ARCOM Conference Paper Abstracts Database:
Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 83 results ...
Alani, A M, Petersen, A K, Chapman, K G and Khosrowshahi, F (2004) A proposed quantitative model for building repair and maintenance -theory, model development and application. Journal of Construction Research, 5(02), 193–210.
Alkoc, E and Erbatur, F (1998) Simulation in concreting operations: a comparison of models and resource combinations. Engineering, Construction and Architectural Management, 5(02), 159–73.
Allan, P and Bryant, M (2014) The attributes of resilience: A tool in the evaluation and design of earthquake-prone cities. International Journal of Disaster Resilience in the Built Environment, 5(02), 109-29.
Altomonte, S (2005) CH2 - Lighting and physiology. Construction Economics and Building, 5(02), 40-46.
Assaf, S A (1987) Feasibility assessment of large-scale housing development in Saudi Arabia: a case study. Construction Management and Economics, 5(02), 157-68.
Aye, L and Fuller, R (2005) An evaluation of a proposed ventilation system for Melbourne's CH2 building. Construction Economics and Building, 5(02), 47-57.
Aye, L and Fuller, R (2005) The proposed heating and cooling system in the CH2 building and its impact on occupant productivity. Construction Economics and Building, 5(02), 32-39.
Back, W E and Sanders, S R (1998) Industry expectations for engineering graduates. Engineering, Construction and Architectural Management, 5(02), 137–43.
Badger, W, Sullivan, K, Wiezel, A and Bopp, P H (2009) Profiling the leadership of project managers. International Journal of Construction Education and Research, 5(02), 121-46.
Baker, F (2013) Housing and planning regulation – England and Ireland. International Journal of Law in the Built Environment, 5(02), 118-36.
Baroudi, B and Rapp, R R (2014) Stakeholder management in disaster restoration projects. International Journal of Disaster Resilience in the Built Environment, 5(02), 182-93.
Bichard, E and Thurairajah, N (2014) Trialling behaviour change strategies to motivate interest in property level flood protection. International Journal of Disaster Resilience in the Built Environment, 5(02), 130-43.
Blyth, K, Lewis, J and Kaka, A (2004) Predicting project and activity duration for buildings in the UK. Journal of Construction Research, 5(02), 329–47.
Brownlie, S M and Harris, F C (1987) A review of finance for large-scale construction. Construction Management and Economics, 5(02), 115-21.
Chan, A P C, Wong, F K W and Yang, Y (2016) From innovation to application of personal cooling vest. Smart and Sustainable Built Environment, 5(02), 111-24.
Chantawit, D, Hadikusumo, B H W, Charoenngam, C and Rowlinson, S (2005) 4DCAD-Safety: visualizing project scheduling and safety planning. Construction Innovation, 5(02), 99–114.
Charlesworth, E and Fien, J (2014) Breaching the urban contract: Lessons from post disaster reconstruction from research on five divided cities. International Journal of Disaster Resilience in the Built Environment, 5(02), 194-201.
Cheng, E W L, Li, H and Yu, L (2005) The analytic network process (ANP) approach to location selection: a shopping mall illustration. Construction Innovation, 5(02), 83–97.
Cheung, C (2005) CH2 energy harvesting systems: economic use and efficiency. Construction Economics and Building, 5(02), 20-31.
City of Melbourne (2005) Preamble to special issue. Construction Economics and Building, 5(02), 1-7.
Collins, A and Baccarini, D (2004) Project success -a survey. Journal of Construction Research, 5(02), 211–31.
D'Incognito, M, Costantino, N and Migliaccio, G C (2015) Actors and barriers to the adoption of LCC and LCA techniques in the built environment. Built Environment Project and Asset Management, 5(02), 202-16.
Duncan, K, Philips, P and Prus, M (2009) The effects of prevailing wage regulations on construction efficiency in British Columbia. International Journal of Construction Education and Research, 5(02), 63-78.
Edwards, D J, Yang, J, Wright, B C and Love, P E D (2007) Establishing the link between plant operator performance and personal motivation. Journal of Engineering, Design and Technology, 5(02), 173–87.
Ezulike, E L and Hoare, D J (1998) The need for education in alternative dispute resolution (ADR) in the construction industry. Engineering, Construction and Architectural Management, 5(02), 144–9.
Faniran, O O and Caban, G (1998) Minimizing waste on construction project sites. Engineering, Construction and Architectural Management, 5(02), 182–8.
Fortune, C and Hinks, J (1999) Quality issues in building project price forecasting: factors affecting model selection. Journal of Construction Procurement, 5(02), 129–40.
