ARCOM Conference Paper Abstracts Database:
Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 73 results ...
Andrew, A and Bryan, C (2011) Scottish construction lawyers and mediation: an investigation into attitudes and experiences. International Journal of Law in the Built Environment, 3(02), 159–81.
Arditi, D, Akan, G T and Gurdamar, S (1985) Reasons for delays in public projects in Turkey. Construction Management and Economics, 3(02), 171-81.
Arif, A A and Karam, A H (2005) Architectural practices and IT: local vs international. Journal of Engineering, Design and Technology, 3(02), 155–63.
Asao, K, Miyamoto, T, Kato, H and Diaz, C E D (2013) Comparison of revenue guarantee programs in build-operation-transfer projects. Built Environment Project and Asset Management, 3(02), 214-27.
Barot, B (2002) Growth and business cycles for the Swedish economy. Journal of Construction Research, 3(02), 217–53.
Bencze, O C, Dasmohapatra, S and Tilotta, D C (2012) A concept for a performance-based rating system for home resilience: ReScU. International Journal of Disaster Resilience in the Built Environment, 3(02), 148-65.
Brahme, R and Mahdavi, A (2003) Complex early design inquiries via generative design agents. Construction Innovation, 3(02), 81–95.
Buckman, A H, Mayfield, M and Beck, S B M (2014) What is a Smart Building?. Smart and Sustainable Built Environment, 3(02), 92-109.
Chan, E H W and Chan, A T S (2002) Development of professional system in the construction industry of China. Journal of Construction Research, 3(02), 271–84.
Chileshe, N and Haupt, T C (2005) Modelling critical success factors of construction project management (CPM). Journal of Engineering, Design and Technology, 3(02), 140–54.
Crook, D (1997) Empirical enquiry or metaphysics? Re-specifying the methodological debate. Journal of Construction Procurement, 3(02), 56–71.
Cusack, M M (1985) The use of integer linear programming for modelling project control information. Construction Management and Economics, 3(02), 91-104.
de Casas Castro Marins, K R (2014) A method for energy efficiency assessment during urban energy planning. Smart and Sustainable Built Environment, 3(02), 132-52.
Devapriya, K A K and Pretorius, F (2002) The economic implication of project finance arrangements for BOO/BOT power projects in Asia. Journal of Construction Research, 3(02), 285–309.
Djalante, R and Thomalla, F (2012) Disaster risk reduction and climate change adaptation in Indonesia: Institutional challenges and opportunities for integration. International Journal of Disaster Resilience in the Built Environment, 3(02), 166-80.
Edwards, D J, Holt, G D and Harris, F C (1998) Financial management of construction plant: conceptualising cost prediction. Journal of Financial Management of Property and Construction, 3(02), 59–74.
El-Gafy, M A (2007) Construction time-cost trade-off analysis using ant system. International Journal of Construction Education and Research, 3(02), 99-108.
Emmitt, S (2005) Integrating teaching and research in an architectural technology undergraduate model. Journal of Engineering, Design and Technology, 3(02), 164–79.
English, J (2002) The communication problems experienced by workforce on site, and their possible solutions. Journal of Construction Research, 3(02), 311–21.
Flanagan, R and Norman, G (1985) Sealed bid auctions: an application to the building industry. Construction Management and Economics, 3(02), 145-61.
Gray, C and Little, J (1985) A systematic approach to the selection of an appropriate crane for a construction site. Construction Management and Economics, 3(02), 121-44.
Hague, D J (1985) Incentives and motivation in the construction industry: a critique. Construction Management and Economics, 3(02), 163-70.
Holt, G D (1997) Construction research questionnaires and attitude measurement: relative index or mean?. Journal of Construction Procurement, 3(02), 88–96.
Isikdag, U, Underwood, J, Aouad, G and Trodd, N (2007) Investigating the role of building information models as a part of an integrated data layer: a fire response management case. Architectural Engineering and Design Management, 3(02), 124–42.
Jensen, W, Fischer, B and Wentz, T (2007) Post-design LEED certification for commercial and residential structures. International Journal of Construction Education and Research, 3(02), 109-21.
