Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 16 results ...

Abbasnejad, B, Nasirian, A, Duan, S, Diro, A, Prasad Nepal, M and Song, Y (2024) Measuring BIM implementation: A mathematical modeling and artificial neural network approach. Journal of Construction Engineering and Management, 150(05).

  • Type: Journal Article
  • Keywords: artificial neural network; building information modeling implementation; mathematical modeling; predictive modeling
  • ISBN/ISSN: 0733-9364
  • URL: http://doi.org/10.1061/JCEMD4.COENG-14262
  • Abstract:
    Evaluating the level of Building Information Modeling (BIM) implementation in construction firms is critical yet challenging in the absence of a quantitative method. This study addresses this gap. The study begins with a literature review that identified 27 BIM implementation enablers, followed by interviews with three firms to score their performance on each enabler. A mathematical model was developed to score a firm's BIM implementation based on each enabler's score. For each firm, 1 million random scenarios are generated to simulate alternative ways by which a firm's enablers' score can be improved. Subsequently, in each simulated scenario, the firm's BIM implementation score is calculated. The simulation results are incorporated into a feature-pairing neural network that has been designed specifically to provide a customized best course of action for each firm's further BIM adoption. The first contribution of this research is providing a comprehensive analysis of the dynamics and interconnectedness of factors influencing BIM adoption in AEC firms, offering insights into effective BIM adoption. The second contribution is proposing a novel quantitative approach for measuring the current level of BIM implementation and providing data-driven advice for steering the BIM implementation process. This research offers a practical contribution by providing companies with a tool to compute their BIM implementation score, allowing comparisons and benchmarking against competitors.

Asadian, E, Azeez, S, Leicht, R M and Asadi, S (2024) Exploring the barriers to women in construction and the opportunities presented through lean. Journal of Construction Engineering and Management, 150(05).

Henao, Y, Grubert, E, Korey, M, Bank, L C and Gentry, R (2024) Life cycle assessment and life cycle cost analysis of repurposing decommissioned wind turbine blades as high-voltage transmission poles. Journal of Construction Engineering and Management, 150(05).

Huang, Y, Liu, D, Bell, F M, Yu, J and Pena-Mora, F (2024) Influences of intra- and interorganizational IT innovations on knowledge sharing and team creativity: Evidence from construction projects in China. Journal of Construction Engineering and Management, 150(05).

Min, Y and Lee, H W (2024) Adoption inequalities and causal relationship between residential electric vehicle chargers and heat pumps. Journal of Construction Engineering and Management, 150(05).

Nabi, M A, El-Adaway, I H and Assaad, R H (2024) Modeling inflation transmission among different construction materials. Journal of Construction Engineering and Management, 150(05).

Nguyen, P H D and Tran, D (2024) Exploring the use of quality control plans for alternative contracting methods in highway projects. Journal of Construction Engineering and Management, 150(05).

Ning, X, Ye, X, Li, H, Rajendra, D and Skitmore, M (2024) Evolutionary game analysis of optimal strategies for construction stakeholders in promoting the adoption of green building technology innovation. Journal of Construction Engineering and Management, 150(05).

Shi, M, Chen, C, Xiao, B and Seo, J (2024) Vision-based detection method for construction site monitoring by integrating data augmentation and semisupervised learning. Journal of Construction Engineering and Management, 150(05).

Tao, Y, Hu, H, Xu, F and Zhang, Z (2024) Work-rest schedule optimization of precast production considering workers' overexertion. Journal of Construction Engineering and Management, 150(05).

Turkoglu, H, Arditi, D and Polat, G (2024) Augmented time-cost trade-off optimization using particle swarm optimization. Journal of Construction Engineering and Management, 150(05).

Wang, H, Xu, S, Cui, D, Xu, H and Luo, H (2024) Information integration of regulation texts and tables for automated construction safety knowledge mapping. Journal of Construction Engineering and Management, 150(05).

Wang, J, Liang, M and Liao, P C (2024) Toward an intuitive device for construction hazard recognition management: Eye fixation-related potentials in reinvestigation of hazard recognition performance prediction. Journal of Construction Engineering and Management, 150(05).

Wang, L, Lee, J, Nimawat, J, Han, K and Gupta, A (2024) Integrated 4D design change management model for construction projects. Journal of Construction Engineering and Management, 150(05).

Wang, S, Hasan, M and Lu, M (2024) Global sensitivity analysis methodology for construction simulation models: Multiple linear regressions versus multilayer perceptions. Journal of Construction Engineering and Management, 150(05).

Zhang, S, Hua, X and Shi, X (2024) Measurement for risk perception ability. Journal of Construction Engineering and Management, 150(05).