, W C (1984) Investigation of East Chicago Ramp Collapse. Journal of Construction Engineering and Management, 110(01), 1–18.

Carr, R I (1987) Competitive Bidding and Opportunity Costs. Journal of Construction Engineering and Management, 113(01), 151–65.

Carr, R I (1983) Impact of Number of Bidders on Competition. Journal of Construction Engineering and Management, 109(01), 61–73.

Carr, R I (1987) Optimum Markup by Direct Solution. Journal of Construction Engineering and Management, 113(01), 138–50.

Casanovas, M d M, Armengou, J and Ramos, G (2014) Occupational Risk Index for Assessment of Risk in Construction Work by Activity. Journal of Construction Engineering and Management, 140(01).

Castillo, G, Alarcón, L F and González, V A (2015) Implementing Lean Production in Copper Mining Development Projects: Case Study. Journal of Construction Engineering and Management, 141(01).

Chan, A P C, Scott, D and Chan, A P L (2004) Factors Affecting the Success of a Construction Project. Journal of Construction Engineering and Management, 130(01), 153–5.

Chang, C (2014) Principal-Agent Model of Risk Allocation in Construction Contracts and Its Critique. Journal of Construction Engineering and Management, 140(01).

Chang, C and Ko, J (2017) New Approach to Estimating the Standard Deviations of Lognormal Cost Variables in the Monte Carlo Analysis of Construction Risks. Journal of Construction Engineering and Management, 143(01).

Chao, L and Skibniewski, M J (1995) Neural Network Method of Estimating Construction Technology Acceptability. Journal of Construction Engineering and Management, 121(01), 130–42.

Chen, Z, Li, H and Wong, C T C (2005) {[}EnvironalPlanning{]}: Analytic Network Process Model for Environmentally Conscious Construction Planning. Journal of Construction Engineering and Management, 131(01), 92–101.

Cheng, M and Tsai, M (2003) Reengineering of Construction Management Process. Journal of Construction Engineering and Management, 129(01), 105–14.

Cheng, M, Su, C and You, H (2003) Optimal Project Organizational Structure for Construction Management. Journal of Construction Engineering and Management, 129(01), 70–79.

Chester, M and Hendrickson, C (2005) Cost Impacts, Scheduling Impacts, and the Claims Process during Construction. Journal of Construction Engineering and Management, 131(01), 102–7.

Cheung, S O and Pang, K H Y (2013) Anatomy of Construction Disputes. Journal of Construction Engineering and Management, 139(01), 15–23.

Chinowsky, P S and Meredith, J E (2000) Strategic Management in Construction. Journal of Construction Engineering and Management, 126(01), 1–9.

Cho, K and Hastak, M (2013) Time and Cost–Optimized Decision Support Model for Fast-Track Projects. Journal of Construction Engineering and Management, 139(01), 90–101.

Cho, Y, Haas, C T, Sreenivasan, S V and Liapi, K (2004) Position Error Modeling for Automated Construction Manipulators. Journal of Construction Engineering and Management, 130(01), 50–58.

Choi, S, Kim, D Y, Han, S H and Kwak, Y H (2014) Conceptual Cost-Prediction Model for Public Road Planning via Rough Set Theory and Case-Based Reasoning. Journal of Construction Engineering and Management, 140(01).

Christian, J and Hachey, D (1995) Effects of Delay Times on Production Rates in Construction. Journal of Construction Engineering and Management, 121(01), 20–26.

Chua, D K and Godinot, M (2006) Use of a WBS Matrix to Improve Interface Management in Projects. Journal of Construction Engineering and Management, 132(01), 67–79.

Chua, D K H, Li, D Z and Chan, W T (2001) Case-Based Reasoning Approach in Bid Decision Making. Journal of Construction Engineering and Management, 127(01), 35–45.

Cohenca, D, Laufer, A and Ledbetter, W B (1989) Factors Affecting Construction Planning Efforts. Journal of Construction Engineering and Management, 115(01), 70–89.

Colin, J and Vanhoucke, M (2016) Empirical Perspective on Activity Durations for Project-Management Simulation Studies. Journal of Construction Engineering and Management, 142(01).

Colwell, D A F and Ariaratnam, S T (2003) Evaluation of High-Density Polyethylene Pipe Installed Using Horizontal Directional Drilling. Journal of Construction Engineering and Management, 129(01), 47–55.

Costa, L, Barbosa, M B A, Baldam, R d L and Coelho, T d P (2019) Challenges of Process Modeling in Architecture and Engineering to Execute Projects and Public Works. Journal of Construction Engineering and Management, 145(01).

Cottrell, W D (1999) Simplified Program Evaluation and Review Technique (PERT). Journal of Construction Engineering and Management, 125(01), 16–22.

Criado-Perez, C, Shinkle, G A, Höllerer, M A, Sharma, A, Collins, C, Gardner, N, Hank Haeusler, M and Pan, S (2022) Digital Transformation in the Australian AEC Industry: Prevailing Issues and Prospective Leadership Thinking. Journal of Construction Engineering and Management, 148(01).

Crowley, L G (1997) Robust Statistical Estimators for Use within Competitive Bid Data. Journal of Construction Engineering and Management, 123(01), 53–63.

Cui, Q, Johnson, P, Quick, A and Hastak, M (2008) Valuing the Warranty Ceiling Clause on New Mexico Highway 44 Using a Binomial Lattice Model. Journal of Construction Engineering and Management, 134(01), 10–17.

Cushman, N S, Nam, C H and Tatum, C B (1992) Technology Transfer in Building Construction—Case of Seismic Design. Journal of Construction Engineering and Management, 118(01), 129–41.

D. A., V (1986) Owner and Contractor Review to Reduce Claims. Journal of Construction Engineering and Management, 112(01), 104–11.

Dai, F, Rashidi, A, Brilakis, I and Vela, P (2013) Comparison of Image-Based and Time-of-Flight-Based Technologies for Three-Dimensional Reconstruction of Infrastructure. Journal of Construction Engineering and Management, 139(01), 69–79.

Daoud, O E K (1997) The Architect/Engineer's Role in Rehabilitation Work. Journal of Construction Engineering and Management, 123(01), 1–5.

Davila Delgado, J M, Oyedele, L, Bilal, M, Ajayi, A, Akanbi, L and Akinade, O (2020) Big Data Analytics System for Costing Power Transmission Projects. Journal of Construction Engineering and Management, 146(01).

Deng, H, Hong, H, Luo, D, Deng, Y and Su, C (2020) Automatic Indoor Construction Process Monitoring for Tiles Based on BIM and Computer Vision. Journal of Construction Engineering and Management, 146(01).

Deng, X, Ding, S and Tian, Q (2004) Reasons underlying a mandatory high penalty construction contract bonding system. Journal of Construction Engineering and Management, 130(01), 67–74.

Dias, A and Ioannou, P G (1996) Company and Project Evaluation Model for Privately Promoted Infrastructure Projects. Journal of Construction Engineering and Management, 122(01), 71–82.

Diaz, C F and Hadipriono, F C (1993) Nondeterministic Networking Methods. Journal of Construction Engineering and Management, 119(01), 40–57.

Diekmann, J E and Nelson, M C (1985) Construction Claims: Frequency and Severity. Journal of Construction Engineering and Management, 111(01), 74–81.

Diekmann, J E and Peppler, S E (1984) Union and Open Shop Labor Cost Differences. Journal of Construction Engineering and Management, 110(01), 87–99.

Dikmen, I and Birgonul, M T (2004) Neural Network Model to Support International Market Entry Decisions. Journal of Construction Engineering and Management, 130(01), 59–66.

Dioguardi, G (1983) Macrofirms: Construction Firms for the Computer Age. Journal of Construction Engineering and Management, 109(01), 13–24.

Dozzi, P, Hartman, F, Tidsbury, N and Ashrafi, R (1996) More-Stable Owner-Contractor Relationships. Journal of Construction Engineering and Management, 122(01), 30–35.

Duerr, D (1990) Lift of Shippingport Reactor Pressure Vessel. Journal of Construction Engineering and Management, 116(01), 188–97.

Dunston, P S and Reed, A G (2000) Benefits of Small Projects Team Initiative. Journal of Construction Engineering and Management, 126(01), 22–28.

Dzeng, R J, Tserng, H P and Wang, W C (2005) Automating Schedule Review for Expressway Construction. Journal of Construction Engineering and Management, 131(01), 127–36.

Dzeng, R J, Wang, W C and Tserng, H P (2004) Module-Based Construction Schedule Administration for Public Infrastructure Agencies. Journal of Construction Engineering and Management, 130(01), 5–14.

Easa, S M (1987) Earthwork Allocations with Nonconstant Unit Costs. Journal of Construction Engineering and Management, 113(01), 34–50.

Echeverry, D, Ibbs, C W and Burati, J (1988) Graduated Unit Price Payment Schedules. Journal of Construction Engineering and Management, 114(01), 1–18.

Echeverry, D, Ibbs, C W and Kim, S (1991) Sequencing Knowledge for Construction Scheduling. Journal of Construction Engineering and Management, 117(01), 118–30.

El Asmar, M, Hanna, A S and Loh, W (2016) Evaluating Integrated Project Delivery Using the Project Quarterback Rating. Journal of Construction Engineering and Management, 142(01).

El-adaway, I H, Ali, G G, Abotaleb, I S and Barber, H M (2020) Studying the Relationship between Stock Prices of Publicly Traded US Construction Companies and Gross Domestic Product: Preliminary Step toward Construction–Economy Nexus. Journal of Construction Engineering and Management, 146(01).

El-Diraby, T E (2012) Epistemology of Construction Informatics. Journal of Construction Engineering and Management, 138(01), 53–65.

El-Rayes, K and Moselhi, O (2001) Optimizing Resource Utilization for Repetitive Construction Projects. Journal of Construction Engineering and Management, 127(01), 18–27.

Elazouni, A M (1997) Constructability Improvement of Steel Silos during Field Operations. Journal of Construction Engineering and Management, 123(01), 21–25.

Elazouni, A M and Gab-Allah, A A (2004) Finance-Based Scheduling of Construction Projects Using Integer Programming. Journal of Construction Engineering and Management, 130(01), 15–24.

Elazouni, A M and Metwally, F G (2007) Expanding Finance-Based Scheduling to Devise Overall-Optimized Project Schedules. Journal of Construction Engineering and Management, 133(01), 86–90.

Elazouni, A M, Ali, A E and Abdel-Razek, R H (2005) Estimating the Acceptability of New Formwork Systems Using Neural Networks. Journal of Construction Engineering and Management, 131(01), 33–41.