Jiang, Y and Wu, H (2007) Production rates of highway construction activities. International Journal of Construction Education and Research, 3(02), 81-98.
Julian Sidoli del, C (2011) An investigation into lawyer attitudes towards the use of mediation in commercial property disputes in England and Wales. International Journal of Law in the Built Environment, 3(02), 182–98.
Kaboli, A S and Carmichael, D G (2014) Truck dispatching and minimum emissions earthmoving. Smart and Sustainable Built Environment, 3(02), 170-86.
Kim, W-S, Tam, N M and Jung, D-H (2005) Experimental study on strength of cement stabilized clay. Journal of Engineering, Design and Technology, 3(02), 116–26.
Kisilewicz, T (2007) Computer simulation in solar architecture design. Architectural Engineering and Design Management, 3(02), 106–23.
Kocaturk, T (2007) An investigation of the emerging knowledge in digital design from a multidisciplinary perspective. Architectural Engineering and Design Management, 3(02), 93–105.
Lenard, D, Raftery, J and McGeorge, D (1997) Designing a research methodology. Journal of Construction Procurement, 3(02), 19–33.
Leviäkangas, P, Wigan, M and Haapasalo, H (2013) Financial anatomy of E4 Helsinki-Lahti shadow toll PPP-project. Built Environment Project and Asset Management, 3(02), 165-80.
Lingard, H and Lin, J (2003) Managing motherhood in the Australian construction industry: work-family balance, parental leave and part-time work. Construction Economics and Building, 3(02), 15-24.
Liu, C, Lyle, B and Langston, C (2003) Estimating demolition costs for single residential buildings. Construction Economics and Building, 3(02), 33-42.
Liu, T and Wilkinson, S (2013) Can the pilot public-private partnerships project be applied in future urban rail development?: A case study of Beijing Metro Line 4 project. Built Environment Project and Asset Management, 3(02), 250-63.
Loosemore, M (2003) Impediments to reform in the Australian building and construction industry. Construction Economics and Building, 3(02), 1-8.
Love, P E D, Tse, R Y C, Holt, G D and Proverbs, D G (2002) Transaction Costs, Learning, and Alliances. Journal of Construction Research, 3(02), 193–207.
Luke, B (2011) Judges, child trespassers and occupiers' liability. International Journal of Law in the Built Environment, 3(02), 126–45.
Mahdavinejad, M, Bemanian, M, Abolvardi, G and Elhamian, S M (2012) Analysing the state of seismic consideration of architectural non-structural components (ANSCs) in design process (based on IBC). International Journal of Disaster Resilience in the Built Environment, 3(02), 133-47.
Maree, C (2011) Comparative analysis of some aspects of assessment of damages for contractual breaches in England and Wales, Australia and New Zealand. International Journal of Law in the Built Environment, 3(02), 113–25.
Marshall, H E (1985) A graphical approach to discount payback. Construction Management and Economics, 3(02), 105-20.
Marzouk, M and Moselhi, O (2003) A decision support tool for construction bidding. Construction Innovation, 3(02), 111–24.
McCabe, S (1997) Using suitable tools for researching what quality managers in construction organizations actually do. Journal of Construction Procurement, 3(02), 72–87.
McLaughlin, P (2003) Peer assessment for construction management and quantity surveying students. Construction Economics and Building, 3(02), 43-49.
Meistad, T (2014) How energy efficient office buildings challenge and contribute to usability. Smart and Sustainable Built Environment, 3(02), 110-31.
Miller, S, Haupt, T C and Chileshe, N (2005) Student perceptions of the first year civil engineering course content. Journal of Engineering, Design and Technology, 3(02), 180–9.
Mills, A (2003) Property and construction professions: the views of industry leaders. Construction Economics and Building, 3(02), 9-14.
Mladenovic, G, Vajdic, N, Wündsch, B and Temeljotov-Salaj, A (2013) Use of key performance indicators for PPP transport projects to meet stakeholders’ performance objectives. Built Environment Project and Asset Management, 3(02), 228-49.
Moore, J D and Gloeckner, G W (2007) A theory of women's career choice in Construction Management: recommendations for academia. International Journal of Construction Education and Research, 3(02), 123-39.
