Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 6 results ...

Feldman, G, Shah, H, Chapman, C, Pärn, E A and Edwards, D J (2017) A systematic approach for enterprise systems upgrade decision-making: Outlining the decision processes. Journal of Engineering, Design and Technology, 15(06), 778-802.

Kwofie, T E, Adinyira, E and Fugar, F (2017) Theoretical and practical implications for engendering project team communication effectiveness in mass housing project delivery in Ghana. Journal of Engineering, Design and Technology, 15(06), 826-44.

Nani, G, Mensah, I and Adjei-Kumi, T (2017) Duration estimation model for bridge construction projects in Ghana. Journal of Engineering, Design and Technology, 15(06), 754-77.

Oke, A E, Ibironke, O T and Bayegun, O A (2017) Appraisal of reward packages in construction firms: A case of quantity surveying firms in Nigeria. Journal of Engineering, Design and Technology, 15(06), 722-37.

Riaz, Z, Parn, E A, Edwards, D J, Arslan, M, Shen, C and Pena-Mora, F (2017) BIM and sensor-based data management system for construction safety monitoring. Journal of Engineering, Design and Technology, 15(06), 738-53.

  • Type: Journal Article
  • Keywords: data management; building information modelling; digital built environment; health and safety management; sensor data
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/JEDT-03-2017-0017
  • Abstract:
    Purpose This research aims to investigate the integration of real-time monitoring of thermal conditions within confined work environments through wireless sensor network (WSN) technology when integrated with building information modelling (BIM). A prototype system entitled confined space monitoring system (CoSMoS), which provides an opportunity to incorporate sensor data for improved visualization through new add-ins to BIM software, was then developed. Design/methodology/approach An empirical study was undertaken to compare and contrast between the performances (over a time series) of various database models to find a back-end database storage configuration that best suits the needs of CoSMoS. Findings Fusing BIM data with information streams derived from wireless sensors challenges traditional approaches to data management. These challenges encountered in the prototype system are reported upon and include issues such as hardware/software selection and optimization. Consequently, various database models are explored and tested to find a database storage that best suits the specific needs of this BIM-wireless sensor technology integration. Originality value This work represents the first tranche of research that seeks to deliver a fully integrated and advanced digital built environment solution for automating the management of health and safety issues on construction sites.

Yap, J B H and Lock, A (2017) Analysing the benefits, techniques, tools and challenges of knowledge management practices in the Malaysian construction SMEs. Journal of Engineering, Design and Technology, 15(06), 803-25.