Eldin, N N (1991) Management of Engineering/Design Phase. Journal of Construction Engineering and Management, 117(01), 163–75.

Eldin, N N and Egger, S (1990) Productivity Improvement Tool: Camcorders. Journal of Construction Engineering and Management, 116(01), 100–11.

Elmousalami, H H (2020) Artificial Intelligence and Parametric Construction Cost Estimate Modeling: State-of-the-Art Review. Journal of Construction Engineering and Management, 146(01).

Eom, C S and Paek, J H (2009) Risk Index Model for Minimizing Environmental Disputes in Construction. Journal of Construction Engineering and Management, 135(01), 34–41.

  • Type: Journal Article
  • Keywords: Environmental issues; Dispute resolution; Risk management; Site evaluation; Construction management;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2009)135:1(34)
  • Abstract:
    Although the number of environment-related disputes is increasing, no risk management approach exists to minimize such disputes at construction sites. The purpose of this study was to develop an environmental risk index model for general contractors to minimize third-party environmental disputes at construction sites. The analytic hierarchy process is used to weigh and calculate an environmental risk index. A case study demonstrated how to apply this model for risk evaluation, on-site monitoring, and environmental management, whereas a comparative analysis revealed that the model decreased the number of disputes to some degree at sites where it was used. This model makes it possible to minimize environmental disputes in the field effectively.

Ernstsen, S N, Whyte, J, Thuesen, C and Maier, A (2021) How Innovation Champions Frame the Future: Three Visions for Digital Transformation of Construction. Journal of Construction Engineering and Management, 147(01).

Ernzen, J J and Schexnayder, C (2000) One Company's Experience with Design/Build: Labor Cost Risk and Profit Potential. Journal of Construction Engineering and Management, 126(01), 10–14.

Everett, J G and Farghal, S H (1997) Data Representation for Predicting Performance with Learning Curves. Journal of Construction Engineering and Management, 123(01), 46–52.

Everett, J G and Slocum, A H (1993) CRANIUM: Device for Improving Crane Productivity and Safety. Journal of Construction Engineering and Management, 119(01), 23–39.

Everett, J G and Thompson, W S (1995) Experience Modification Rating for Workers' Compensation Insurance. Journal of Construction Engineering and Management, 121(01), 66–79.

Ezeldin, A S and Soliman, A (2009) Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects. Journal of Construction Engineering and Management, 135(01), 42–55.

Fan, S and Tserng, H P (2006) Object-Oriented Scheduling for Repetitive Projects with Soft Logics. Journal of Construction Engineering and Management, 132(01), 35–48.

Farghal, S H and Everett, J G (1997) Learning Curves: Accuracy in Predicting Future Performance. Journal of Construction Engineering and Management, 123(01), 41–45.

Farid, F, Boyer, L T and Kangari, R (1989) Required Return on Investments in Construction. Journal of Construction Engineering and Management, 115(01), 109–25.

Fayek, A (1998) Competitive Bidding Strategy Model and Software System for Bid Preparation. Journal of Construction Engineering and Management, 124(01), 1–10.

Federle, M O, Rowings, J E and DeVany, T S (1993) Model of Career Choice for Craftworkers. Journal of Construction Engineering and Management, 119(01), 105–14.

Fisher, D J and Rajan, N (1996) Automated Constructibility Analysis of Work-Zone Traffic-Control Planning. Journal of Construction Engineering and Management, 122(01), 36–43.

Fisher, D J, O'Neill, M W and Contreras, J C (1995) DS^2: Drilled Shaft Decision Support System. Journal of Construction Engineering and Management, 121(01), 86–94.

Flood, I and Issa, R R A (2010) Empirical Modeling Methodologies for Construction. Journal of Construction Engineering and Management, 136(01), 36–48.

Ford, D N (2002) Achieving Multiple Project Objectives through Contingency Management. Journal of Construction Engineering and Management, 128(01), 30–39.

Ford, D N, Anderson, S D, Damron, A J, de Las Casas, R, Gokmen, N and Kuennen, S T (2004) Managing Constructibility Reviews to Reduce Highway Project Durations. Journal of Construction Engineering and Management, 130(01), 33–42.

Francis, A (2017) Simulating Uncertainties in Construction Projects with Chronographical Scheduling Logic. Journal of Construction Engineering and Management, 143(01).

Franz, B, Leicht, R, Molenaar, K and Messner, J (2017) Impact of Team Integration and Group Cohesion on Project Delivery Performance. Journal of Construction Engineering and Management, 143(01).

Gambatese, J A (2003) Controlled Concrete Demolition Using Expansive Cracking Agents. Journal of Construction Engineering and Management, 129(01), 98–104.

Gambatese, J A and James, D E (2001) Dust Suppression Using Truck-Mounted Water Spray System. Journal of Construction Engineering and Management, 127(01), 53–59.

Gambatese, J A, Pestana, C and Lee, H W (2017) Alignment between Lean Principles and Practices and Worker Safety Behavior. Journal of Construction Engineering and Management, 143(01).

Gao, H, Zhong, B, Luo, H and Chen, W (2022) Computational Geometric Approach for BIM Semantic Enrichment to Support Automated Underground Garage Compliance Checking. Journal of Construction Engineering and Management, 148(01).

Garsden, B R (1995) Postconstruction Evaluation. Journal of Construction Engineering and Management, 121(01), 37–42.

Gibson, G E and Bell, L C (1992) Integrated Data‐Base Systems. Journal of Construction Engineering and Management, 118(01), 50–59.

Gibson, G E and Whittington, D A (2010) Charrettes as a Method for Engaging Industry in Best Practices Research. Journal of Construction Engineering and Management, 136(01), 66–75.

Gilani, G, Pons, O and de la Fuente, A (2022) Sustainability-Oriented Approach to Assist Decision Makers in Building Facade Management. Journal of Construction Engineering and Management, 148(01).

Glavan, J R and Tucker, R L (1991) Forecasting Design‐Related Problems—Case Study. Journal of Construction Engineering and Management, 117(01), 47–65.

Goh, Y M (2015) Empirical Investigation of the Average Deployment Force of Personal Fall-Arrest Energy Absorbers. Journal of Construction Engineering and Management, 141(01).

Goldenberg, M and Shapira, A (2007) Systematic Evaluation of Construction Equipment Alternatives: Case Study. Journal of Construction Engineering and Management, 133(01), 72–85.

Gondia, A, Siam, A, El-Dakhakhni, W and Nassar, A H (2020) Machine Learning Algorithms for Construction Projects Delay Risk Prediction. Journal of Construction Engineering and Management, 146(01).

González, P, González, V, Molenaar, K and Orozco, F (2014) Analysis of Causes of Delay and Time Performance in Construction Projects. Journal of Construction Engineering and Management, 140(01).

Goodrum, P M and Haas, C T (2004) Long-Term Impact of Equipment Technology on Labor Productivity in the U.S. Construction Industry at the Activity Level. Journal of Construction Engineering and Management, 130(01), 124–33.

Gordon, C M (1994) Choosing Appropriate Construction Contracting Method. Journal of Construction Engineering and Management, 120(01), 196–210.

Gosling, J, Naim, M and Towill, D (2013) Identifying and Categorizing the Sources of Uncertainty in Construction Supply Chains. Journal of Construction Engineering and Management, 139(01), 102–10.

Green, S D, Kao, C and Larsen, G D (2010) Contextualist Research: Iterating between Methods While Following an Empirically Grounded Approach. Journal of Construction Engineering and Management, 136(01), 117–26.

Griffis, F H (1992) Bidding Strategy: Winning over Key Competitors. Journal of Construction Engineering and Management, 118(01), 151–65.

Griffis, F H & and Butler, F M (1988) Case for Cost‐Plus Contracting. Journal of Construction Engineering and Management, 114(01), 83–94.

Grimm, C T (1988) Brick Masonry Workmanship Statistics. Journal of Construction Engineering and Management, 114(01), 147–9.

Grimm, C T (1994) Void Mortar Joints: Bane of Brick Masonry. Journal of Construction Engineering and Management, 120(01), 152–61.

Gull, I (2011) Testing of Strength of Recycled Waste Concrete and Its Applicability. Journal of Construction Engineering and Management, 137(01), 1–5.

Ha, S K, Jang, J G, Park, S H and Lee, H K (2015) Advanced Spray Multiple Layup Process for Quality Control of Sprayed FRP Composites Used to Retrofit Concrete Structures. Journal of Construction Engineering and Management, 141(01).

Haas, C and Einstein, H H (2002) Updating the Decision Aids for Tunneling. Journal of Construction Engineering and Management, 128(01), 40–48.

Hadipriono, F C and Wang, H (1986) Analysis of Causes of Falsework Failures in Concrete Structures. Journal of Construction Engineering and Management, 112(01), 112–21.

Haidar, A, Naoum, S, Howes, R and Tah, J (1999) Genetic Algorithms Application and Testing for Equipment Selection. Journal of Construction Engineering and Management, 125(01), 32–38.

Halabya, A and El-Rayes, K (2020) Optimizing the Planning of Pedestrian Facilities Upgrade Projects to Maximize Accessibility for People with Disabilities. Journal of Construction Engineering and Management, 146(01).

Halligan, D W, Demsetz, L A, Brown, J D and Pace, C B (1994) Action‐Response Model and Loss of Productivity in Construction. Journal of Construction Engineering and Management, 120(01), 47–64.

Hallowell, M R and Gambatese, J A (2010) Qualitative Research: Application of the Delphi Method to CEM Research. Journal of Construction Engineering and Management, 136(01), 99–107.

Han, S, Lee, S and Peña-Mora, F (2012) Identification and Quantification of Non-Value-Adding Effort from Errors and Changes in Design and Construction Projects. Journal of Construction Engineering and Management, 138(01), 98–109.

Han, Y, Feng, Z, Zhang, J, Jin, R and Aboagye-Nimo, E (2019) Employees’ Safety Perceptions of Site Hazard and Accident Scenes. Journal of Construction Engineering and Management, 145(01).

Handa, V K (1996) Construction Engineers Driving into the 21st Century . Journal of Construction Engineering and Management, 122(01), 1–6.

Hanna, A S, Camlic, R, Peterson, P A and Nordheim, E V (2002) Quantitative Definition of Projects Impacted by Change Orders. Journal of Construction Engineering and Management, 128(01), 57–64.

