Abdel Aziz, A M (2024) Statistical analysis and representation models of calendar-day liquidated damages. Journal of Construction Engineering and Management, 150(06).
Cao, N and Cheung, S O (2024) Voluntary mediation as a tenable resolution mechanism for construction disputes. Journal of Construction Engineering and Management, 150(06).
Cui, L Z, Liu, J, Luo, H, Wang, J, Zhang, X, Lv, G and Xie, Q (2024) Deformation measurement of tunnel shotcrete liner using the multiepoch lidar point clouds. Journal of Construction Engineering and Management, 150(06).
Han, Y, Soomro, M A, Li, Y, Garvin, M J and Xue, R (2024) Exploring farmers' willingness to engage in participatory irrigation infrastructure programs: Evidence from a water-stressed region. Journal of Construction Engineering and Management, 150(06).
Houng, S C, Pal, A and Lin, J J (2024) 4D BIM and reality model-driven camera placement optimization for construction monitoring. Journal of Construction Engineering and Management, 150(06).
- Type: Journal Article
- Keywords:
- ISBN/ISSN: 0733-9364
- URL: http://doi.org/10.1061/JCEMD4.COENG-14600
- Abstract:
Cameras are one of the most valuable sensors for collecting high-quality visual data on construction sites for uses ranging from surveillance to automated information exaction. The dynamic nature of sites means the visual data from cameras can suffer from occlusions and lack of coverage due to progressing works, hindering the performance of automated visual analysis methods. Therefore, manual planning and adjustments by experienced practitioners are required for appropriate camera placement at the site, which is expensive and time-consuming. Past research has simulated cameras and used algorithms with an objective function to optimize installation parameters with planned site models ranging from two-dimensional (2D) to four-dimensional (4D). However, these models lack information from ongoing site conditions, hampering actual camera performance. This study proposes a camera placement framework incorporating 4D-building information model (BIM) and reality models. The framework first identifies the camera placement determinants through expert interviews. Next, the planned BIM and reality models are used to construct the simulation environment, and camera placement parameters are optimized. The proposed framework is implemented and evaluated on a construction site. 25% average camera coverage improvement from the benchmark solution is achieved. This study further contributes to the potential application of automated visual monitoring systems on construction sites.
Jin, Z, Gambatese, J A and Nnaji, C (2024) Musculoskeletal disorder risk assessment in modern ready-made concrete formwork construction. Journal of Construction Engineering and Management, 150(06).
Kim, J, Chung, S and Chi, S (2024) Cross-lingual information retrieval from multilingual construction documents using pretrained language models. Journal of Construction Engineering and Management, 150(06).
Kim, S, Ghimire, P, Jeong, H D and Barutha, P (2024) Comparative analysis of project risks across construction sectors. Journal of Construction Engineering and Management, 150(06).
Liu, G, Ma, Z, Li, J, Li, S, Zhou, X and Song, Y (2024) Framework of digital lean construction and implementation of its management platform for the construction phase. Journal of Construction Engineering and Management, 150(06).
Liu, W, Zhang, J, Qu, C and Zhang, H (2024) Performance of priority rules for finance-based and resource-constrained project scheduling heuristics. Journal of Construction Engineering and Management, 150(06).
Masood, R, Roy, K, Gonzalez, V A and Lim, J B P (2024) Ameliorating supply chains of prefabricated housebuilding: An integrated performance framework. Journal of Construction Engineering and Management, 150(06).
Shen, J, Liu, S and Zhang, J (2024) Using text mining and Bayesian network to identify key risk factors for safety accidents in metro construction. Journal of Construction Engineering and Management, 150(06).
Shi, Q, Wang, Z and Zhu, J (2024) Developing collaborative driving mechanism of prefabricated buildings using multiagent stochastic evolutionary game. Journal of Construction Engineering and Management, 150(06).
Wang, W, Hao, S, Zhong, H and Sun, Z (2024) Toward sustainable construction: Optimizing carbon emission reduction in the building supply chain through game-theoretic strategies, government subsidies, and cost-sharing contract. Journal of Construction Engineering and Management, 150(06).
Wu, H, Zhang, P, Li, H, Zhong, B, Guo, S, Fung, I W H and Lee, Y Y (2024) Blockchain impact on construction quality management and its adoption analysis: A game theory-based method. Journal of Construction Engineering and Management, 150(06).
Yang, Z and Lu, W (2024) Lean modular integrated construction production phase planning under uncertainties: A big data-driven optimization approach. Journal of Construction Engineering and Management, 150(06).
Zeberga, M S, Haaskjold, H and Hussein, B (2024) Digital technologies for preventing, mitigating, and resolving contractual disagreements in the AEC industry: A systematic literature review. Journal of Construction Engineering and Management, 150(06).
Zhang, F, Liu, H, Chen, Z, Wang, L, Zhang, Q and Guo, L (2024) Collision risk warning model for construction vehicles based on YOLO and DeepSORT algorithms. Journal of Construction Engineering and Management, 150(06).