Green, S D (1999) Partnering: the propaganda of corporatism?. Journal of Construction Procurement, 5(02), 177–86.
Han, S H and Diekmann, J (2004) Judgment-based cross-impact method for predicting cost variance for highly uncertain projects. Journal of Construction Research, 5(02), 171–92.
Hansen, K L, MGann, D and Groák, S (1998) Information technology decision support and business process change in the USA. Engineering, Construction and Architectural Management, 5(02), 115–26.
Haupt, T C and Smallwood, J (2004) HIV and AIDS in SA construction: attitudes and perceptions of workers. Journal of Construction Research, 5(02), 311–27.
Hearne, R (2013) Realising the “right to the city”: Developing a human rights based framework for regeneration of areas of urban disadvantage. International Journal of Law in the Built Environment, 5(02), 172-87.
Hes, D, Morrison, A and Bates, M (2005) Assessment and selection of materials for Melbourne City Council House 2. Construction Economics and Building, 5(02), 8-19.
Hindle, R D and Rwelamila, P D (1998) Resistance to change: architectural education in a turbulent environment. Engineering, Construction and Architectural Management, 5(02), 150–8.
Jukic, D and Carmichael, D G (2016) Emission and cost effects of training for construction equipment operators: A field study. Smart and Sustainable Built Environment, 5(02), 96-110.
Junnonen, J M (1998) Strategy formation in construction firms. Engineering, Construction and Architectural Management, 5(02), 107–14.
Kaka, A P and Boussabaine, A H (1999) Updating techniques for cumulative cost forecasting on construction projects. Journal of Construction Procurement, 5(02), 141–58.
Kayan, B A, Forster, A M and Banfill, P F G (2016) Green Maintenance for historic masonry buildings: an option appraisal approach. Smart and Sustainable Built Environment, 5(02), 143-64.
Khatib, J M, Chileshe, N and Sloan, S (2007) Antecedents and benefits of 3D and 4D modelling for construction planners. Journal of Engineering, Design and Technology, 5(02), 159–72.
Kramer, S W and Dillard, C (2009) Why do American construction professionals choose to work abroad on US embassy projects?. International Journal of Construction Education and Research, 5(02), 95-107.
Kumaraswamy, M M and Chan, D W M (1999) Factors facilitating faster construction. Journal of Construction Procurement, 5(02), 88–98.
Lahdenperä, P (1999) Restructuring the building industry for improved performance. Journal of Construction Procurement, 5(02), 118–28.
Laitos, J G and Abel, T M (2013) Sites suitable for mixed use development in Britain and America. International Journal of Law in the Built Environment, 5(02), 137-55.
Lam, P T I, Wong, F K W and Wong, F W H (2007) Building features and site-specific factors affecting buildability in Hong Kong. Journal of Engineering, Design and Technology, 5(02), 129–47.
Lansley, P R (1987) Corporate strategy and survival in the UK construction industry. Construction Management and Economics, 5(02), 141-55.
Lenard, D (1999) Future challenges in construction management: creating a symbiotic learning environment. Journal of Construction Procurement, 5(02), 197–210.
Loosemore, M and Hughes, K (1998) Emergency systems in construction contracts. Engineering, Construction and Architectural Management, 5(02), 189–98.
Lowe, J G (1987) The measurement of productivity in the construction industry. Construction Management and Economics, 5(02), 101-13.
Luiten, G T and Fischer, M A (1998) Opportunities for computer-aided design for construction. Engineering, Construction and Architectural Management, 5(02), 127–36.
Lundgren, M S (2016) Energy and architectural consequences of Swedish building code. Smart and Sustainable Built Environment, 5(02), 125-42.
Machika, P (2007) Access to success: The value of bridging programmes in engineering at the University of Johannesburg. Journal of Engineering, Design and Technology, 5(02), 120–8.
MacKee, J, Askland, H H and Askew, L (2014) Recovering cultural built heritage after natural disasters: A resilience perspective. International Journal of Disaster Resilience in the Built Environment, 5(02), 202-12.
Manthe, M and Smallwood, J (2007) The appropriateness of built environment tertiary education: Perspectives of academics and postgraduate students. Journal of Engineering, Design and Technology, 5(02), 102–19.
Moore, J E, Kuprenas, J, Lee, J-J, Gordon, P, Richardson, H and Pan, Q (2004) Cost analysis methodology for advanced treatment of stormwater: the Los Angeles case. Journal of Construction Research, 5(02), 149–70.