Hanna, A S, Chang, C, Lackney, J A and Sullivan, K T (2007) Impact of Overmanning on Mechanical and Sheet Metal Labor Productivity. Journal of Construction Engineering and Management, 133(01), 22–28.

Hanna, A S, Willenbrock, J H and Sanvido, V E (1992) Knowledge Acquisition and Development for Formwork Selection System. Journal of Construction Engineering and Management, 118(01), 179–98.

Hariga, M and El-Sayegh, S M (2011) Cost Optimization Model for the Multiresource Leveling Problem with Allowed Activity Splitting. Journal of Construction Engineering and Management, 137(01), 56–64.

Harris, R A, Bowlby, W and Cohn, L F (1987) Method for Analyzing Construction Haul Noise Impacts. Journal of Construction Engineering and Management, 113(01), 6–16.

Hassan, M M and Gruber, S (2008) Simulation of Concrete Paving Operations on Interstate-74. Journal of Construction Engineering and Management, 134(01), 2–9.

Hassan, M M, Odeh, I and El-Rayes, K (2011) New Approach to Compare Glare and Light Characteristics of Conventional and Balloon Lighting Systems. Journal of Construction Engineering and Management, 137(01), 39–44.

Hauck, A J, Walker, D H T, Hampson, K D and Peters, R J (2004) Project Alliancing at National Museum of Australia—Collaborative Process. Journal of Construction Engineering and Management, 130(01), 143–52.

He, C, McCabe, B, Jia, G and Sun, J (2020) Effects of Safety Climate and Safety Behavior on Safety Outcomes between Supervisors and Construction Workers. Journal of Construction Engineering and Management, 146(01).

Hegazy, T (2006) Computerized System for Efficient Delivery of Infrastructure Maintenance/Repair Programs. Journal of Construction Engineering and Management, 132(01), 26–34.

Hendrickson, C and Horvath, A (2000) Resource Use and Environmental Emissions of U.S. Construction Sectors. Journal of Construction Engineering and Management, 126(01), 38–44.

Herbsman, Z and Ellis, R (1992) Multiparameter Bidding System—Innovation in Contract Administration. Journal of Construction Engineering and Management, 118(01), 142–50.

Herbsman, Z and Mitrani, J D (1984) INES—An Interactive Estimating System. Journal of Construction Engineering and Management, 110(01), 19–33.

Hilf, J W (1987) Rolled Concrete Dams Using Gap‐Graded Aggregate. Journal of Construction Engineering and Management, 113(01), 27–33.

Hinze, J (1987) Qualities of Safe Superintendents. Journal of Construction Engineering and Management, 113(01), 169–71.

Hinze, J and Antal, T (1991) Construction Contract Provisions for Preservation of Artifacts. Journal of Construction Engineering and Management, 117(01), 106–17.

Hinze, J and Bren, K (1996) Identifying OSHA Paragraphs of Particular Interest. Journal of Construction Engineering and Management, 122(01), 98–100.

Hinze, J, Hirakawa, J and Benjamin, N (1989) Comparison of Labor Agreements. Journal of Construction Engineering and Management, 115(01), 90–107.

Hinze, J, Pedersen, C and Fredley, J (1998) Identifying Root Causes of Construction Injuries. Journal of Construction Engineering and Management, 124(01), 67–71.

Ho, S P and Liu, L Y (2004) Analytical Model for Analyzing Construction Claims and Opportunistic Bidding. Journal of Construction Engineering and Management, 130(01), 94–104.

Ho, S P and Liu, L Y (2003) How to Evaluate and Invest in Emerging A/E/C Technologies under Uncertainty. Journal of Construction Engineering and Management, 129(01), 16–24.

Horman, M J and Kenley, R (2005) Quantifying Levels of Wasted Time in Construction with Meta-Analysis. Journal of Construction Engineering and Management, 131(01), 52–61.

Hosseinian, S M and Tavakoli, M (2023) Markets, Hierarchies, or Hybrids as Alternative Governance Structures in Construction Contracts: Transaction Cost Economics Analysis. Journal of Construction Engineering and Management, 149(01).

Hosseinian, S M, Andalib, M and Carmichael, D G (2022) Appropriate Types of Payments in Construction Contracts Based on Agency Theory Parameters. Journal of Construction Engineering and Management, 148(01).

Householder, J L and Rutland, H E (1990) Who Owns Float?. Journal of Construction Engineering and Management, 116(01), 130–3.

Hu, F, Liao, R and Chen, J (2023) Calculation Methods to Optimize the Number of Pedestals and Evaluate Production Plans for Precast Yards Fabricating Prestressed Bridge Beams and Precast Segments for Poststressed Segmental Erection. Journal of Construction Engineering and Management, 149(01).

Hu, H and Zhu, Y (2015) Social Welfare–Based Concession Model for Build/Operate/Transfer Contracts. Journal of Construction Engineering and Management, 141(01).

Hu, Y, Liu, M, Le, Y and Skitmore, M (2022) External Consultant Involvement for Organizational Capability Building in Complex Construction Projects: A Perspective from Interorganizational Learning Process. Journal of Construction Engineering and Management, 148(01).

Huang, C and Wong, C K (2017) Discretized Cell Modeling for Optimal Facility Layout Plans of Unequal and Irregular Facilities. Journal of Construction Engineering and Management, 143(01).

Huang, X, Bernd, D and Bernold, L E (1996) Innovative Technology Development for Safe Excavation. Journal of Construction Engineering and Management, 122(01), 91–96.

Ibbs, C W and Terveer, K R (1984) Integrated Construction Preventive Maintenance System. Journal of Construction Engineering and Management, 110(01), 43–59.

Inayat, A, Melhem, H and Esmaeily, A (2015) Critical Success Factors in an Agency Construction Management Environment. Journal of Construction Engineering and Management, 141(01).

Ioannou, P G and Leu, S (1993) Average‐Bid Method—Competitive Bidding Strategy. Journal of Construction Engineering and Management, 119(01), 131–47.

Jaafari, A and Schub, A (1990) Surviving Failures: Lessons from Field Study. Journal of Construction Engineering and Management, 116(01), 68–86.

Jaafari, A, Manivong, K K and Chaaya, M (2001) VIRCON: Interactive System for Teaching Construction Management. Journal of Construction Engineering and Management, 127(01), 66–75.

Jahren, C T and Hancher, D E (1989) Evaluation of New Concepts for Cellular Structure Construction. Journal of Construction Engineering and Management, 115(01), 15–34.

Jaraiedi, M, Plummer, R W and Aber, M S (1995) Incentive/Disincentive Guidelines for Highway Construction Contracts. Journal of Construction Engineering and Management, 121(01), 112–20.

Jarkas, A M (2012) Buildability Factors Influencing Concreting Labor Productivity. Journal of Construction Engineering and Management, 138(01), 89–97.

Jaselskis, E J, Anderson, S D and Russell, J S (1996) Strategies for Achieving Excellence in Construction Safety Performance. Journal of Construction Engineering and Management, 122(01), 61–70.

Jaselskis, E J, Han, H C, Grigas, J, Tan, L and Fahrion, D (2001) Status of Roller Mountable Microwave Asphalt Pavement Density Sensor. Journal of Construction Engineering and Management, 127(01), 46–52.

Jaselskis, E J, Kurtenbach, J M and Forrest, J (2002) Enhancing Financial Success Among Electrical Contractors. Journal of Construction Engineering and Management, 128(01), 65–75.

Jayawardane, A K W and Harris, F C (1990) Further Development of Integer Programming in Earthwork Optimization. Journal of Construction Engineering and Management, 116(01), 18–34.

Jeelani, I, Albert, A, Han, K and Azevedo, R (2019) Are Visual Search Patterns Predictive of Hazard Recognition Performance? Empirical Investigation Using Eye-Tracking Technology. Journal of Construction Engineering and Management, 145(01).

Jeljeli, M N, Russell, J S, Meyer, H W G and Vonderohe, A P (1993) Potential Applications of Geographic Information Systems to Construction Industry. Journal of Construction Engineering and Management, 119(01), 72–86.

Ji, S, Park, M and Lee, H (2012) Case Adaptation Method of Case-Based Reasoning for Construction Cost Estimation in Korea. Journal of Construction Engineering and Management, 138(01), 43–52.

John, S T, Sarkar, P and Davis, R (2023) A Long-Range Wide-Area Network System for Monitoring Early-Age Concrete Compressive Strength. Journal of Construction Engineering and Management, 149(01).

Johnson, K D and Tatum, C B (1993) Technology in Marine Construction Firms. Journal of Construction Engineering and Management, 119(01), 148–62.

Joubert, F, Steyn, E and Pretorius, L (2021) Using the HAZOP Method to Conduct a Risk Assessment on the Dismantling of Large Industrial Machines and Associated Structures: Case Study. Journal of Construction Engineering and Management, 147(01).

Joukar, A and Nahmens, I (2016) Volatility Forecast of Construction Cost Index Using General Autoregressive Conditional Heteroskedastic Method. Journal of Construction Engineering and Management, 142(01).

Jung, Y and Kang, S (2007) Knowledge-Based Standard Progress Measurement for Integrated Cost and Schedule Performance Control. Journal of Construction Engineering and Management, 133(01), 10–21.

Kaiser, M J, Pulsipher, A G and Byrd, R C (2005) Cost of Abrasive Cutting in Decommissioning Operations in the Gulf of Mexico. Journal of Construction Engineering and Management, 131(01), 137–48.

Kaiser, M J, Pulsipher, A G and Martin, J (2005) Cost of Site Clearance and Verification Operations in the Gulf of Mexico. Journal of Construction Engineering and Management, 131(01), 117–26.

Kandil, A, El-Rayes, K and El-Anwar, O (2010) Optimization Research: Enhancing the Robustness of Large-Scale Multiobjective Optimization in Construction. Journal of Construction Engineering and Management, 136(01), 17–25.

Kangari, R and Halpin, D W (1989) Potential Robotics Utilization in Construction. Journal of Construction Engineering and Management, 115(01), 126–43.

Kangari, R and Miyatake, Y (1997) Developing and Managing Innovative Construction Technologies in Japan. Journal of Construction Engineering and Management, 123(01), 72–78.

Karshenas, S (1984) Predesign Cost Estimating Method for Multistory Buildings. Journal of Construction Engineering and Management, 110(01), 79–86.

Kartam, N A (1996) Making Effective Use of Construction Lessons Learned in Project Life Cycle. Journal of Construction Engineering and Management, 122(01), 14–21.