Mootanah, D P (1998) The effective management of risk in concession projects. Journal of Financial Management of Property and Construction, 3(02), 27–40.
Nikolaidis, N and Roumboutsos, A (2013) A PPP renegotiation framework: a road concession in Greece. Built Environment Project and Asset Management, 3(02), 264-78.
Nirupama, N (2012) Risk and vulnerability assessment: a comprehensive approach. International Journal of Disaster Resilience in the Built Environment, 3(02), 103-14.
Omar, I and Mncwango, S (2005) Sanitary landfill energy harnessing and applications. Journal of Engineering, Design and Technology, 3(02), 127–39.
Oyodele, L, Jaiyeoba, B and Fadeyi, M (2003) Design factors influencing quality of building projects in Nigeria: consultants' perception. Construction Economics and Building, 3(02), 25-32.
Patricia, N (2011) The use of mediation in preventing homelessness in England. International Journal of Law in the Built Environment, 3(02), 146–58.
Pellegrino, R, Vajdic, N and Carbonara, N (2013) Real option theory for risk mitigation in transport PPPs. Built Environment Project and Asset Management, 3(02), 199-213.
Rachelle, A (2011) Guest editorial: comparative research at the frontier of planning law: The case of compensation rights for land use regulations. International Journal of Law in the Built Environment, 3(02), 100–12.
Rooke, J D (1997) Developing a more empirical approach to culture, attitude and motivation in construction management research: a critique and a proposal. Journal of Construction Procurement, 3(02), 45–55.
Root, D, Fellows, R F and Hancock, M (1997) Quantitative versus qualitative or positivism and interactionism: a reflection of ideology in the current methodological debate?. Journal of Construction Procurement, 3(02), 34–44.
Roumboutsos, A and Macário, R M R (2013) Public private partnerships in transport: theory and practice. Built Environment Project and Asset Management, 3(02), 160-4.
Runeson, G (1997) The methodology of building economics research. Journal of Construction Procurement, 3(02), 3–18.
Sanchez, A, X, Lehtiranta, L, Hampson, K D and Kenley, R (2014) Evaluation framework for green procurement in road construction. Smart and Sustainable Built Environment, 3(02), 153-69.
Sfakianakis, E and Laar, M v d (2013) Fiscal effects and public risk in public-private partnerships. Built Environment Project and Asset Management, 3(02), 181-98.
Shen, L-Y, Wu, M and Wang, J Y (2002) A model for assessing the feasibility of construction project in contributing to the attainment of sustainable development. Journal of Construction Research, 3(02), 255–69.
Thorpe, D (2003) Online Remote Construction Management trials in Queensland Department of Main Roads: a participant’s perspective. Construction Innovation, 3(02), 65–79.
Trethewy, R W (2005) The effect of feedback on risk taking in the Australian construction industry. Journal of Engineering, Design and Technology, 3(02), 109–15.
Tse, R Y C, Ganesan, S and So, H M (1998) Property cycles in Hong Kong: causes and impacts. Journal of Financial Management of Property and Construction, 3(02), 2–26.
Tseng, A A, Tanaka, M, Leeladharan, B and Choi, J G (2003) Rotating laser-based system for full profile measurement. Construction Innovation, 3(02), 97–110.
Vakili-Ardebili, A and Boussabaine, A H (2007) Creating value through sustainable building design. Architectural Engineering and Design Management, 3(02), 83–92.
Wickramaratne, S, Ruwanpura, J, Ranasinghe, U, Walawe-Durage, S, Adikariwattage, V and Wirasinghe, S C (2012) Ranking of natural disasters in Sri Lanka for mitigation planning. International Journal of Disaster Resilience in the Built Environment, 3(02), 115-32.
Woodhead, R M and Downs, C G (2002) Facilitation as a research method to improve value management capabilities. Journal of Construction Research, 3(02), 209–16.
Yohanis, Y G and Norton, B (1998) Estimating at the earliest stages of design the financial cost and operational energy requirement of buildings. Journal of Financial Management of Property and Construction, 3(02), 41–58.