Al-Mhdawi, M K S, Brito, M, Onggo, B S, Qazi, A, O'Connor, A and Namian, M (2023) Construction risk management in Iraq during the COVID-19 pandemic: Challenges to implementation and efficacy of practices. Journal of Construction Engineering and Management, 149(09).

  • Type: Journal Article
  • Keywords: challenges and barriers; COVID-19; Iraq; risk management; risk management practices
  • ISBN/ISSN: 0733-9364
  • URL: http://doi.org/10.1061/JCEMD4.COENG-13099
  • Abstract:
    The main challenges and barriers facing the effective implementation of risk management (RM) practices in the construction industry have increased the ceiling of challenges associated with the implementation of construction projects during the COVID-19 era. The aim of this paper is to assess the level of significance of risk management implementation challenges and barriers (RMICB) and the level of efficacy of construction RM practices during COVID-19 by considering the case of Iraq. A multistage research methodology was adopted, including semistructured interviews with construction experts to identify the main RMICB and RM practices indicators; surveys to assess the identified RMICB and RM practices indicators; analytical hierarchy process-based and fuzzy-based models to quantify RMICB level of significance, and RM practices level of efficacy. Based on the adopted methodology, the authors identified a total of 34 RMICB grouped under four categories, namely analytical approach-related, behavior-related, management-related, and team-related RMICB. Moreover, the assessment of the current construction RM practices during the COVID-19 era indicated a low level of RM practices efficacy. This study significantly contributes to the body of knowledge by helping construction practitioners and researchers to better understand the RMICB that are hindering effective implementation of RM strategies for construction projects during the COVID-19 era. Furthermore, it provides valuable information to decision-makers regarding the current construction RM practices efficacy during extreme conditions.

Alankarage, S, Chileshe, N, Samaraweera, A, Rameezdeen, R and Edwards, D J (2023) Guidelines for using a case study approach in construction culture research: Application to BIM-enabled organizations. Journal of Construction Engineering and Management, 149(09).

Alikhani, H, Le, C, Jeong, H D and Damnjanovic, I (2023) Sequential machine learning for activity sequence prediction from daily work report data. Journal of Construction Engineering and Management, 149(09).

Cuciniello, G, Inzerillo, G, Corazziari, L, Ciampini, A, Degni, R, Torresi, M and Leandri, P (2023) Modeling the tire-pavement noise as a regression function of speed, mixture properties, and age of the layer. Journal of Construction Engineering and Management, 149(09).

Deng, J, Zhao, Y, Li, X, Wang, Y and Zhou, Y (2023) Network embeddedness, relationship norms, and cooperative behavior: Analysis based on evolution of construction project network. Journal of Construction Engineering and Management, 149(09).

Dhanshyam, M and Srivastava, S K (2023) Decision framework for efficient risk mitigation in BOT highway infrastructure service projects. Journal of Construction Engineering and Management, 149(09).

Hochscheid, E, Falardeau, M, Lapalme, J, Boton, C and Rivest, L (2023) Practitioners' concerns about their liability toward BIM collaborative digital mockups: Case study in civil engineering. Journal of Construction Engineering and Management, 149(09).

Jiang, F, Lyu, Y, Zhang, Y and Guo, Y (2023) Research on the differences between risk-factor attention and risk losses in PPP projects. Journal of Construction Engineering and Management, 149(09).

Kong, Z, Ma, H, Lv, K and Shi, J J (2023) Liability of foreignness in public-private partnership projects. Journal of Construction Engineering and Management, 149(09).

Lei, Z, Sadiq Altaf, M, Cheng, Z, Liu, H and Tang, S (2023) Measurement of information loss and transfer impacts of technology systems in offsite construction processes. Journal of Construction Engineering and Management, 149(09).

Li, J, Yang, M, Liu, C, Li, A and Guo, B (2023) Listen to the companies: Exploring BIM job competency requirements by text mining of recruitment information in China. Journal of Construction Engineering and Management, 149(09).

Liang, R, Li, R and Chong, H Y (2023) Decision-making model for evaluating joint venture contractors in construction of complex infrastructure megaprojects. Journal of Construction Engineering and Management, 149(09).

Ma, H, Cao, S, Wang, Y and Zhang, H (2023) The moderating effect of optimism bias on ambivalence of workers' unsafe behaviors. Journal of Construction Engineering and Management, 149(09).

Ma, J, Li, H, Yu, X, Fang, X, Fang, B, Zhao, Z, Huang, X, Anwer, S and Xing, X (2023) Sweat analysis-based fatigue monitoring during construction rebar bending tasks. Journal of Construction Engineering and Management, 149(09).

Montalbán-Domingo, L, Torres-Machi, C, Sanz-Benlloch, A, Pellicer, E and Molenaar, K R (2023) Green public procurement in civil infrastructure construction: Current performance and main project characteristics. Journal of Construction Engineering and Management, 149(09).

Mostofi, F, Tokdemir, O B and Toǧan, V (2023) Comprehensive root cause analysis of construction defects using semisupervised graph representation learning. Journal of Construction Engineering and Management, 149(09).

Patil, K R, Bhandari, S, Agrawal, A, Ayer, S K, Perry, L A and Hallowell, M R (2023) Analysis of youtube comments to inform the design of virtual reality training simulations to target emotional arousal. Journal of Construction Engineering and Management, 149(09).

Prieto, A J and Alarcón, L F (2023) Using fuzzy inference systems for lean management strategies in construction project delivery. Journal of Construction Engineering and Management, 149(09).

Pu, H, Fan, X, Li, W, Zhang, W, Schonfeld, P, Wei, F and Xu, Z (2023) Realizing a quick partial BIM update of subgrade in railway stations. Journal of Construction Engineering and Management, 149(09).

Qin, Y and Bulbul, T (2023) An EEG-based mental workload evaluation for ar head-mounted display use in construction assembly tasks. Journal of Construction Engineering and Management, 149(09).

Ranasinghe, U, Jefferies, M, Davis, P and Pillay, M (2023) Enabling a resilient work environment: An analysis of causal relationships between resilience engineering factors in construction refurbishment projects. Journal of Construction Engineering and Management, 149(09).

Ren, X, Li, Y and Guo, M (2023) Dynamically identifying and evaluating key barriers to promoting prefabricated buildings: Text mining approach. Journal of Construction Engineering and Management, 149(09).

Xiang, Z, Rashidi, A and Ou, G (2023) Integrating inverse photogrammetry and a deep learning-based point cloud segmentation approach for automated generation of BIM models. Journal of Construction Engineering and Management, 149(09).

Zhou, X and Liao, P C (2023) Weighing votes in human-machine collaboration for hazard recognition: Inferring a hazard-based perceptual threshold and decision confidence from electroencephalogram wavelets. Journal of Construction Engineering and Management, 149(09).