Kartam, S, Ballard, G and Ibbs, C W (1997) Introducing a New Concept and Approach to Modeling Construction. Journal of Construction Engineering and Management, 123(01), 89–97.

Kashiwagi, K, Rubin, R A and Harris, M R (1988) Construction Law and Practice in Japan. Journal of Construction Engineering and Management, 114(01), 104–13.

Kelley, M N (1993) Second Roebling Lecture 1991. Journal of Construction Engineering and Management, 119(01), 1–5.

Kerr, W C, Tamaro, G J and Hahn, D M (1992) Exchange Place Station Subsurface Reconstruction and Improvements. Journal of Construction Engineering and Management, 118(01), 166–78.

Khalafallah, A and El-Rayes, K (2008) Minimizing Construction-Related Security Risks during Airport Expansion Projects. Journal of Construction Engineering and Management, 134(01), 40–48.

Khalef, R and El-adaway, I H (2023) Identifying Design-Build Decision-Making Factors and Providing Future Research Guidelines: Social Network and Association Rule Analysis. Journal of Construction Engineering and Management, 149(01).

Kibert, C J and Coble, R J (1995) Integrating Safety and Environmental Regulation of Construction Industry. Journal of Construction Engineering and Management, 121(01), 95–99.

Kim, B and Hong, T (2012) Revised Case-Based Reasoning Model Development Based on Multiple Regression Analysis for Railroad Bridge Construction. Journal of Construction Engineering and Management, 138(01), 154–62.

Kim, H and Ham, Y (2021) Increasing Reliability of Participatory Sensing for Utility Pole Condition Assessment Using Fuzzy Inference. Journal of Construction Engineering and Management, 147(01).

King, R (1987) Designing Plans for Constructibility. Journal of Construction Engineering and Management, 113(01), 1–5.

Kinner, E B and Stimpson, W E (1983) Artesian Pressure Relief for Trident Drydock. Journal of Construction Engineering and Management, 109(01), 74–88.

Kirby, J G, Furry, D A and Hicks, D K (1988) Improvements in Design Review Management. Journal of Construction Engineering and Management, 114(01), 69–82.

Kitamura, A and Takeuchi, Y (1983) Seikan Tunnel. Journal of Construction Engineering and Management, 109(01), 25–38.

Korb, S and Sacks, R (2021) Agent-Based Simulation of General Contractor–Subcontractor Interactions in a Multiproject Environment. Journal of Construction Engineering and Management, 147(01).

Krizek, R J, Lo, W and Hadavi, A (1996) Lessons Learned from Multiphase Reconstruction Project. Journal of Construction Engineering and Management, 122(01), 44–54.

Laryea, S and Lubbock, A (2014) Tender Pricing Environment of Subcontractors in the United Kingdom. Journal of Construction Engineering and Management, 140(01).

Laufer, A (1985) On Site Performance Improvement Programs. Journal of Construction Engineering and Management, 111(01), 82–97.

Laufer, A and Cohenca, D (1990) Factors Affecting Construction‐Planning Outcomes. Journal of Construction Engineering and Management, 116(01), 135–56.

Laufer, A and Moore, B E (1983) Attitudes toward Productivity Pay Programs. Journal of Construction Engineering and Management, 109(01), 89–101.

Laufer, A and Shohet, I M (1991) Span of Control of Construction Foreman: Situational Analysis. Journal of Construction Engineering and Management, 117(01), 90–105.

Ledbetter, B S (1985) Pioneering Construction Engineering Education. Journal of Construction Engineering and Management, 111(01), 41–51.

Ledbetter, W B (1994) Quality Performance on Successful Project. Journal of Construction Engineering and Management, 120(01), 34–46.

Lee, C, Won, J and Lee, E (2019) Method for Predicting Raw Material Prices for Product Production over Long Periods. Journal of Construction Engineering and Management, 145(01).

Lee, D and Arditi, D (2006) Total Quality Performance of Design/Build Firms Using Quality Function Deployment. Journal of Construction Engineering and Management, 132(01), 49–57.

Lee, D and Shi, J J (2006) Construction Business Automation System. Journal of Construction Engineering and Management, 132(01), 88–96.

Lee, D, Wen, L, Choi, J O and Lee, S (2023) Sensor-Integrated Hybrid Blockchain System for Supply Chain Coordination in Volumetric Modular Construction. Journal of Construction Engineering and Management, 149(01).

Lee, E, Roesler, J, Harvey, J T and Ibbs, C W (2002) Case Study of Urban Concrete Pavement Reconstruction on Interstate 10. Journal of Construction Engineering and Management, 128(01), 49–56.

Lee, J and Hyun, H (2019) Multiple Modular Building Construction Project Scheduling Using Genetic Algorithms. Journal of Construction Engineering and Management, 145(01).

Lee, J, Lorenc, S J and Bernold, L E (2003) Comparative Performance Evaluation of Tele-Operated Pipe Laying. Journal of Construction Engineering and Management, 129(01), 32–40.

Lee, S M and Olson, D L (1983) Chance Constrained Aggregate Blending. Journal of Construction Engineering and Management, 109(01), 39–47.

Leicht, R M, Hunter, S T, Saluja, C and Messner, J I (2010) Implementing Observational Research Methods to Study Team Performance in Construction Management. Journal of Construction Engineering and Management, 136(01), 76–86.

Leung, M and Chan, I Y S (2012) Exploring Stressors of Hong Kong Expatriate Construction Professionals in Mainland China: Focus Group Study. Journal of Construction Engineering and Management, 138(01), 78–88.

Lhee, S C, Issa, R R A and Flood, I (2012) Prediction of Financial Contingency for Asphalt Resurfacing Projects using Artificial Neural Networks. Journal of Construction Engineering and Management, 138(01), 22–30.

Li, D and Lu, M (2017) Automated Generation of Work Breakdown Structure and Project Network Model for Earthworks Project Planning: A Flow Network-Based Optimization Approach. Journal of Construction Engineering and Management, 143(01).

Li, H, Arditi, D and Wang, Z (2013) Factors That Affect Transaction Costs in Construction Projects. Journal of Construction Engineering and Management, 139(01), 60–68.

Li, M, Baek, M and Ashuri, B (2021) Forecasting Ratio of Low Bid to Owner’s Estimate for Highway Construction. Journal of Construction Engineering and Management, 147(01).

Li, S (1996) New Approach for Optimization of Overall Construction Schedule. Journal of Construction Engineering and Management, 122(01), 7–13.

Li, X, Han, S, Gül, M, Al-Hussein, M and El-Rich, M (2018) 3D Visualization-Based Ergonomic Risk Assessment and Work Modification Framework and Its Validation for a Lifting Task. Journal of Construction Engineering and Management, 144(01).

Li, Y and Chen, J (2022) Computer Vision–Based Counting Model for Dense Steel Pipe on Construction Sites. Journal of Construction Engineering and Management, 148(01).

Li, Y, Cao, L, Han, Y and Wei, J (2020) Development of a Conceptual Benchmarking Framework for Healthcare Facilities Management: Case Study of Shanghai Municipal Hospitals. Journal of Construction Engineering and Management, 146(01).

Li, Y, Nie, X and Chen, S (2007) Fuzzy Approach to Prequalifying Construction Contractors. Journal of Construction Engineering and Management, 133(01), 40–49.

Liang, R, Xue, Z and Chong, H (2023) Risk Evaluation of Logistics Park Projects’ Lifecycle during the COVID-19 Pandemic: Failure Mode and Effects Analysis. Journal of Construction Engineering and Management, 149(01).

Lin, C, Chih, Y and Tsay, Y (2022) Determinants of the Adoption of Green Building Simulation Technologies in Architectural Design Practices in Taiwan. Journal of Construction Engineering and Management, 148(01).

Ling, F Y Y, Chan, S L, Chong, E and Ee, L P (2004) Predicting Performance of Design-Build and Design-Bid-Build Projects. Journal of Construction Engineering and Management, 130(01), 75–83.

Ling, F Y Y, Ke, Y, Kumaraswamy, M M and Wang, S (2014) Key Relational Contracting Practices Affecting Performance of Public Construction Projects in China. Journal of Construction Engineering and Management, 140(01).

Liou, F and Borcherding, J D (1986) Work Sampling Can Predict Unit Rate Productivity. Journal of Construction Engineering and Management, 112(01), 90–103.

Liou, F and Huang, C (2008) Automated Approach to Negotiations of BOT Contracts with the Consideration of Project Risk. Journal of Construction Engineering and Management, 134(01), 18–24.

Liu, L and Zhu, K (2007) Improving Cost Estimates of Construction Projects Using Phased Cost Factors. Journal of Construction Engineering and Management, 133(01), 91–95.

Liu, T, Mao, Y and Lu, S (2023) Fostering Participants’ Collaborative Innovation Performance in Megaprojects: The Effects of Perceived Partners’ Non-Mediated Power. Journal of Construction Engineering and Management, 149(01).

Lohne, J, Klakegg, O J and Lædre, O (2023) Understanding the Potential for Criminal Activity in the Norwegian AEC Industry: A Building Process Perspective. Journal of Construction Engineering and Management, 149(01).

Loper, J H, Marquis, E L and Rhomberg, E J (1988) Precast Prestressed Long‐Span Bridges. Journal of Construction Engineering and Management, 114(01), 95–103.

Love, P E D (2002) Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects. Journal of Construction Engineering and Management, 128(01), 18–29.

Love, P E D, Matthews, J and Fang, W (2021) Envisioning Rework in Practice: Emergent Insights from a Longitudinal Study. Journal of Construction Engineering and Management, 147(01).

Lu, M and Lam, H (2008) Critical Path Scheduling under Resource Calendar Constraints. Journal of Construction Engineering and Management, 134(01), 25–31.

Lu, M, Shen, X and Chen, W (2009) Automated Collection of Mixer Truck Operations Data in Highly Dense Urban Areas. Journal of Construction Engineering and Management, 135(01), 17–23.

Lu, W, Ye, M, Flanagan, R and Ye, K (2016) Corporate Social Responsibility Disclosures in International Construction Business: Trends and Prospects. Journal of Construction Engineering and Management, 142(01).

Lucko, G (2011) Integrating Efficient Resource Optimization and Linear Schedule Analysis with Singularity Functions. Journal of Construction Engineering and Management, 137(01), 45–55.

Lucko, G and Mitchell, Z W (2010) Quantitative Research: Preparation of Incongruous Economic Data Sets for Archival Data Analysis. Journal of Construction Engineering and Management, 136(01), 49–57.