Muya, M, Price, A D F, Thorpe, A and Edum-Fotwe, F (1999) Application of analytic hierarchy process to the evaluation of logistics factors and their contribution to improvements in construction materials supply. Journal of Construction Procurement, 5(02), 99–117.
Newcombe, R (1999) Procurement as a learning process. Journal of Construction Procurement, 5(02), 211–20.
O'Mahony, L F (2013) The meaning of home: from theory to practice. International Journal of Law in the Built Environment, 5(02), 156-71.
Ofori, G, Dulaimi, M F and Ling, F Y Y (2004) Improving performance of construction industry in Singapore: motivators, enablers and lessons for developing countries. Journal of Construction Research, 5(02), 267–89.
Ogunlana, S O (1999) Procurement lessons from Solomon's temple project. Journal of Construction Procurement, 5(02), 187–96.
Opoku, A, Ahmed, V and Cruickshank, H (2015) Leadership style of sustainability professionals in the UK construction industry. Built Environment Project and Asset Management, 5(02), 184-201.
Opoku, A, Cruickshank, H and Ahmed, V (2015) Organizational leadership role in the delivery of sustainable construction projects in UK. Built Environment Project and Asset Management, 5(02), 154-69.
Panthi, K, Ahmed, S M and Ogunlana, S O (2009) Contingency estimation for construction projects through risk analysis. International Journal of Construction Education and Research, 5(02), 79-94.
Peltola, T and Mansikkamaki, P (2007) Formable multilayer PCB structure: design and technology demonstrator. Journal of Engineering, Design and Technology, 5(02), 148–58.
Proverbs, D G, Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of concrete placing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(02), 174–81.
Reposa, J H (2009) Comparison of USGBC LEED for homes and the NAHB national green building program. International Journal of Construction Education and Research, 5(02), 108-20.
Roberts, J (1987) The business round-table construction industry cost effectiveness task force. Construction Management and Economics, 5(02), 95-100.
Sajjadian, S M (2016) Dynamic modelling of solar storage system: a case study of leisure centre. Smart and Sustainable Built Environment, 5(02), 165-75.
Scott, D (1987) Multi-objective economic evaluation of minor roading projects. Construction Management and Economics, 5(02), 169-81.
Sebastian, R (2004) Critical appraisal of design management in architecture. Journal of Construction Research, 5(02), 255–66.
Senaratne, S and Hewamanage, P R (2015) The role of team leadership in achieving leed certification in a green building project. Built Environment Project and Asset Management, 5(02), 170-83.
Sezer, A A (2015) Contractor use of productivity and sustainability indicators for building refurbishment. Built Environment Project and Asset Management, 5(02), 141-53.
Soetanto, R and Proverbs, D G (2004) Intelligent models for predicting levels of client satisfaction. Journal of Construction Research, 5(02), 233–53.
Somerville, P (2013) Property and power in the English countryside: the case of housing. International Journal of Law in the Built Environment, 5(02), 100-17.
Stewart, P, Robinson, J and Low, S (2005) The business case for sustainable design - the City of Melbourne CH2 project. Construction Economics and Building, 5(02), 58-70.
Syed, A and Routray, J K (2014) Vulnerability assessment of earthquake prone communities in Baluchistan. International Journal of Disaster Resilience in the Built Environment, 5(02), 144-62.
Tam, C M and Tong, T K L (2005) Multiple GMDH models for estimating resource requirements. Construction Innovation, 5(02), 115–31.
Titus, S and Bröchner, J (2005) Managing information flow in construction supply chains. Construction Innovation, 5(02), 71–82.
Tucker, S, Gamage, A and Wijeyesekera, C (2014) Some design aspects of sustainable post-disaster housing. International Journal of Disaster Resilience in the Built Environment, 5(02), 163-81.
Uher, T E (1999) Partnering performance in Australia. Journal of Construction Procurement, 5(02), 163–76.
Vakhitova, T V (2015) Rethinking conservation: Managing cultural heritage as an inhabited cultural landscape. Built Environment Project and Asset Management, 5(02), 217-28.
van den Bosch, C C K (2016) Tree agency and urban forest governance. Smart and Sustainable Built Environment, 5(02), 176-88.
Walker, A and Hughes, W (1987) A project managed by a multi-disciplinary practice: a systems-based case study. Construction Management and Economics, 5(02), 123-40.
Wood, B and Kenley, R (2004) The effectiveness of the bills of quantities in Australia. Journal of Construction Research, 5(02), 291–309.