Akin, F D, Damci, A and Arditi, D (2024) Optimum finance-based scheduling. Journal of Construction Engineering and Management, 150(09).
Assaad, R H, Omran, A, Soliman, N and Assaf, G (2024) Prediction of the lateral pressure of self-consolidating concrete on construction formwork systems using machine-learning algorithms. Journal of Construction Engineering and Management, 150(09).
Assaf, G and Assaad, R H (2024) Analyzing the critical success factors affecting project bundling performance of infrastructure projects. Journal of Construction Engineering and Management, 150(09).
Chammout, B, El-Adaway, I H, Abdul Nabi, M and Assaad, R H (2024) Price escalation in construction projects: Examining national and international contracts. Journal of Construction Engineering and Management, 150(09).
Dorignon, L, Oswald, D, Kempton, L, Boehme, T, Iyer-Raniga, U, Moore, T and Dalton, T (2024) Investigating residential building materials in a circular economy: An Australian perspective. Journal of Construction Engineering and Management, 150(09).
Görsch, C, Seppänen, O, Peltokorpi, A and Lavikka, R (2024) Unlocking productivity: Revealing waste and hidden disturbances impacting mep workers. Journal of Construction Engineering and Management, 150(09).
Gao, M Y, Han, J, Yang, Y, Tiong, R L K, Zhao, C and Han, C (2024) BIM-based and IoT-driven smart tracking for precast construction dynamic scheduling. Journal of Construction Engineering and Management, 150(09).
Jiang, Y, Yang, G, Li, H, Zhang, T and Khudhair, A (2024) Physics-informed knowledge-driven decision-making framework for holistic bridge maintenance. Journal of Construction Engineering and Management, 150(09).
Koo, H J, Kelly, D and Deman, D (2024) Risk assessment of the challenges in the adaptive reuse of historic buildings. Journal of Construction Engineering and Management, 150(09).
Namian, M, Nabil, F R, Al-Mhdawi, M K S, Kermanshachi, S S and Nnaji, C (2024) Postpandemic era: Investigating the impact of COVID-19 on construction workers' situational awareness. Journal of Construction Engineering and Management, 150(09).
Ning, X, Yang, Y, Liu, C and Han, Y (2024) Construction workers' unsafe behavior contagion under government-contractor dual influence. Journal of Construction Engineering and Management, 150(09).
Olugboyega, O (2024) Diverse forms of greed and self-interest that contribute to corruption among construction stakeholders. Journal of Construction Engineering and Management, 150(09).
Ouyang, Y and Luo, X (2024) Effects of physical fatigue on construction workers' visual search patterns during hazard identification. Journal of Construction Engineering and Management, 150(09).
Paneru, S, Suh, S, Seo, W and Rausch, C (2024) Evaluating the decarbonization potential of industrialized construction: A review of the current state, opportunities, and challenges. Journal of Construction Engineering and Management, 150(09).
Sadoughi, A, Kouhirostami, M, Kouhirostamkolaei, M, Qi, B and Costin, A (2024) Autonomous building design for manufacturing and assembly: A systematic review of design application, challenges, and opportunities. Journal of Construction Engineering and Management, 150(09).
Shahedi, F, Etemadfard, H, Omrani, F and Ghalehnovi, M (2024) Cost performance modeling for steel fabrication shops with machine learning algorithms. Journal of Construction Engineering and Management, 150(09).
Shuang, Q, Liu, X, Wang, Z and Xu, X (2024) Automatically categorizing construction accident narratives using the deep-learning model with a class-imbalance treatment technique. Journal of Construction Engineering and Management, 150(09).
Wang, R D, Zayed, T, Eltoukhy, A E E and Wu, H (2024) Integrated planning approach for optimizing tower crane and truck locations in modular integrated construction. Journal of Construction Engineering and Management, 150(09).
- Type: Journal Article
- Keywords: integer linear programming; modular integrated construction; tower crane layout planning; truck location
- ISBN/ISSN: 0733-9364
- URL: http://doi.org/10.1061/JCEMD4.COENG-14200
- Abstract:
Tower crane layout planning (TCLP) is key to ensure the safety and productivity of construction projects. Previous studies on TCLP mainly focused on the typical in situ construction method, however, overlooking modular integrated construction (MiC). This study aims to develop an integrated planning approach for optimizing the locations of tower cranes and trucks for MiC across the entire construction site. This approach consists of four objective components. First, identifying potential locations for cranes and trucks by adopting a gridding method and an intersection examination algorithm. Second, estimating the crane operation duration. Third, optimizing the crane and truck locations by developing an integer linear programming (ILP) model while considering various constraints, such as the demand fulfillment, the crane's lifting capacity, and the multiple truck parking areas. Lastly, optimizing the distance between cranes to avoid crane blocking on site. The proposed approach is validated via three high-rise residential MiC projects. The results achieve 19.4%-37.9% reductions in cranes' operation durations, as well as carbon emissions from the original plan. Compared with another existing TCLP method made from limited predefined layout plans, a 29.4% improvement is observed. Moreover, three aspects to extend the application of the approach are discussed: (1) the multiple tower crane layout scenario, (2) the impact of the number of truck points, and (3) the trade-offs between computing effectiveness and performance. The approach realizes the objective of TCLP decision-making for multi-crane multitruck MiC throughout the whole construction site. Construction practitioners can use this approach for decision-making which helps enhance the effectiveness of their tower crane layout designs.
Wu, H, Chang, Y and Chen, Y (2024) Transitioning work arrangements in the construction industry: Changes in time-use patterns and individual greenhouse gas emissions. Journal of Construction Engineering and Management, 150(09).
Yang, J, Wu, Y and Li, D (2024) Block planning based on grid's topology for the dismantling of long-span spatial lattice structures. Journal of Construction Engineering and Management, 150(09).
Zhang, Y, Chang, R, Mao, W, Zuo, J, Liu, L and Han, Y (2024) Challenges of automating interior construction progress monitoring. Journal of Construction Engineering and Management, 150(09).
Zhang, Y, Liu, L, Song, Z, Zhao, Y and He, S (2024) Enhancing tunnel boring machine penetration rate predictions through particle swarm optimization and elman neural networks. Journal of Construction Engineering and Management, 150(09).