Lucko, G and Rojas, E M (2010) Research Validation: Challenges and Opportunities in the Construction Domain. Journal of Construction Engineering and Management, 136(01), 127–35.

Lucko, G, Vorster, M C and Anderson-Cook, C M (2007) Unknown Element of Owning Costs—Impact of Residual Value. Journal of Construction Engineering and Management, 133(01), 3–9.

Ma, L, Guo, H and Fang, Y (2021) Analysis of Construction Workers’ Safety Behavior Based on Myers-Briggs Type Indicator Personality Test in a Bridge Construction Project. Journal of Construction Engineering and Management, 147(01).

Ma, Q, Li, S and Cheung, S O (2022) Unveiling Embedded Risks in Integrated Project Delivery. Journal of Construction Engineering and Management, 148(01).

Maloney, W F and McFillen, J M (1995) Job Characteristics: Union-Nonunion Differences. Journal of Construction Engineering and Management, 121(01), 43–54.

Maloney, W F and McFillen, J M (1986) Motivation in Unionized Construction. Journal of Construction Engineering and Management, 112(01), 122–36.

Maloney, W F and McFillen, J M (1986) Motivational Implications of Construction Work. Journal of Construction Engineering and Management, 112(01), 137–51.

Maloney, W F and McFillen, J M (1985) Valence of and Satisfaction with Job Outcomes. Journal of Construction Engineering and Management, 111(01), 53–73.

Maqsoom, A, Wazir, S J, Choudhry, R M, Thaheem, M J and Zahoor, H (2020) Influence of Perceived Fairness on Contractors’ Potential to Dispute: Moderating Effect of Engineering Ethics. Journal of Construction Engineering and Management, 146(01).

Martin, G L (1988) Training Programs for Engineering Consulting Firms. Journal of Construction Engineering and Management, 114(01), 121–32.

Martinez, J C (2010) Methodology for Conducting Discrete-Event Simulation Studies in Construction Engineering and Management. Journal of Construction Engineering and Management, 136(01), 3–16.

Marzouk, M and Moselhi, O (2004) Multiobjective Optimization of Earthmoving Operations. Journal of Construction Engineering and Management, 130(01), 105–13.

Matsuzaki, M, Uchikawa, C and Mitamura, T (1990) Advanced Fabrication and Erection Techniques for Long Suspension Bridge Cables. Journal of Construction Engineering and Management, 116(01), 112–29.

Matthews, J C and Stowe, R (2015) Critical Data Needs Associated with Asbestos Cement Pipe Renewal Methods. Journal of Construction Engineering and Management, 141(01).

Mattila, K G and Park, A (2003) Comparison of Linear Scheduling Model and Repetitive Scheduling Method. Journal of Construction Engineering and Management, 129(01), 56–64.

Mayo, R E and Liu, G (1995) Reform Agenda of Chinese Construction Industry. Journal of Construction Engineering and Management, 121(01), 80–85.

McCabe, B, AbouRizk, S and Gavin, J (2002) Time of Sampling Strategies for Asphalt Pavement Quality Assurance. Journal of Construction Engineering and Management, 128(01), 85–89.

McFillen, J M and Maloney, W F (1986) Human Resource Data in the Construction Industry. Journal of Construction Engineering and Management, 112(01), 22–32.

Meduri, S S and Annamalai, T R (2013) Unit Costs of Public and PPP Road Projects: Evidence from India. Journal of Construction Engineering and Management, 139(01), 35–43.

Mei, X, Zhou, X, Xu, F and Zhang, Z (2023) Human Intrusion Detection in Static Hazardous Areas at Construction Sites: Deep Learning–Based Method. Journal of Construction Engineering and Management, 149(01).

Mills, A, Love, P E and Williams, P (2009) Defect Costs in Residential Construction. Journal of Construction Engineering and Management, 135(01), 12–16.

Minato, T and Ashley, D B (1998) Data-Driven Analysis of “Corporate Risk” Using Historical Cost-Control Data. Journal of Construction Engineering and Management, 124(01), 42–47.

Minchin, R E and Thomas, H R (2003) Validation of Vibration-Based Onboard Asphalt Density Measuring System. Journal of Construction Engineering and Management, 129(01), 1–7.

Minchin, R E, Cui, S, Walters, R C, Issa, R and Pan, J (2013) Sino-American Opinions and Perceptions of Counterfeiting in the Construction Supply Chain. Journal of Construction Engineering and Management, 139(01), 1–8.

Mitropoulos, P and Namboodiri, M (2011) New Method for Measuring the Safety Risk of Construction Activities: Task Demand Assessment. Journal of Construction Engineering and Management, 137(01), 30–38.

Mohamad, M and Tran, D Q (2021) Risk-Based Prioritization Approach to Construction Inspections for Transportation Projects. Journal of Construction Engineering and Management, 147(01).

Mohamed, S (2003) Scorecard Approach to Benchmarking Organizational Safety Culture in Construction. Journal of Construction Engineering and Management, 129(01), 80–88.

Mohan, S (1990) Expert Systems Applications in Construction Management and Engineering. Journal of Construction Engineering and Management, 116(01), 87–99.

Mondorf, P E, Kuprenas, J A and Kordahi, E N (1997) Segmental Cantilever Bridge Construction Case Study. Journal of Construction Engineering and Management, 123(01), 79–84.

Moon, S, Lee, G, Chi, S and Oh, H (2021) Automated Construction Specification Review with Named Entity Recognition Using Natural Language Processing. Journal of Construction Engineering and Management, 147(01).

Morad, A A and Beliveau, Y J (1991) Knowledge‐Based Planning System. Journal of Construction Engineering and Management, 117(01), 1–12.

Moussa, M, Ruwanpura, J and Jergeas, G (2007) CTAN for Risk Assessments Using Multilevel Stochastic Networks. Journal of Construction Engineering and Management, 133(01), 96–101.

Moussavi Nadoushani, Z S, Hammad, A W A and Akbarnezhad, A (2017) Location Optimization of Tower Crane and Allocation of Material Supply Points in a Construction Site Considering Operating and Rental Costs. Journal of Construction Engineering and Management, 143(01).

Mulholland, B and Christian, J (1999) Risk Assessment in Construction Schedules. Journal of Construction Engineering and Management, 125(01), 8–15.

Murguia, D, Vasquez, C, Demian, P and Soetanto, R (2023) BIM Adoption among Contractors: A Longitudinal Study in Peru. Journal of Construction Engineering and Management, 149(01).

Murtaza, M B, Fisher, D J and Skibniewski, M J (1993) Knowledge‐Based Approach to Modular Construction Decision Support. Journal of Construction Engineering and Management, 119(01), 115–30.

Mustaffa, N K (2022) Alternative Configurations of Earthmoving Loading Practices toward Emissions Reduction. Journal of Construction Engineering and Management, 148(01).

Narbaev, T and De Marco, A (2014) Combination of Growth Model and Earned Schedule to Forecast Project Cost at Completion. Journal of Construction Engineering and Management, 140(01).

Nash, W R (1985) Raise Boring in Civil and Mining Applications. Journal of Construction Engineering and Management, 111(01), 15–30.

Nasirian, A, Arashpour, M and Abbasi, B (2019) Critical Literature Review of Labor Multiskilling in Construction. Journal of Construction Engineering and Management, 145(01).

Navon, R (1996) Company-Level Cash-Flow Management. Journal of Construction Engineering and Management, 122(01), 22–29.

Navon, R (1995) Economic Benefits of Lightweight versus Conventional Construction Methods. Journal of Construction Engineering and Management, 121(01), 27–36.

Newaz, M T, Davis, P, Jefferies, M and Pillay, M (2020) Examining the Psychological Contract as Mediator between the Safety Behavior of Supervisors and Workers on Construction Sites. Journal of Construction Engineering and Management, 146(01).

Nicholls, R (1991) Sandwich‐Barrel Shell Construction by Inflation. Journal of Construction Engineering and Management, 117(01), 131–47.

Nichols, J (2018) Reverse Auction Bidding: Studying Player Behavior. Journal of Construction Engineering and Management, 144(01).

Ning, Y and Ling, F Y Y (2014) Boosting Public Construction Project Outcomes through Relational Transactions. Journal of Construction Engineering and Management, 140(01).

Nitithamyong, P and Skibniewski, M J (2006) Success/Failure Factors and Performance Measures of Web-Based Construction Project Management Systems: Professionals’ Viewpoint. Journal of Construction Engineering and Management, 132(01), 80–87.

O'Connor, J T and El-Diraby, T E (2000) Urban Freeway Bridge Reconstruction Planning: Case of Mockingbird Bridge. Journal of Construction Engineering and Management, 126(01), 61–67.

O'Connor, J T and Tucker, R L (1986) Industrial Project Constructability Improvement. Journal of Construction Engineering and Management, 112(01), 69–82.

Oberlender, G D and Hughes, R K (1987) Graduate Construction Programs in the United States. Journal of Construction Engineering and Management, 113(01), 17–26.

Oglesby, C H (1990) Dilemmas Facing Construction Education and Research in 1990s. Journal of Construction Engineering and Management, 116(01), 4–17.

Ohrn, L G and Schexnayder, C (1998) Performance-Related Specifications for Highway Construction. Journal of Construction Engineering and Management, 124(01), 25–30.

Okpala, I, Nnaji, C and Gambatese, J (2023) Assessment Tool for Human–Robot Interaction Safety Risks during Construction Operations. Journal of Construction Engineering and Management, 149(01).

Oliveros, A V O and Fayek, A R (2005) Fuzzy Logic Approach for Activity Delay Analysis and Schedule Updating. Journal of Construction Engineering and Management, 131(01), 42–51.

Oloufa, A A, Eltahan, A A and Papacostas, C S (1994) Integrated GIS for Construction Site Investigation. Journal of Construction Engineering and Management, 120(01), 211–22.

Oyetunji, A A and Anderson, S D (2006) Relative Effectiveness of Project Delivery and Contract Strategies. Journal of Construction Engineering and Management, 132(01), 3–13.

Pérez, D, Lagos, C and Fernando Alarcón, L (2022) Key Last Planner System Metrics to Assess Project Performance in High-Rise Building and Industrial Construction Projects. Journal of Construction Engineering and Management, 148(01).

Panas, A and Pantouvakis, J P (2014) Simulation-Based and Statistical Analysis of the Learning Effect in Floating Caisson Construction Operations. Journal of Construction Engineering and Management, 140(01).

