ARCOM Conference Paper Abstracts Database:
Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 84 results ...
Al-Hussein, M, Alkass, S and Moselhi, O (2001) An algorithm for mobile crane selection and location on construction sites. Construction Innovation, 1(02), 91–105.
Allotey, N K, Arku, G and Amponsah, P E (2010) Earthquake-disaster preparedness: the case of Accra. International Journal of Disaster Resilience in the Built Environment, 1(02), 140–56.
Antwi, A and Deakin, M (1996) Discounting, obsolescence, depreciation and their effects on the environment of cities. Journal of Financial Management of Property and Construction, 1(02), 39–56.
Aranda-Mena, G, Sher, W, Gameson, R and Ward, P (2005) Evolving trends in nD modelling: the 'construction planning workbench'. Architectural Engineering and Design Management, 1(02), 111–26.
Barton, R T (2000) Soft value management methodology for use in project initiation: a learning journey. Journal of Construction Research, 1(02), 109–22.
Behm, M and Hock, P C (2012) Safe design of skyrise greenery in Singapore. Smart and Sustainable Built Environment, 1(02), 186-205.
Bower, D J, Hinks, J, Wright, H, Hardcastle, C and Cuckow, H (2001) ICTs, videoconferencing and the construction industry: opportunity or threat?. Construction Innovation, 1(02), 129–44.
Bröchner, J (1994) Precontractual investigation and risk aversion. Engineering, Construction and Architectural Management, 1(02), 91–101.
Brett-Jones, A T (1983) Barchester low-rise: a case study of a management contract for remedial work to a large housing scheme. Construction Management and Economics, 1(02), 91-117.
Brown, C, Milke, M and Seville, E (2010) Waste management as a “Lifeline”? A New Zealand case study analysis. International Journal of Disaster Resilience in the Built Environment, 1(02), 192–206.
Chan, A P C (1995) Towards an expert system on project procurement. Journal of Construction Procurement, 1(02), 111–23.
Chan, A P C, Wong, J M W and Chiang, Y H (2003) Modelling Labour Demand at Project Level — An Empirical Study in Hong Kong. Journal of Engineering, Design and Technology, 1(02), 135–50.
Cheung, S-O, Ng, S T, Lam, K-C and Sin, W-S (2001) A fuzzy sets model for construction dispute evaluation. Construction Innovation, 1(02), 117–27.
Cheung, S, Lam, K, Wong, S S and Wong S K (2001) The fee sensitive risk exposures of project authorized person in Hong Kong. Construction Economics and Building, 1(02), 65-72.
Cox, A and Furlong, P (1995) European procurement rules and national preference: explaining the local sourcing of public works contracts in the EU in 1993. Journal of Construction Procurement, 1(02), 87–99.
Dawood, N N (1996) A strategy for a computer-based materials management system for the building industry. Journal of Financial Management of Property and Construction, 1(02), 17–28.
Deshmukh, A, Oh, E H and Hastak, M (2011) Impact of flood damaged critical infrastructure on communities and industries. Built Environment Project and Asset Management, 1(02), 156-75.
Edwards, D J, Cabahug, R R and Nicholas, J (2003) The Impact of Training and Education Characteristics Upon Plant Operator Maintenance Proficiency. Journal of Engineering, Design and Technology, 1(02), 119–34.
Elliot, C and Palmer, A (1996) Life cycle energy analysis of the building resource. Journal of Financial Management of Property and Construction, 1(02), 5–16.
Flanagan, R and Norman, G (1983) The accuracy and monitoring of quantity surveyors' price forecasting for building work. Construction Management and Economics, 1(02), 157-80.
Foliente, G and Seo, S (2012) Modelling building stock energy use and carbon emission scenarios. Smart and Sustainable Built Environment, 1(02), 118-38.
Fong, P S-W (2000) Facilitated team learning in value management teams. Journal of Construction Research, 1(02), 99–107.
Ganah, A A (2003) The Use of Computer Visualisation in Communicating Constructability Information in UK. Journal of Engineering, Design and Technology, 1(02), 151–67.
Holt, G D and Faniran, O (2000) Construction management research: a blend of rationalist and interpretative paradigms. Journal of Construction Research, 1(02), 177–82.
Hutchings, M and Christofferson, J (2005) Factors leading to construction company success: perceptions of small-volume residential contractors. International Journal of Construction Education and Research, 1(02), 102–11.
Ilter, D and Dikbas, A (2009) An analysis of the key challenges to the widespread use of mediation in the Turkish construction industry. International Journal of Law in the Built Environment, 1(02), 143-55.
Jackson, B (2005) The perceptions of experienced construction practitioners regarding ethical transgressions in the construction industry. International Journal of Construction Education and Research, 1(02), 112–28.
