Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Abdel Aziz, A M (2024) Statistical analysis and representation models of calendar-day liquidated damages. Journal of Construction Engineering and Management, 150(06).

Cao, N and Cheung, S O (2024) Voluntary mediation as a tenable resolution mechanism for construction disputes. Journal of Construction Engineering and Management, 150(06).

Cui, L Z, Liu, J, Luo, H, Wang, J, Zhang, X, Lv, G and Xie, Q (2024) Deformation measurement of tunnel shotcrete liner using the multiepoch lidar point clouds. Journal of Construction Engineering and Management, 150(06).

Han, Y, Soomro, M A, Li, Y, Garvin, M J and Xue, R (2024) Exploring farmers' willingness to engage in participatory irrigation infrastructure programs: Evidence from a water-stressed region. Journal of Construction Engineering and Management, 150(06).

Houng, S C, Pal, A and Lin, J J (2024) 4D BIM and reality model-driven camera placement optimization for construction monitoring. Journal of Construction Engineering and Management, 150(06).

Jin, Z, Gambatese, J A and Nnaji, C (2024) Musculoskeletal disorder risk assessment in modern ready-made concrete formwork construction. Journal of Construction Engineering and Management, 150(06).

Kim, J, Chung, S and Chi, S (2024) Cross-lingual information retrieval from multilingual construction documents using pretrained language models. Journal of Construction Engineering and Management, 150(06).

Kim, S, Ghimire, P, Jeong, H D and Barutha, P (2024) Comparative analysis of project risks across construction sectors. Journal of Construction Engineering and Management, 150(06).

Liu, G, Ma, Z, Li, J, Li, S, Zhou, X and Song, Y (2024) Framework of digital lean construction and implementation of its management platform for the construction phase. Journal of Construction Engineering and Management, 150(06).

Liu, W, Zhang, J, Qu, C and Zhang, H (2024) Performance of priority rules for finance-based and resource-constrained project scheduling heuristics. Journal of Construction Engineering and Management, 150(06).

Masood, R, Roy, K, Gonzalez, V A and Lim, J B P (2024) Ameliorating supply chains of prefabricated housebuilding: An integrated performance framework. Journal of Construction Engineering and Management, 150(06).

Shen, J, Liu, S and Zhang, J (2024) Using text mining and Bayesian network to identify key risk factors for safety accidents in metro construction. Journal of Construction Engineering and Management, 150(06).

Shi, Q, Wang, Z and Zhu, J (2024) Developing collaborative driving mechanism of prefabricated buildings using multiagent stochastic evolutionary game. Journal of Construction Engineering and Management, 150(06).

Wang, W, Hao, S, Zhong, H and Sun, Z (2024) Toward sustainable construction: Optimizing carbon emission reduction in the building supply chain through game-theoretic strategies, government subsidies, and cost-sharing contract. Journal of Construction Engineering and Management, 150(06).

Wu, H, Zhang, P, Li, H, Zhong, B, Guo, S, Fung, I W H and Lee, Y Y (2024) Blockchain impact on construction quality management and its adoption analysis: A game theory-based method. Journal of Construction Engineering and Management, 150(06).

Yang, Z and Lu, W (2024) Lean modular integrated construction production phase planning under uncertainties: A big data-driven optimization approach. Journal of Construction Engineering and Management, 150(06).

Zeberga, M S, Haaskjold, H and Hussein, B (2024) Digital technologies for preventing, mitigating, and resolving contractual disagreements in the AEC industry: A systematic literature review. Journal of Construction Engineering and Management, 150(06).

Zhang, F, Liu, H, Chen, Z, Wang, L, Zhang, Q and Guo, L (2024) Collision risk warning model for construction vehicles based on YOLO and DeepSORT algorithms. Journal of Construction Engineering and Management, 150(06).