Park, J, Marks, E, Cho, Y K and Suryanto, W (2016) Performance Test of Wireless Technologies for Personnel and Equipment Proximity Sensing in Work Zones. Journal of Construction Engineering and Management, 142(01).

Park, K, Hwang, Y, Seo, S and Seo, H (2003) Quantitative Assessment of Environmental Impacts on Life Cycle of Highways. Journal of Construction Engineering and Management, 129(01), 25–31.

Patel, D A and Jha, K N (2017) Developing a Process to Evaluate Construction Project Safety Hazard Index Using the Possibility Approach in India. Journal of Construction Engineering and Management, 143(01).

Patel, D A and Jha, K N (2015) Neural Network Model for the Prediction of Safe Work Behavior in Construction Projects. Journal of Construction Engineering and Management, 141(01).

Pavitt, T C and Gibb, A G F (2003) Interface Management within Construction: In Particular, Building Facade. Journal of Construction Engineering and Management, 129(01), 8–15.

Peña-Mora, F and Li, M (2001) Dynamic Planning and Control Methodology for Design/Build Fast-Track Construction Projects. Journal of Construction Engineering and Management, 127(01), 1–17.

Pereira, E, Ali, M, Wu, L and Abourizk, S (2020) Distributed Simulation–Based Analytics Approach for Enhancing Safety Management Systems in Industrial Construction. Journal of Construction Engineering and Management, 146(01).

Perera, S (1983) Resource Sharing in Linear Construction. Journal of Construction Engineering and Management, 109(01), 102–11.

Phelan, R S, Radjy, F, Haas, C and Hendrickson, C (1990) Computer‐Aided Concrete‐Placement Optimization. Journal of Construction Engineering and Management, 116(01), 172–87.

Phelps, A F and Horman, M J (2010) Ethnographic Theory-Building Research in Construction. Journal of Construction Engineering and Management, 136(01), 58–65.

Plebankiewicz, E and Kubek, D (2016) Multicriteria Selection of the Building Material Supplier Using AHP and Fuzzy AHP. Journal of Construction Engineering and Management, 142(01).

Polat, G, Arditi, D and Mungen, U (2007) Simulation-Based Decision Support System for Economical Supply Chain Management of Rebar. Journal of Construction Engineering and Management, 133(01), 29–39.

Prasertrungruang, T and Hadikusumo, B H (2009) Study of Factors Influencing the Efficient Management and Downtime Consequences of Highway Construction Equipment in Thailand. Journal of Construction Engineering and Management, 135(01), 2–11.

Rajagopalan, K S (1988) Supports for Traveling Cranes: Case History. Journal of Construction Engineering and Management, 114(01), 114–20.

Randolph Thomas, H and Horman, M J (2006) Fundamental Principles of Workforce Management. Journal of Construction Engineering and Management, 132(01), 97–104.

Rashidi, A, Jazebi, F and Brilakis, I (2011) Neurofuzzy Genetic System for Selection of Construction Project Managers. Journal of Construction Engineering and Management, 137(01), 17–29.

RazaviAlavi, S and AbouRizk, S (2017) Genetic Algorithm–Simulation Framework for Decision Making in Construction Site Layout Planning. Journal of Construction Engineering and Management, 143(01).

Regan, M, Smith, J and Love, P E D (2011) Impact of the Capital Market Collapse on Public-Private Partnership Infrastructure Projects. Journal of Construction Engineering and Management, 137(01), 6–16.

Riad, N I, Arditi, D and Mohammadi, J (1994) Integrated System for Managing Owner‐Directed Project Acceleration. Journal of Construction Engineering and Management, 120(01), 77–95.

Ringwald, R C (1986) General Overhead Distribution to Project Costs. Journal of Construction Engineering and Management, 112(01), 83–89.

Rojas, E M and Aramvareekul, P (2003) Is Construction Labor Productivity Really Declining?. Journal of Construction Engineering and Management, 129(01), 41–46.

Roofigari-Esfahan, N, Paez, A and N.Razavi, S (2015) Location-Aware Scheduling and Control of Linear Projects: Introducing Space-Time Float Prisms. Journal of Construction Engineering and Management, 141(01).

Roseefeld, Y, Warszawski, A and Laufer, A (1992) Using Quality Circles to Raise Productivity and Quality of Work Life. Journal of Construction Engineering and Management, 118(01), 17–33.

Rosenfeld, Y (2014) Root-Cause Analysis of Construction-Cost Overruns. Journal of Construction Engineering and Management, 140(01).

Rowings, J E, Federle, M O and Birkland, S A (1996) Characteristics of the Craft Workforce. Journal of Construction Engineering and Management, 122(01), 83–90.

Rowings, J E, Federle, M O and Rusk, J (2000) Design/Build Methods for Electrical Contracting Industry. Journal of Construction Engineering and Management, 126(01), 15–21.

Rubio-Romero, J C, Rubio, M C and García-Hernández, C (2013) Analysis of Construction Equipment Safety in Temporary Work at Height. Journal of Construction Engineering and Management, 139(01), 9–14.

Russell, A D and Caselton, W F (1988) Extensions to Linear Scheduling Optimization. Journal of Construction Engineering and Management, 114(01), 36–52.

Russell, A D and Fayek, A (1994) Automated Corrective Action Selection Assistant. Journal of Construction Engineering and Management, 120(01), 11–33.

Russell, J S, Gugel, J G and Radtke, M W (1994) Comparative Analysis of Three Constructability Approaches. Journal of Construction Engineering and Management, 120(01), 180–95.

Russell, J S, Jaselskis, E J and Lawrence, S P (1997) Continuous Assessment of Project Performance. Journal of Construction Engineering and Management, 123(01), 64–71.

Russell, J S, Skibniewski, M J and Cozier, D R (1990) Qualifier‐2: Knowledge‐Based System for Contractor Prequalification. Journal of Construction Engineering and Management, 116(01), 157–71.

Rwelamila, P D (1994) Group Dynamics and Construction Project Manager. Journal of Construction Engineering and Management, 120(01), 3–10.

Ryu, J, Banting, B, Abdel-Rahman, E and Haas, C T (2023) Ergonomic Characteristics of Expert Masons. Journal of Construction Engineering and Management, 149(01).

Ryu, J, Seo, J, Jebelli, H and Lee, S (2019) Automated Action Recognition Using an Accelerometer-Embedded Wristband-Type Activity Tracker. Journal of Construction Engineering and Management, 145(01).

Saad, I M H and Hancher, D E (1998) Multimedia for Construction Project Management: Project Navigator. Journal of Construction Engineering and Management, 124(01), 82–89.

Sachs, T and Tiong, R L (2009) Quantifying Qualitative Information on Risks: Development of the QQIR Method. Journal of Construction Engineering and Management, 135(01), 56–71.

Said, H M and Reginato, J (2018) Impact of Design Changes on Virtual Design and Construction Performance for Electrical Contractors. Journal of Construction Engineering and Management, 144(01).

Salman, A F M, Skibniewski, M J and Basha, I (2007) BOT Viability Model for Large-Scale Infrastructure Projects. Journal of Construction Engineering and Management, 133(01), 50–63.

Sanders, S R and Thomas, H R (1993) Masonry Productivity Forecasting Model. Journal of Construction Engineering and Management, 119(01), 163–79.

Sanvido, V, Grobler, F, Parfitt, K, Guvenis, M and Coyle, M (1992) Critical Success Factors for Construction Projects. Journal of Construction Engineering and Management, 118(01), 94–111.

Saxena, S K, Lourie, D E, Shah, N S and Singhal, K (1984) Equipment Cost Analysis for Waste Embankments. Journal of Construction Engineering and Management, 110(01), 60–71.

Schexnayder, C, Weber, S L and Brooks, B T (1999) Effect of Truck Payload Weight on Production. Journal of Construction Engineering and Management, 125(01), 1–7.

Schlick, H (1986) Construction of a Semi‐Prefabricated Masonry Facade. Journal of Construction Engineering and Management, 112(01), 62–68.

Senior, B A and Halpin, D W (1998) Simplified Simulation System for Construction Projects. Journal of Construction Engineering and Management, 124(01), 72–81.

Senouci, A B and Adeli, H (2001) Resource Scheduling Using Neural Dynamics Model of Adeli and Park. Journal of Construction Engineering and Management, 127(01), 28–34.

Seo, J W and Choi, H H (2008) Risk-Based Safety Impact Assessment Methodology for Underground Construction Projects in Korea. Journal of Construction Engineering and Management, 134(01), 72–81.

Shabani Ardakani, S and Nik-Bakht, M (2021) Functional Evaluation of Change Order and Invoice Management Processes under Different Procurement Strategies: Social Network Analysis Approach. Journal of Construction Engineering and Management, 147(01).

Shahata, K and Zayed, T (2016) Integrated Risk-Assessment Framework for Municipal Infrastructure. Journal of Construction Engineering and Management, 142(01).

Shapira, A (2004) Work Inputs and Related Economic Aspects of Multitier Shoring Towers. Journal of Construction Engineering and Management, 130(01), 134–42.

Shapira, A and Lyachin, B (2009) Identification and Analysis of Factors Affecting Safety on Construction Sites with Tower Cranes. Journal of Construction Engineering and Management, 135(01), 24–33.

Shen, L Y, Wu, G W C and Ng, C S K (2001) Risk Assessment for Construction Joint Ventures in China. Journal of Construction Engineering and Management, 127(01), 76–81.

Shen, X, Lu, M and Chen, W (2011) Tunnel-Boring Machine Positioning during Microtunneling Operations through Integrating Automated Data Collection with Real-Time Computing. Journal of Construction Engineering and Management, 137(01), 72–85.

Sherman, P J (1988) Japanese Construction R&D: Entrée into U.S. Market. Journal of Construction Engineering and Management, 114(01), 133–43.

Shi, J and AbouRizk, S M (1997) Resource-Based Modeling for Construction Simulation. Journal of Construction Engineering and Management, 123(01), 26–33.

Shi, J J (1999) Mathematical Models for Maximizing Aggregate Plant Production. Journal of Construction Engineering and Management, 125(01), 53–60.

Shi, J J, Cheung, S O and Arditi, D (2001) Construction Delay Computation Method. Journal of Construction Engineering and Management, 127(01), 60–65.

Shr, J and Chen, W T (2004) Setting Maximum Incentive for Incentive/Disincentive Contracts for Highway Projects. Journal of Construction Engineering and Management, 130(01), 84–93.

Shrestha, K and Shrestha, P P (2022) Framework to Implement Performance-Based Contracting for Chip-Seal Road Maintenance. Journal of Construction Engineering and Management, 148(01).

