Abdel Aziz, A M (2024) Statistical analysis and representation models of calendar-day liquidated damages. Journal of Construction Engineering and Management, 150(06).
Cao, N and Cheung, S O (2024) Voluntary mediation as a tenable resolution mechanism for construction disputes. Journal of Construction Engineering and Management, 150(06).
Cui, L Z, Liu, J, Luo, H, Wang, J, Zhang, X, Lv, G and Xie, Q (2024) Deformation measurement of tunnel shotcrete liner using the multiepoch lidar point clouds. Journal of Construction Engineering and Management, 150(06).
Han, Y, Soomro, M A, Li, Y, Garvin, M J and Xue, R (2024) Exploring farmers' willingness to engage in participatory irrigation infrastructure programs: Evidence from a water-stressed region. Journal of Construction Engineering and Management, 150(06).
Houng, S C, Pal, A and Lin, J J (2024) 4D BIM and reality model-driven camera placement optimization for construction monitoring. Journal of Construction Engineering and Management, 150(06).
Jin, Z, Gambatese, J A and Nnaji, C (2024) Musculoskeletal disorder risk assessment in modern ready-made concrete formwork construction. Journal of Construction Engineering and Management, 150(06).
Kim, J, Chung, S and Chi, S (2024) Cross-lingual information retrieval from multilingual construction documents using pretrained language models. Journal of Construction Engineering and Management, 150(06).
Kim, S, Ghimire, P, Jeong, H D and Barutha, P (2024) Comparative analysis of project risks across construction sectors. Journal of Construction Engineering and Management, 150(06).
Liu, G, Ma, Z, Li, J, Li, S, Zhou, X and Song, Y (2024) Framework of digital lean construction and implementation of its management platform for the construction phase. Journal of Construction Engineering and Management, 150(06).
Liu, W, Zhang, J, Qu, C and Zhang, H (2024) Performance of priority rules for finance-based and resource-constrained project scheduling heuristics. Journal of Construction Engineering and Management, 150(06).
- Type: Journal Article
- Keywords: finance-based projects; heuristic methods; priority rules; project scheduling
- ISBN/ISSN: 0733-9364
- URL: http://doi.org/10.1061/JCEMD4.COENG-14633
- Abstract:
Over the years, the finance-based and resource-constrained project scheduling problem (FBRCPSP) has been aimed at scheduling activities and offsetting the capital gap without exceeding credit and renewable resource limits in capital-driven construction projects. However, the heuristics proposed for the FBRCPSP in previous studies neglected to focus on identifying efficient priority rules, which are understandable and intuitive for construction practitioners with different roles. Accordingly, this study explores efficient priority rules and evaluates their performance according to modified serial and parallel schedule generation scheme heuristics for the FBRCPSP. First, 11 priority rules that cover the project network, schedule, activity, and resource information are introduced, and three priority rules related to activity information are designed. Second, the two priority rule-based heuristics are applied in an example to generate multiple project schedules according to the different combinations of priority rules and heuristics. Furthermore, the performance of priority rules is tested on the metrics of project duration and profit through numerical experiments. The results show that the priority rules of the latest start time, latest finish time, and old great rank positional weight are the three best priority rules in general. Additionally, the priority rules evenly present more stable and superior results than those obtained by other priority rules for the different levels of weekly fixed overhead cost and the scenarios of contract terms. Based on the intuitive heuristics, the selected efficient priority rules assist contractors in deciding which priority rule should be applied in practice, and project managers can employ an effective priority rule to establish a baseline schedule in the initial project phase and quickly adjust the plan when it becomes infeasible for project execution.
Masood, R, Roy, K, Gonzalez, V A and Lim, J B P (2024) Ameliorating supply chains of prefabricated housebuilding: An integrated performance framework. Journal of Construction Engineering and Management, 150(06).
Shen, J, Liu, S and Zhang, J (2024) Using text mining and Bayesian network to identify key risk factors for safety accidents in metro construction. Journal of Construction Engineering and Management, 150(06).
Shi, Q, Wang, Z and Zhu, J (2024) Developing collaborative driving mechanism of prefabricated buildings using multiagent stochastic evolutionary game. Journal of Construction Engineering and Management, 150(06).
Wang, W, Hao, S, Zhong, H and Sun, Z (2024) Toward sustainable construction: Optimizing carbon emission reduction in the building supply chain through game-theoretic strategies, government subsidies, and cost-sharing contract. Journal of Construction Engineering and Management, 150(06).
Wu, H, Zhang, P, Li, H, Zhong, B, Guo, S, Fung, I W H and Lee, Y Y (2024) Blockchain impact on construction quality management and its adoption analysis: A game theory-based method. Journal of Construction Engineering and Management, 150(06).
Yang, Z and Lu, W (2024) Lean modular integrated construction production phase planning under uncertainties: A big data-driven optimization approach. Journal of Construction Engineering and Management, 150(06).
Zeberga, M S, Haaskjold, H and Hussein, B (2024) Digital technologies for preventing, mitigating, and resolving contractual disagreements in the AEC industry: A systematic literature review. Journal of Construction Engineering and Management, 150(06).
Zhang, F, Liu, H, Chen, Z, Wang, L, Zhang, Q and Guo, L (2024) Collision risk warning model for construction vehicles based on YOLO and DeepSORT algorithms. Journal of Construction Engineering and Management, 150(06).