Abbasnejad, B, Nasirian, A, Duan, S, Diro, A, Prasad Nepal, M and Song, Y (2024) Measuring BIM implementation: A mathematical modeling and artificial neural network approach. Journal of Construction Engineering and Management, 150(05).

Asadian, E, Azeez, S, Leicht, R M and Asadi, S (2024) Exploring the barriers to women in construction and the opportunities presented through lean. Journal of Construction Engineering and Management, 150(05).

Henao, Y, Grubert, E, Korey, M, Bank, L C and Gentry, R (2024) Life cycle assessment and life cycle cost analysis of repurposing decommissioned wind turbine blades as high-voltage transmission poles. Journal of Construction Engineering and Management, 150(05).

Huang, Y, Liu, D, Bell, F M, Yu, J and Pena-Mora, F (2024) Influences of intra- and interorganizational IT innovations on knowledge sharing and team creativity: Evidence from construction projects in China. Journal of Construction Engineering and Management, 150(05).

Min, Y and Lee, H W (2024) Adoption inequalities and causal relationship between residential electric vehicle chargers and heat pumps. Journal of Construction Engineering and Management, 150(05).

Nabi, M A, El-Adaway, I H and Assaad, R H (2024) Modeling inflation transmission among different construction materials. Journal of Construction Engineering and Management, 150(05).

Nguyen, P H D and Tran, D (2024) Exploring the use of quality control plans for alternative contracting methods in highway projects. Journal of Construction Engineering and Management, 150(05).

Ning, X, Ye, X, Li, H, Rajendra, D and Skitmore, M (2024) Evolutionary game analysis of optimal strategies for construction stakeholders in promoting the adoption of green building technology innovation. Journal of Construction Engineering and Management, 150(05).

Shi, M, Chen, C, Xiao, B and Seo, J (2024) Vision-based detection method for construction site monitoring by integrating data augmentation and semisupervised learning. Journal of Construction Engineering and Management, 150(05).

Tao, Y, Hu, H, Xu, F and Zhang, Z (2024) Work-rest schedule optimization of precast production considering workers' overexertion. Journal of Construction Engineering and Management, 150(05).

Turkoglu, H, Arditi, D and Polat, G (2024) Augmented time-cost trade-off optimization using particle swarm optimization. Journal of Construction Engineering and Management, 150(05).

Wang, H, Xu, S, Cui, D, Xu, H and Luo, H (2024) Information integration of regulation texts and tables for automated construction safety knowledge mapping. Journal of Construction Engineering and Management, 150(05).

Wang, J, Liang, M and Liao, P C (2024) Toward an intuitive device for construction hazard recognition management: Eye fixation-related potentials in reinvestigation of hazard recognition performance prediction. Journal of Construction Engineering and Management, 150(05).

Wang, L, Lee, J, Nimawat, J, Han, K and Gupta, A (2024) Integrated 4D design change management model for construction projects. Journal of Construction Engineering and Management, 150(05).

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: http://doi.org/10.1061/JCEMD4.COENG-14246
  • Abstract:
    Managing design changes effectively can reduce cost overruns and schedule delays in construction projects. However, existing design change management in construction projects lacks integration with schedules, comprehensive design change information, and interoperability with other applications. This study aims to address the aforementioned limitations by presenting an integrated four-dimensional (4D) design change management model (DCMM). We developed this model by integrating design changes with 4D building information modeling (BIM) models, extracting informative data from model geometry and design files to provide essential information for design change impact analysis and management, interfacing with a data warehouse for efficient data management, and utilizing interoperable data schemas for cross-platform compatibility. The integrated 4D DCMM successfully validated its abilities through two case studies, despite certain limitations such as only focusing on tracking main structural building elements. Our study introduces significant contributions to the field of design change management in construction projects by (1) allowing design changes tracking along construction progress, thus enhancing project controls and facilitating effective communication among project teams, (2) providing comprehensive information for design change management and assessing structural integrity risks resulting from design changes, thereby improving inspection practices in construction projects, and (3) enabling universal interoperability of design change management files across various BIM applications, enhancing construction data asset management.

Wang, S, Hasan, M and Lu, M (2024) Global sensitivity analysis methodology for construction simulation models: Multiple linear regressions versus multilayer perceptions. Journal of Construction Engineering and Management, 150(05).

Zhang, S, Hua, X and Shi, X (2024) Measurement for risk perception ability. Journal of Construction Engineering and Management, 150(05).