Shrestha, P P, O’Connor, J T and Gibson, G E (2012) Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects. Journal of Construction Engineering and Management, 138(01), 1–13.

Signor, R, Love, P E D, Belarmino, A T N and Alfred Olatunji, O (2020) Detection of Collusive Tenders in Infrastructure Projects: Learning from Operation Car Wash. Journal of Construction Engineering and Management, 146(01).

Sinfield, J V and Einstein, H H (1998) Tunnel Construction Costs for Tube Transportation Systems. Journal of Construction Engineering and Management, 124(01), 48–57.

Singh, D and Tiong, R L K (2005) A Fuzzy Decision Framework for Contractor Selection. Journal of Construction Engineering and Management, 131(01), 62–70.

Singh, S (1990) Cost Model for Reinforced Concrete Beam and Slab Structures in Buildings. Journal of Construction Engineering and Management, 116(01), 54–67.

Siu, M F, Lu, M and AbouRizk, S (2016) Resource Supply-Demand Matching Scheduling Approach for Construction Workface Planning. Journal of Construction Engineering and Management, 142(01).

Skibniewski, M and Hendrickson, C (1988) Analysis of Robotic Surface Finishing Work on Construction Site. Journal of Construction Engineering and Management, 114(01), 53–68.

Son, J and Skibniewski, M J (1999) Multiheuristic Approach for Resource Leveling Problem in Construction Engineering: Hybrid Approach. Journal of Construction Engineering and Management, 125(01), 23–31.

Song, X, Peña-Mora, F, Menassa, C C and Arboleda, C A (2012) Insurance as a Risk Management Tool for ADR Implementation in Construction Disputes. Journal of Construction Engineering and Management, 138(01), 14–21.

Songer, A D and Molenaar, K R (1997) Project Characteristics for Successful Public-Sector Design-Build. Journal of Construction Engineering and Management, 123(01), 34–40.

Staab, G E (1989) Construction of Port and Facilities on Horn of Africa—Lessons Learned. Journal of Construction Engineering and Management, 115(01), 53–69.

Stella, C, Ceppi, G and D'Appolonia, E (1990) Temporary Tunnel Support Using Jet‐Grouted Cylinders. Journal of Construction Engineering and Management, 116(01), 35–53.

Stevens, J D and Al‐Dulaijan, S U (1989) Contractor Financing, Public Works in Saudi Arabia. Journal of Construction Engineering and Management, 115(01), 1–14.

Stewart, M G (1993) Modeling Human Performance in Reinforced Concrete Beam Construction. Journal of Construction Engineering and Management, 119(01), 6–22.

Stewart, R F and Schexnayder, C J (1985) Production Estimating for Draglines. Journal of Construction Engineering and Management, 111(01), 101–4.

Stoy, C, Pollalis, S and Schalcher, H (2008) Drivers for Cost Estimating in Early Design: Case Study of Residential Construction. Journal of Construction Engineering and Management, 134(01), 32–39.

Stukharf, G (1987) Construction Management Responsibilities During Design. Journal of Construction Engineering and Management, 113(01), 90–98.

Stukhart, G (1984) Contractual Incentives. Journal of Construction Engineering and Management, 110(01), 34–42.

Su, Y, Lucko, G and Thompson, R C (2018) Application of Voting Theory to the Float Ownership Problem. Journal of Construction Engineering and Management, 144(01).

Suárez, J L, Gosselin, L and Lehoux, N (2023) Optimizing Modularity of Prefabricated Residential Plumbing Systems for Construction in Remote Communities. Journal of Construction Engineering and Management, 149(01).

Subprasom, K and Chen, A (2007) Effects of Regulation on Highway Pricing and Capacity Choice of a Build-Operate-Transfer Scheme. Journal of Construction Engineering and Management, 133(01), 64–71.

Suckarieh, G (1984) Construction Management Control with Microcomputers. Journal of Construction Engineering and Management, 110(01), 72–78.

Sun, C, Mackley, A and Edara, P (2014) Programmatic Examination of Missouri Incentive/Disincentive Contracts for Mitigating Work Zone Traffic Impacts. Journal of Construction Engineering and Management, 140(01).

Swei, O, Gregory, J and Kirchain, R (2017) Probabilistic Approach for Long-Run Price Projections: Case Study of Concrete and Asphalt. Journal of Construction Engineering and Management, 143(01).

Syal, M, Duah, D, Samuel, S, Mazor, M, Mo, Y and Cyr, T (2014) Information Framework for Intelligent Decision Support System for Home Energy Retrofits. Journal of Construction Engineering and Management, 140(01).

Taghaddos, H, AbouRizk, S, Mohamed, Y and Hermann, U (2012) Simulation-Based Auction Protocol for Resource Scheduling Problems. Journal of Construction Engineering and Management, 138(01), 31–42.

Tai, H, Chen, J, Cheng, J, Wei, H, Hsu, S and Liu, H (2021) Determining Worker Training Time for Precast Component Production in Construction: Empirical Study in Taiwan. Journal of Construction Engineering and Management, 147(01).

Tang, W, Cui, Q, Zhang, F and Chen, Y (2019) Urban Rail-Transit Project Investment Benefits Based on Compound Real Options and Trapezoid Fuzzy Numbers. Journal of Construction Engineering and Management, 145(01).

Tanwani, R and Iseley, D T (1994) Tracking and Steering Systems in Trenchless Construction. Journal of Construction Engineering and Management, 120(01), 65–76.

Tatum, C B (2005) Building Better: Technical Support for Construction. Journal of Construction Engineering and Management, 131(01), 23–32.

Tatum, C B (1983) Heavy Rigging for Nuclear Projects. Journal of Construction Engineering and Management, 109(01), 48–60.

Tatum, C B (1983) Issues in Professional Construction Management. Journal of Construction Engineering and Management, 109(01), 112–9.

Tatum, C B and Funke, A T (1988) Partially Automated Grading: Construction Process Innovation. Journal of Construction Engineering and Management, 114(01), 19–35.

Tavakoli, A (1985) Productivity Analysis of Construction Operations. Journal of Construction Engineering and Management, 111(01), 31–39.

Tawalare, A, Laishram, B and Thottathil, F (2020) Relational Partnership in Public Construction Organizations: Front-Line Employee Perspective. Journal of Construction Engineering and Management, 146(01).

Techera, U, Hallowell, M and Littlejohn, R (2019) Worker Fatigue in Electrical-Transmission and Distribution-Line Construction. Journal of Construction Engineering and Management, 145(01).

Teicholz, P and Fischer, M (1994) Strategy for Computer Integrated Construction Technology. Journal of Construction Engineering and Management, 120(01), 117–31.

Tenah, K A (1986) Construction Personnel Role and Information Needs. Journal of Construction Engineering and Management, 112(01), 33–48.

Tenah, K A (1984) Management Information Organization and Routing. Journal of Construction Engineering and Management, 110(01), 101–18.

Tetik, M, Peltokorpi, A, Seppänen, O, Leväniemi, M and Holmström, J (2021) Kitting Logistics Solution for Improving On-Site Work Performance in Construction Projects. Journal of Construction Engineering and Management, 147(01).

Thabet, W Y and Beliveau, Y J (1994) Modeling Work Space to Schedule Repetitive Floors in Multistory Buildings. Journal of Construction Engineering and Management, 120(01), 96–116.

Thomas, H R (2002) 2000 Peurifoy Lecture: Construction Practices in Developing Countries. Journal of Construction Engineering and Management, 128(01), 1–7.

Thomas, H R (1992) Effects of Scheduled Overtime on Labor Productivity. Journal of Construction Engineering and Management, 118(01), 60–76.

Thomas, H R and Sakarcan, A S (1994) Forecasting Labor Productivity Using Factor Model. Journal of Construction Engineering and Management, 120(01), 228–39.

Thomas, H R, Riley, D R and Sanvido, V E (1999) Loss of Labor Productivity due to Delivery Methods and Weather. Journal of Construction Engineering and Management, 125(01), 39–46.

Thomas, H R, Smith, G R and Cummings, D J (1995) Have I Reached Substantial Completion?. Journal of Construction Engineering and Management, 121(01), 121–9.

Thomas, H R, Smith, G R and Wirsching, S M (1995) Understanding Defective Specifications. Journal of Construction Engineering and Management, 121(01), 55–65.

Thomas, H R, Smith, G R and Wright, E D (1991) Legal Aspects of Oral Change Orders. Journal of Construction Engineering and Management, 117(01), 148–62.

Thomas, S R, Tucker, R L and Kelly, W R (1998) Critical Communications Variables. Journal of Construction Engineering and Management, 124(01), 58–66.

Tilford, K R, Jaselskis, E J and Smith, G R (2000) Impact of Environmental Contamination on Construction Projects. Journal of Construction Engineering and Management, 126(01), 45–51.

Tiong, R L K and Alum, J (1997) Final Negotiation in Competitive BOT Tender. Journal of Construction Engineering and Management, 123(01), 6–10.

Torbica, & M and Stroh, R C (2001) Customer Satisfaction in Home Building. Journal of Construction Engineering and Management, 127(01), 82–86.

Touran, A (1993) Probabilistic Cost Estimating with Subjective Correlations. Journal of Construction Engineering and Management, 119(01), 58–71.

Touran, A and Ladick, D R (1989) Application of Robotics in Bridge Deck Fabrication. Journal of Construction Engineering and Management, 115(01), 35–52.

Touran, A, Sheahan, T C and Ozcan, E (1997) Rational Equipment Selection Method Based on Soil Conditions. Journal of Construction Engineering and Management, 123(01), 85–88.

Treloar, G J, Love, P E D and Crawford, R H (2004) Hybrid Life-Cycle Inventory for Road Construction and Use. Journal of Construction Engineering and Management, 130(01), 43–49.

Tsolas, I E (2013) Modeling Profitability and Stock Market Performance of Listed Construction Firms on the Athens Exchange: Two-Stage DEA Approach. Journal of Construction Engineering and Management, 139(01), 111–9.

Turner, J P (1992) Constructability for Drilled Shafts. Journal of Construction Engineering and Management, 118(01), 77–93.

Umer, W, Li, H, Szeto, G P Y and Wong, A Y L (2017) Identification of Biomechanical Risk Factors for the Development of Lower-Back Disorders during Manual Rebar Tying. Journal of Construction Engineering and Management, 143(01).

Valdes-Vasquez, R and Klotz, L E (2013) Social Sustainability Considerations during Planning and Design: Framework of Processes for Construction Projects. Journal of Construction Engineering and Management, 139(01), 80–89.

