Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Abdel Aziz, A M (2024) Statistical analysis and representation models of calendar-day liquidated damages. Journal of Construction Engineering and Management, 150(06).

Cao, N and Cheung, S O (2024) Voluntary mediation as a tenable resolution mechanism for construction disputes. Journal of Construction Engineering and Management, 150(06).

Cui, L Z, Liu, J, Luo, H, Wang, J, Zhang, X, Lv, G and Xie, Q (2024) Deformation measurement of tunnel shotcrete liner using the multiepoch lidar point clouds. Journal of Construction Engineering and Management, 150(06).

Han, Y, Soomro, M A, Li, Y, Garvin, M J and Xue, R (2024) Exploring farmers' willingness to engage in participatory irrigation infrastructure programs: Evidence from a water-stressed region. Journal of Construction Engineering and Management, 150(06).

Houng, S C, Pal, A and Lin, J J (2024) 4D BIM and reality model-driven camera placement optimization for construction monitoring. Journal of Construction Engineering and Management, 150(06).

Jin, Z, Gambatese, J A and Nnaji, C (2024) Musculoskeletal disorder risk assessment in modern ready-made concrete formwork construction. Journal of Construction Engineering and Management, 150(06).

  • Type: Journal Article
  • Keywords: concrete formwork; musculoskeletal disorder; occupational health and safety; rapid entire body assessment method
  • ISBN/ISSN: 0733-9364
  • URL: http://doi.org/10.1061/JCEMD4.COENG-14532
  • Abstract:
    Construction operations, particularly concrete formwork, pose significant risks of musculoskeletal disorders (MSDs) to workers. Previous studies have examined the MSDs associated with conventional job-built formwork. In light of the growing popularity of modern ready-made formwork systems, and the claim that such systems reduce MSDs, it is imperative that researchers characterize the activities associated with the use of these systems and offer empirical insight into their relationship with MSDs. In response to this need, this study aims to assess and compare MSD risks related to different modern formwork systems. Specifically, the Rapid Entire Body Assessment (REBA), a method for full-body postural ergonomic risk assessment, was used to study the ergonomic hazards of form workers during the installation and removal of horizontal modular and prefabricated or engineered formwork systems. The findings indicate that most formwork tasks and activities subject workers to medium to high MSD risks, necessitating preventive actions or imminent preventive actions. Modular formwork systems may subject workers to fewer hazardous ergonomic working conditions compared with prefabricated or engineered formwork systems. The findings provide an improved understanding of formwork activities and the MSD risks associated with ready-made formwork system construction, and provide a valuable resource for formwork designers and constructors dedicated to improving worker health and safety in formwork construction.

Kim, J, Chung, S and Chi, S (2024) Cross-lingual information retrieval from multilingual construction documents using pretrained language models. Journal of Construction Engineering and Management, 150(06).

Kim, S, Ghimire, P, Jeong, H D and Barutha, P (2024) Comparative analysis of project risks across construction sectors. Journal of Construction Engineering and Management, 150(06).

Liu, G, Ma, Z, Li, J, Li, S, Zhou, X and Song, Y (2024) Framework of digital lean construction and implementation of its management platform for the construction phase. Journal of Construction Engineering and Management, 150(06).

Liu, W, Zhang, J, Qu, C and Zhang, H (2024) Performance of priority rules for finance-based and resource-constrained project scheduling heuristics. Journal of Construction Engineering and Management, 150(06).

Masood, R, Roy, K, Gonzalez, V A and Lim, J B P (2024) Ameliorating supply chains of prefabricated housebuilding: An integrated performance framework. Journal of Construction Engineering and Management, 150(06).

Shen, J, Liu, S and Zhang, J (2024) Using text mining and Bayesian network to identify key risk factors for safety accidents in metro construction. Journal of Construction Engineering and Management, 150(06).

Shi, Q, Wang, Z and Zhu, J (2024) Developing collaborative driving mechanism of prefabricated buildings using multiagent stochastic evolutionary game. Journal of Construction Engineering and Management, 150(06).

Wang, W, Hao, S, Zhong, H and Sun, Z (2024) Toward sustainable construction: Optimizing carbon emission reduction in the building supply chain through game-theoretic strategies, government subsidies, and cost-sharing contract. Journal of Construction Engineering and Management, 150(06).

Wu, H, Zhang, P, Li, H, Zhong, B, Guo, S, Fung, I W H and Lee, Y Y (2024) Blockchain impact on construction quality management and its adoption analysis: A game theory-based method. Journal of Construction Engineering and Management, 150(06).

Yang, Z and Lu, W (2024) Lean modular integrated construction production phase planning under uncertainties: A big data-driven optimization approach. Journal of Construction Engineering and Management, 150(06).

Zeberga, M S, Haaskjold, H and Hussein, B (2024) Digital technologies for preventing, mitigating, and resolving contractual disagreements in the AEC industry: A systematic literature review. Journal of Construction Engineering and Management, 150(06).

Zhang, F, Liu, H, Chen, Z, Wang, L, Zhang, Q and Guo, L (2024) Collision risk warning model for construction vehicles based on YOLO and DeepSORT algorithms. Journal of Construction Engineering and Management, 150(06).