Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 16 results ...
Abbasnejad, B, Nasirian, A, Duan, S, Diro, A, Prasad Nepal, M and Song, Y (2024) Measuring BIM implementation: A mathematical modeling and artificial neural network approach. Journal of Construction Engineering and Management, 150(05).
Asadian, E, Azeez, S, Leicht, R M and Asadi, S (2024) Exploring the barriers to women in construction and the opportunities presented through lean. Journal of Construction Engineering and Management, 150(05).
Henao, Y, Grubert, E, Korey, M, Bank, L C and Gentry, R (2024) Life cycle assessment and life cycle cost analysis of repurposing decommissioned wind turbine blades as high-voltage transmission poles. Journal of Construction Engineering and Management, 150(05).
Huang, Y, Liu, D, Bell, F M, Yu, J and Pena-Mora, F (2024) Influences of intra- and interorganizational IT innovations on knowledge sharing and team creativity: Evidence from construction projects in China. Journal of Construction Engineering and Management, 150(05).
Min, Y and Lee, H W (2024) Adoption inequalities and causal relationship between residential electric vehicle chargers and heat pumps. Journal of Construction Engineering and Management, 150(05).
Nabi, M A, El-Adaway, I H and Assaad, R H (2024) Modeling inflation transmission among different construction materials. Journal of Construction Engineering and Management, 150(05).
Nguyen, P H D and Tran, D (2024) Exploring the use of quality control plans for alternative contracting methods in highway projects. Journal of Construction Engineering and Management, 150(05).
Ning, X, Ye, X, Li, H, Rajendra, D and Skitmore, M (2024) Evolutionary game analysis of optimal strategies for construction stakeholders in promoting the adoption of green building technology innovation. Journal of Construction Engineering and Management, 150(05).
Shi, M, Chen, C, Xiao, B and Seo, J (2024) Vision-based detection method for construction site monitoring by integrating data augmentation and semisupervised learning. Journal of Construction Engineering and Management, 150(05).
Tao, Y, Hu, H, Xu, F and Zhang, Z (2024) Work-rest schedule optimization of precast production considering workers' overexertion. Journal of Construction Engineering and Management, 150(05).
Turkoglu, H, Arditi, D and Polat, G (2024) Augmented time-cost trade-off optimization using particle swarm optimization. Journal of Construction Engineering and Management, 150(05).
- Type: Journal Article
- Keywords: construction projects; multiobjective; particle swarm optimization; resource constraints; scheduling; trade-off
- ISBN/ISSN: 0733-9364
- URL: http://doi.org/10.1061/JCEMD4.COENG-14314
- Abstract:
This study proposes an optimization model based on particle swarm optimization (PSO) to achieve the objectives of minimizing project duration, project cost, and resource fluctuation while maximizing project quality and schedule flexibility. The objectives of this study are as follows: (1) to determine whether the interrelationships between these five objectives affect the outcome of the optimization; (2) to determine whether the presence or absence of resource constraints affects the solution; and (3) to verify that the solution of the PSO-based optimization model coincides with the exact mathematical solution, but faster. An example project was presented to illustrate the applicability of the proposed model. The conclusions of this study are as follows: (1) multiple objectives do interact with each other and should be evaluated simultaneously rather than one at a time to reach realistic solutions, (2) resource constraints do affect the solutions obtained, and (3) the proposed model successfully reaches an optimal solution that is extremely close to the exact mathematical solution much faster than the mathematical model.
Wang, H, Xu, S, Cui, D, Xu, H and Luo, H (2024) Information integration of regulation texts and tables for automated construction safety knowledge mapping. Journal of Construction Engineering and Management, 150(05).
Wang, J, Liang, M and Liao, P C (2024) Toward an intuitive device for construction hazard recognition management: Eye fixation-related potentials in reinvestigation of hazard recognition performance prediction. Journal of Construction Engineering and Management, 150(05).
Wang, L, Lee, J, Nimawat, J, Han, K and Gupta, A (2024) Integrated 4D design change management model for construction projects. Journal of Construction Engineering and Management, 150(05).
Wang, S, Hasan, M and Lu, M (2024) Global sensitivity analysis methodology for construction simulation models: Multiple linear regressions versus multilayer perceptions. Journal of Construction Engineering and Management, 150(05).
Zhang, S, Hua, X and Shi, X (2024) Measurement for risk perception ability. Journal of Construction Engineering and Management, 150(05).