Jackson, B J (2005) Design-build education at associated schools of construction undergraduate programs. International Journal of Construction Education and Research, 1(02), 75–88.
Jeary, A and Jeary, I (2001) The influence of flooding risk on infrastructure development in western Sydney. Construction Economics and Building, 1(02), 57-64.
Karunasena, G and Rameezdeen, R (2010) Post-disaster housing reconstruction: Comparative study of donor vs owner-driven approaches. International Journal of Disaster Resilience in the Built Environment, 1(02), 173–91.
Kashiwagi, D T and Massner, S (2005) Solving the construction craftperson skill shortage problem through construction undergraduate and graduate education. International Journal of Construction Education and Research, 1(02), 89–101.
Kazmierczak, A and Bichard, E (2010) Investigating homeowners' interest in property-level flood protection. International Journal of Disaster Resilience in the Built Environment, 1(02), 157–72.
Kennedy, R and Sidwell, A C (2001) Re-engineering the construction delivery process: The Museum of Tropical Queensland, Townsville – A Case Study. Construction Innovation, 1(02), 77–89.
Korstanje, M (2010) Commentaries on our new ways of perceiving disasters. International Journal of Disaster Resilience in the Built Environment, 1(02), 241–8.
Kwon, A H C, Then, D and Skitmore, M R (2000) Risk management in Singapore construction joint ventures. Journal of Construction Research, 1(02), 139–49.
Lansley, P R (1983) A practical approach to auditing organizational flexibility. Construction Management and Economics, 1(02), 145-56.
Lansley, P R and Quince, T (1981) Organizational responses to a major recession. Construction Papers, 1(02), 5–16.
Leopold, E and Bishop, D (1983) Design philosophy and practice in speculative housebuilding: Part 1. Construction Management and Economics, 1(02), 119-44.
Ling, F Y Y and Ng, W T (2011) Boosting performance of road infrastructure: A case study based on motorist satisfaction in Singapore. Built Environment Project and Asset Management, 1(02), 211-25.
Loosemore, M (1994) Dealing with unexpected problems-do contracts help? A comparison of the NEC and JCT 80 forms. Engineering, Construction and Architectural Management, 1(02), 115–37.
Lowe, J G (1996) Technological change and construction. Journal of Financial Management of Property and Construction, 1(02), 65–94.
Madritsch, T and Ebinger, M (2011) A management framework for the built environment: BEM2/BEM3. Built Environment Project and Asset Management, 1(02), 111-21.
Mahato, B K and Ogunlana, S O (2011) Conflict dynamics in a dam construction project: a case study. Built Environment Project and Asset Management, 1(02), 176-94.
Masurier, J L, Blockley, D and Wood, D M (2000) Management of value and uncertainty in construction projects. Journal of Construction Research, 1(02), 123–9.
McDermott, P and Quinn, B (1995) Latham causes conflict: institutional development in the UK construction industry. Journal of Construction Procurement, 1(02), 150–64.
Mootanah, D P (2000) Theory meets practice: proposal for a dynamic value and risk methodology for project management. Journal of Construction Research, 1(02), 131–8.
Naji, K K (2005) Virtual environments for improving construction site safety. Architectural Engineering and Design Management, 1(02), 93–102.
Najjir, G, Love, P and Runeson, G (2001) Issues for the global construction market. Construction Economics and Building, 1(02), 73-81.
Nicholas, J, Holt, G D and Mihsein, M (2000) Predicting materials suppliers' bad debt. Journal of Construction Research, 1(02), 159–67.
Nimcharoenwon, P and Miller, G (2001) Combating the 'sick building syndrome' by improving indoor air quality. Construction Economics and Building, 1(02), 82-89.
O'Reilly, M P and Mawdesley, M J (1994) The evaluation of construction disputes: a risk approach. Engineering, Construction and Architectural Management, 1(02), 103–14.
Oloke, D A, Edwards, D J and Thorpe, T A (2003) Predicting Construction Plant Breakdown Time Using Time Series Modelling. Journal of Engineering, Design and Technology, 1(02), 202–21.
Ormerod, M G and Newton, R A (2005) Moving beyond accessibility: the principles of universal (inclusive) design as a dimension in nD modelling of the built environment. Architectural Engineering and Design Management, 1(02), 103–10.
Oyedele, L O, Tham, K W, Jaiyeoba, B E and Fadeyi, M O (2003) Model for Predicting Architect's Performance in Building Delivery Process. Journal of Engineering, Design and Technology, 1(02), 168–86.
Pedro, J B, Meijer, F and Visscher, H (2009) The Portuguese building regulation system: a critical review. International Journal of Law in the Built Environment, 1(02), 156-71.
