Abstracts – Search Results

Search or browse again, or refine search.

Click on the titles below to expand the information about each abstract.
Viewing 12 results ...

Agha, R H and Kamara, J M (2017) Adaptations in traditional courtyard houses in Baghdad, Iraq. International Journal of Building Pathology and Adaptation, 35(04), 348–63.

Al-Ghassani, A M, Kamara, J M, Anumba, C J and Carrillo, P M (2004) An innovative approach to identifying knowledge management problems. Engineering, Construction and Architectural Management, 11(05), 349–57.

Al-Ghassani, A M, Kamara, J M, Anumba, C J and Carrillo, P M (2006) Prototype System for Knowledge Problem Definition. Journal of Construction Engineering and Management, 132(05), 516–24.

  • Type: Journal Article
  • Keywords: Information technology (IT); Information management; Knowledge-based systems; Construction industry;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2006)132:5(516)
  • Abstract:
    Attitudes to knowledge management (KM) have changed considerably as organizations are now realizing its benefits. Implementation, however, has been facing serious difficulties attributed either to not being able to anticipate the barriers when planning KM strategies or to using inappropriate methods and tools for implementation. These difficulties are more critical in construction due to the fragmented nature of the industry. This paper suggests that proper definition of a KM problem at the early stages of developing the KM initiatives will result in better control over the KM barriers. A methodology for identifying KM problems within a business context is then introduced. The methodology is encapsulated into a prototype software system, which facilitates its deployment in organizations and provides online help facilities. The methodology, development, operation, and evaluation of the prototype are described. The paper concludes that the prototype offers considerable potential for delivering a clarified KM problem and a distilled set of issues for an organization to address. This represents a significant first step in any KM initiative.

Chen, Y and Kamara, J M (2005) The use of mobile computing in construction information management. In: Khosrowshahi, F (Ed.), Proceedings 21st Annual ARCOM Conference, 7-9 September 2005, London, UK. Association of Researchers in Construction Management, Vol. 1, 581–90.

Chen, Y and Kamara, J M (2008) Using mobile computing for construction site information management. Engineering, Construction and Architectural Management, 15(01), 7–20.

Hegazy, T and Kamarah, E (2008) Efficient Repetitive Scheduling for High-Rise Construction. Journal of Construction Engineering and Management, 134(04), 253–64.

Heidrich, O, Kamara, J, Maltese, S, Re Cecconi, F and Dejaco, M C (2017) A critical review of the developments in building adaptability. International Journal of Building Pathology and Adaptation, 35(04), 284–303.

Kamara, J M (2012) Integration in the project development process of a Private Finance Initiative (PFI) project. Architectural Engineering and Design Management, 8(04), 228-45.

Kamara, J M (2017) Maintaining focus on clients’ requirements using the DQI tool: Towards a requirements-oriented project process. Built Environment Project and Asset Management, 7(03), 271-83.

Kamara, J M, Anumba, C J and Evbuomwan, N F O (2000) Establishing and processing client requirements-a key aspect of concurrent engineering in construction. Engineering, Construction and Architectural Management, 7(01), 15–28.

Kamara, J M, Anumba, C J and Hobbs, B (1999) From briefing to client requirements processing. In: Hughes, W (Ed.), Proceedings 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK. Association of Researchers in Construction Management, Vol. 1, 317–26.

Kamara, J M, Augenbroe, G, Anumba, C J and Carrillo, P M (2002) Knowledge management in the architecture, engineering and construction industry. Construction Innovation, 2(01), 53–67.