Vanhoucke, M (2006) Work Continuity Constraints in Project Scheduling. Journal of Construction Engineering and Management, 132(01), 14–25.

Varghese, K and O'Connor, J T (1995) Routing Large Vehicles on Industrial Construction Sites. Journal of Construction Engineering and Management, 121(01), 1–12.

Vithanage, S C, Sing, M C P, Davis, P and Newaz, M T (2022) Assessing the Off-Site Manufacturing Workers’ Influence on Safety Performance: A Bayesian Network Approach. Journal of Construction Engineering and Management, 148(01).

Vorster, M C and Sears, G A (1987) Model for Retiring, Replacing, or Reassigning construction equipment. Journal of Construction Engineering and Management, 113(01), 125–37.

Wang, J, Zhang, S, Fenn, P, Luo, X, Liu, Y and Zhao, L (2023) Adopting BIM to Facilitate Dispute Management in the Construction Industry: A Conceptual Framework Development. Journal of Construction Engineering and Management, 149(01).

Wang, P, Wang, K, Huang, Y, Zhu, J, Fenn, P and Zhang, Y (2023) Payment Issues in China’s Construction Industry: Nature, Causes, and a Predictive Model. Journal of Construction Engineering and Management, 149(01).

Wang, T and Feng, J (2023) Optimal Review Strategy for Concurrent Execution of Design–Construction Tasks in DB Mode. Journal of Construction Engineering and Management, 149(01).

Wang, W (2002) SIM-UTILITY: Model for Project Ceiling Price Determination. Journal of Construction Engineering and Management, 128(01), 76–84.

Warszawski, A and Navon, R (1998) Implementation of Robotics in Building: Current Status and Future Prospects. Journal of Construction Engineering and Management, 124(01), 31–41.

Warszawski, A and Rosenfeld, Y (1994) Robot for Interior‐Finishing Works in Building: Feasibility Analysis. Journal of Construction Engineering and Management, 120(01), 132–51.

Wharry, M B and Ashley, D B (1987) Countertrade Financing: Historical Example. Journal of Construction Engineering and Management, 113(01), 117–24.

Willenbrock, J H, Thomas, H R and Francis, P J (1987) Factors Affecting Outage Construction Efficiency. Journal of Construction Engineering and Management, 113(01), 99–116.

Wilson, J M and Koehn, E & (2000) Safety Management: Problems Encountered and Recommended Solutions. Journal of Construction Engineering and Management, 126(01), 77–79.

Wu, H, Qian, Q K, Straub, A and Visscher, H (2021) Stakeholder Perceptions of Transaction Costs in Prefabricated Housing Projects in China. Journal of Construction Engineering and Management, 147(01).

Wu, J, Sadraddin, H L, Ren, R, Zhang, J and Shao, X (2021) Invariant Signatures of Architecture, Engineering, and Construction Objects to Support BIM Interoperability between Architectural Design and Structural Analysis. Journal of Construction Engineering and Management, 147(01).

Wu, R W and Hadipriono, F C (1994) Fuzzy Modus Ponens Deduction Technique for Construction Scheduling. Journal of Construction Engineering and Management, 120(01), 162–79.

Xue, X, Shen, Q, Wang, Y and Lu, J (2008) Measuring the Productivity of the Construction Industry in China by Using DEA-Based Malmquist Productivity Indices. Journal of Construction Engineering and Management, 134(01), 64–71.

Yang, H, Chan, A P C, Yeung, J F Y and Li, Q (2012) Concentration Effect on Construction Firms: Tests of Resource Partitioning Theory in Jiangsu Province (China) from 1989 to 2007. Journal of Construction Engineering and Management, 138(01), 144–53.

Yang, I, Lin, Y and Lee, H (2014) Use of Support Vector Regression to Improve Computational Efficiency of Stochastic Time-Cost Trade-Off. Journal of Construction Engineering and Management, 140(01).

Yang, M, Chen, S and Chen, S (2006) Innovative Central Opening Strut System for Foundation Excavation. Journal of Construction Engineering and Management, 132(01), 58–66.

Yang, W, Zhang, F, Wang, H, Wu, J, Nie, Z and Li, L (2023) Synchronous Control Theory and First Test of Time-Varying Upper Operation and Chassis Attitude Maintenance for Truck Cranes. Journal of Construction Engineering and Management, 149(01).

Yao, Y, Ruan, Y, Chen, J, Geng, Y, Zhang, X, Liu, B, Zong, X and Yu, G (2018) Research on a Real-Time Monitoring Platform for Compaction of High Embankment in Airport Engineering. Journal of Construction Engineering and Management, 144(01).

Yates, J K and Lockley, E E (2002) Documenting and Analyzing Construction Failures. Journal of Construction Engineering and Management, 128(01), 8–17.

Ye, M, Lu, W and Xue, F (2022) Impact of Institutional Distance on Environmental and Social Practices in Host Countries: Evidence from International Construction Companies. Journal of Construction Engineering and Management, 148(01).

Ye, X, Shi, S, Chong, H, Fu, X, Liu, L and He, Q (2018) Empirical Analysis of Firms’ Willingness to Participate in Infrastructure PPP Projects. Journal of Construction Engineering and Management, 144(01).

Yeh, Y, Hsu, D and Kuo, Y (1991) Expert System for Diagnosing Damage of Prestressed Concrete Pile. Journal of Construction Engineering and Management, 117(01), 13–26.

Yevu, S K, Yu, A T W, Nani, G, Darko, A and Tetteh, M O (2022) Electronic Procurement Systems Adoption in Construction Procurement: A Global Survey on the Barriers and Strategies from the Developed and Developing Economies. Journal of Construction Engineering and Management, 148(01).

Yiu, C Y, Ho, H K, Lo, S M and Hu, B Q (2005) Performance Evaluation for Cost Estimators by Reliability Interval Method. Journal of Construction Engineering and Management, 131(01), 108–16.

Younes, B, Bouferguène, A, Al-Hussein, M and Yu, H (2015) Overdue Invoice Management: Markov Chain Approach. Journal of Construction Engineering and Management, 141(01).

Yu, W and Wang, K (2012) Best Value or Lowest Bid? A Quantitative Perspective. Journal of Construction Engineering and Management, 138(01), 128–34.

Yu, X and Ergan, S (2021) Key Variables in Determining Energy Shaving Capacity of Buildings during Demand Response Events. Journal of Construction Engineering and Management, 147(01).

Yu, X, Mehmood, K, Paulsen, N, Ma, Z and Kwan, H K (2021) Why Safety Knowledge Cannot be Transferred Directly to Expected Safety Outcomes in Construction Workers: The Moderating Effect of Physiological Perceived Control and Mediating Effect of Safety Behavior. Journal of Construction Engineering and Management, 147(01).

Yuan, H and Yang, Y (2020) BIM Adoption under Government Subsidy: Technology Diffusion Perspective. Journal of Construction Engineering and Management, 146(01).

Zeng, N, Liu, Y and König, M (2023) 4D BIM-Enabled Look-Ahead Scheduling for Early Warning of Off-Site Supply Chain Disruptions. Journal of Construction Engineering and Management, 149(01).

Zerjav, V, Hartmann, T and Javernick-Will, A (2012) Internal Governance of Design and Engineering: The Case of the Multinational Firm. Journal of Construction Engineering and Management, 138(01), 135–43.

Zeynalian, M, Trigunarsyah, B and Ronagh, H R (2013) Modification of Advanced Programmatic Risk Analysis and Management Model for the Whole Project Life Cycle’s Risks. Journal of Construction Engineering and Management, 139(01), 51–59.

Zhang, M, Cao, T and Zhao, X (2019) Using Smartphones to Detect and Identify Construction Workers’ Near-Miss Falls Based on ANN. Journal of Construction Engineering and Management, 145(01).

Zhang, S, Bogus, S M, Lippitt, C D and Migliaccio, G C (2017) Estimating Location-Adjustment Factors for Conceptual Cost Estimating Based on Nighttime Light Satellite Imagery. Journal of Construction Engineering and Management, 143(01).

Zhang, S, Du, C, Sa, W, Wang, C and Wang, G (2014) Bayesian-Based Hybrid Simulation Approach to Project Completion Forecasting for Underground Construction. Journal of Construction Engineering and Management, 140(01).

Zhang, S, Li, J, Li, Y and Zhang, X (2021) Revenue Risk Allocation Mechanism in Public-Private Partnership Projects: Swing Option Approach. Journal of Construction Engineering and Management, 147(01).

Zhang, S, Liu, X, Gao, Y and Ma, P (2019) Effect of Level of Owner-Provided Design on Contractor’s Design Quality in DB/EPC Projects. Journal of Construction Engineering and Management, 145(01).

Zhang, X (2005) Critical Success Factors for Public–Private Partnerships in Infrastructure Development. Journal of Construction Engineering and Management, 131(01), 3–14.

Zhang, X (2005) Paving the Way for Public–Private Partnerships in Infrastructure Development. Journal of Construction Engineering and Management, 131(01), 71–80.

Zhang, X, Liu, T, Rahman, A and Zhou, L (2023) Blockchain Applications for Construction Contract Management: A Systematic Literature Review. Journal of Construction Engineering and Management, 149(01).

Zhang, Y, Luo, H, Skitmore, M, Li, Q and Zhong, B (2019) Optimal Camera Placement for Monitoring Safety in Metro Station Construction Work. Journal of Construction Engineering and Management, 145(01).

Zhao, D, McCoy, A P, Kleiner, B M, Du, J and Smith-Jackson, T L (2016) Decision-Making Chains in Electrical Safety for Construction Workers. Journal of Construction Engineering and Management, 142(01).

Zhao, D, McCoy, A P, Kleiner, B M, Smith-Jackson, T L and Liu, G (2016) Sociotechnical Systems of Fatal Electrical Injuries in the Construction Industry. Journal of Construction Engineering and Management, 142(01).

Zheng, D X M, Ng, S T and Kumaraswamy, M M (2005) Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization. Journal of Construction Engineering and Management, 131(01), 81–91.

Zhou, Q, Fang, D and Mohamed, S (2011) Safety Climate Improvement: Case Study in a Chinese Construction Company. Journal of Construction Engineering and Management, 137(01), 86–95.

Zhu, B (1999) Effect of Cooling by Water Flowing in Nonmetal Pipes Embedded in Mass Concrete. Journal of Construction Engineering and Management, 125(01), 61–68.