Plat, H T (1996) Property values and implications of refurbishment costs. Journal of Financial Management of Property and Construction, 1(02), 57–64.
Poortman, E R and Bons, H N M (1994) Information for the management of the building-materials flow. Engineering, Construction and Architectural Management, 1(02), 139–46.
Ramsay-Dawber, P A (1995) A critique of the business performance measures of UK construction companies. Journal of Construction Procurement, 1(02), 100–10.
Raphael, B (2011) Multi-criteria decision making for collaborative design optimization of buildings. Built Environment Project and Asset Management, 1(02), 122-36.
Ren, Z, Chrysostomou, V and Price, T (2012) The measurement of carbon performance of construction activities: A case study of a hotel construction project in South Wales. Smart and Sustainable Built Environment, 1(02), 153-71.
Russo, J G (1981) Construction marketing in the USA: a viable system for success and control. Construction Papers, 1(02), 29–35.
Saha, S, greville, C and Mullins, T (2001) Optimisation of construction process inspection rates using a learning approach. Construction Economics and Building, 1(02), 1-13.
Seni, D A (2000) From scientific management to process engineering: the spontaneous theory of technological value in the design of work in organizations. Journal of Construction Research, 1(02), 91–8.
Sherry, C (2009) The New South Wales strata and Community Titles Acts: A case study of legislatively created high rise and master planned communities. International Journal of Law in the Built Environment, 1(02), 130-42.
Sidwell, A C, Budiawan, D and Ma, T (2001) The significance of the tendering contract on the opportunities for clients to encourage contractorled innovation. Construction Innovation, 1(02), 107–16.
Singh, A (2011) Bayesian analysis for causes of failure at a water utility. Built Environment Project and Asset Management, 1(02), 195-210.
Smallwood, J and Venter, D (2001) The role of the media in South African construction health and safety. Construction Economics and Building, 1(02), 37-46.
Smith, J (2005) An approach to developing a performance brief at the project inception stage. Architectural Engineering and Design Management, 1(02), 3–20.
Stansfield, F R (1995) Work in the IT industry on usability provides an agenda for improvement of construction procurement methods. Journal of Construction Procurement, 1(02), 124–49.
Stewart, P (2001) The role of e-commerce systems for the construction industry. Construction Economics and Building, 1(02), 24-36.
Tan, W and Elias, Y (2000) Learning-by-doing in Singapore construction. Journal of Construction Research, 1(02), 151–8.
Tazilan, A (2012) Identifying microarchitecture for sustainable design in Malaysia. Smart and Sustainable Built Environment, 1(02), 172-85.
Teo, A and Runeson, G (2001) Aspects of market differentiation in the building industry. Construction Economics and Building, 1(02), 14-23.
Trethewy, R W and Atkinson, M (2003) Enhanced Safety, Health and Environment Outcomes Through Improved Design. Journal of Engineering, Design and Technology, 1(02), 187–201.
Valizadeh, R and Elmi, M (2010) Feasibility studies for optimum establishment of rural occupancy in mountainous regions. International Journal of Disaster Resilience in the Built Environment, 1(02), 221–40.
Wijetunge, J (2010) Assessment of potential tsunamigenic seismic hazard to Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 1(02), 207–20.
Wilkinson, S (2001) An analysis of the use of information technology for project management in the New Zealand construction industry. Construction Economics and Building, 1(02), 47-56.
Wong, F K W, Chan, S C M, Tse, R Y C and Love, P E D (2000) Improving safety knowledge through training: the case of Hong Kong. Journal of Construction Research, 1(02), 169–75.
Woodhead, R (2000) From individual perspectives to a global VM potential. Journal of Construction Research, 1(02), 87–90.
Xu, M, Duffield, C and Ma, J (2011) Performance of mid-project reviews (MPRs): quantification based on fuzzy recognition. Built Environment Project and Asset Management, 1(02), 137-55.
Yildirim, K, Hidayetoglu, M L and Sen, A (2012) Effects on sustainability of various skylight systems in buildings with an atrium. Smart and Sustainable Built Environment, 1(02), 139-52.
Zhang, X, Sexton, M G, Goulding, J S, Aouad, G and Kagioglou, M (2005) Performance modelling for the design of a hybrid concrete structural frame. Architectural Engineering and Design Management, 1(02), 83–91.
Ziegler, E H (2009) The case for megapolitan growth management in the twenty-first century: Regional urban planning and sustainable development in the USA. International Journal of Law in the Built Environment, 1(02), 105-29.
Zou, P X W and Roslan, B A (2005) Different perspectives towards using web-based project management systems in construction: large enterprises versus small- and medium-sized enterprises. Architectural Engineering and Design Management, 1(02), 127–43.