Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 24 results ...

Al-Mhdawi, M K S, Brito, M, Onggo, B S, Qazi, A, O'Connor, A and Namian, M (2023) Construction risk management in Iraq during the COVID-19 pandemic: Challenges to implementation and efficacy of practices. Journal of Construction Engineering and Management, 149(09).

Alankarage, S, Chileshe, N, Samaraweera, A, Rameezdeen, R and Edwards, D J (2023) Guidelines for using a case study approach in construction culture research: Application to BIM-enabled organizations. Journal of Construction Engineering and Management, 149(09).

Alikhani, H, Le, C, Jeong, H D and Damnjanovic, I (2023) Sequential machine learning for activity sequence prediction from daily work report data. Journal of Construction Engineering and Management, 149(09).

Cuciniello, G, Inzerillo, G, Corazziari, L, Ciampini, A, Degni, R, Torresi, M and Leandri, P (2023) Modeling the tire-pavement noise as a regression function of speed, mixture properties, and age of the layer. Journal of Construction Engineering and Management, 149(09).

Deng, J, Zhao, Y, Li, X, Wang, Y and Zhou, Y (2023) Network embeddedness, relationship norms, and cooperative behavior: Analysis based on evolution of construction project network. Journal of Construction Engineering and Management, 149(09).

  • Type: Journal Article
  • Keywords: cooperative behavior; evolution of construction project network; network embeddedness; relationship norms
  • ISBN/ISSN: 0733-9364
  • URL: http://doi.org/10.1061/JCEMD4.COENG-12941
  • Abstract:
    The development of cooperative relationships among project participants makes relationship norms an important governance mechanism to promote cooperative behavior. However, the research on relationship norms mostly ignored the project network environment established by project participants. A static project network cannot accurately reflect the actual project network state from the perspective of network embeddedness, but the research on the mechanism of cooperative behavior from the perspective of dynamic network embeddedness is limited. Therefore, this study overcame the limitation of static analysis. This paper divided the implementation process of construction projects into early, middle, and late phases. The theoretical model of network embeddedness, relationship norms, and cooperative behavior was tested using sample data from 716 surveys regarding the three phases from China to determine the mechanism of the effect of network embeddedness on cooperative behavior. The research results show that network embeddedness (including structural embeddedness and relational embeddedness) has a direct impact on cooperative behavior. The results also indicate that network embeddedness has an indirect impact on cooperative behavior through relationship norms. Additionally, the results further indicate that the direct and indirect effects of network embeddedness on cooperative behavior are different in different phases of construction projects. With the advance of construction projects, the influence of relational embeddedness increases, whereas the effect of structural embeddedness decreases. The research results deepen the understanding of relationship norms in construction projects and make up for the lack of research on cooperative behavior in construction projects from the perspective of dynamic networks. The research results also provide enlightenment for project participants to fully utilize the network relationships in different phases of construction projects, stimulate the establishment of relationship norms, and promote cooperation. This is helpful to improve the cooperative construction management mode.

Dhanshyam, M and Srivastava, S K (2023) Decision framework for efficient risk mitigation in BOT highway infrastructure service projects. Journal of Construction Engineering and Management, 149(09).

Hochscheid, E, Falardeau, M, Lapalme, J, Boton, C and Rivest, L (2023) Practitioners' concerns about their liability toward BIM collaborative digital mockups: Case study in civil engineering. Journal of Construction Engineering and Management, 149(09).

Jiang, F, Lyu, Y, Zhang, Y and Guo, Y (2023) Research on the differences between risk-factor attention and risk losses in PPP projects. Journal of Construction Engineering and Management, 149(09).

Kong, Z, Ma, H, Lv, K and Shi, J J (2023) Liability of foreignness in public-private partnership projects. Journal of Construction Engineering and Management, 149(09).

Lei, Z, Sadiq Altaf, M, Cheng, Z, Liu, H and Tang, S (2023) Measurement of information loss and transfer impacts of technology systems in offsite construction processes. Journal of Construction Engineering and Management, 149(09).

Li, J, Yang, M, Liu, C, Li, A and Guo, B (2023) Listen to the companies: Exploring BIM job competency requirements by text mining of recruitment information in China. Journal of Construction Engineering and Management, 149(09).

Liang, R, Li, R and Chong, H Y (2023) Decision-making model for evaluating joint venture contractors in construction of complex infrastructure megaprojects. Journal of Construction Engineering and Management, 149(09).

Ma, H, Cao, S, Wang, Y and Zhang, H (2023) The moderating effect of optimism bias on ambivalence of workers' unsafe behaviors. Journal of Construction Engineering and Management, 149(09).

Ma, J, Li, H, Yu, X, Fang, X, Fang, B, Zhao, Z, Huang, X, Anwer, S and Xing, X (2023) Sweat analysis-based fatigue monitoring during construction rebar bending tasks. Journal of Construction Engineering and Management, 149(09).

Montalbán-Domingo, L, Torres-Machi, C, Sanz-Benlloch, A, Pellicer, E and Molenaar, K R (2023) Green public procurement in civil infrastructure construction: Current performance and main project characteristics. Journal of Construction Engineering and Management, 149(09).

Mostofi, F, Tokdemir, O B and Toǧan, V (2023) Comprehensive root cause analysis of construction defects using semisupervised graph representation learning. Journal of Construction Engineering and Management, 149(09).

Patil, K R, Bhandari, S, Agrawal, A, Ayer, S K, Perry, L A and Hallowell, M R (2023) Analysis of youtube comments to inform the design of virtual reality training simulations to target emotional arousal. Journal of Construction Engineering and Management, 149(09).

Prieto, A J and Alarcón, L F (2023) Using fuzzy inference systems for lean management strategies in construction project delivery. Journal of Construction Engineering and Management, 149(09).

Pu, H, Fan, X, Li, W, Zhang, W, Schonfeld, P, Wei, F and Xu, Z (2023) Realizing a quick partial BIM update of subgrade in railway stations. Journal of Construction Engineering and Management, 149(09).

Qin, Y and Bulbul, T (2023) An EEG-based mental workload evaluation for ar head-mounted display use in construction assembly tasks. Journal of Construction Engineering and Management, 149(09).

Ranasinghe, U, Jefferies, M, Davis, P and Pillay, M (2023) Enabling a resilient work environment: An analysis of causal relationships between resilience engineering factors in construction refurbishment projects. Journal of Construction Engineering and Management, 149(09).

Ren, X, Li, Y and Guo, M (2023) Dynamically identifying and evaluating key barriers to promoting prefabricated buildings: Text mining approach. Journal of Construction Engineering and Management, 149(09).

Xiang, Z, Rashidi, A and Ou, G (2023) Integrating inverse photogrammetry and a deep learning-based point cloud segmentation approach for automated generation of BIM models. Journal of Construction Engineering and Management, 149(09).

Zhou, X and Liao, P C (2023) Weighing votes in human-machine collaboration for hazard recognition: Inferring a hazard-based perceptual threshold and decision confidence from electroencephalogram wavelets. Journal of Construction Engineering and Management, 149(09).