Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 13 results ...
Aramali, V, Gibson, G E, El Asmar, M and Sanboskani, H (2023) Novel earned value management system maturity framework and its relation to project performance. Journal of Construction Engineering and Management, 149(06).
Arora, J, Kar, S and Jha, K N (2023) Assessment of the significance of identified attributes affecting the rebar-fixing productivity using multiple regression. Journal of Construction Engineering and Management, 149(06).
Asadi, R, Rotimi, J O B and Wilkinson, S (2023) Analyzing underlying factors of rework in generating contractual claims in construction projects. Journal of Construction Engineering and Management, 149(06).
Hsu, C L, Wang, J T and Huang, Y H (2023) A functional element-naming approach for BIM elements in building envelope systems. Journal of Construction Engineering and Management, 149(06).
- Type: Journal Article
- Keywords:
- ISBN/ISSN: 0733-9364
- URL: http://doi.org/10.1061/JCEMD4.COENG-12579
- Abstract:
Building information modeling (BIM) is becoming a comprehensive, collaborative process in the architecture, engineering, and construction (AEC) industry. BIM's purpose is collaboration between project participants while integrating information and completing successful projects. Persistent and recognizable names are used as direct element identifiers in BIM. Currently, element names are manually keyed in by participants. Common data environments (CDE) are recommended by BIM standards for managing information. We discuss the collaborative environment framework in construction. Participants retrieve data using element names in data environments. To reduce manually naming BIM elements, we propose an approach that ensures a unique, recognizable name. The approach strategy is summarized in four points: (1) geometric forms are separated from geometric properties, (2) list data structures are utilized to store naming conventions, creating element names to link databases, (3) project data are distributed to participants in centralized and distributed data environments, and (4) the Grasshopper program is used to create unique element names, which are stored in a database. We present a case study of a physical curtain wall project for verification. A discussion and analysis of the five procedures, as well as the advantages and disadvantages, of our approach in diverse collaboration environments are explored.
Karamoozian, A, Wu, D and Luo, C (2023) Green supplier selection in the construction industry using a novel fuzzy decision-making approach. Journal of Construction Engineering and Management, 149(06).
Long, W, Wang, X, Liang, Y and Ye, K (2023) Characteristics of collusive practices in bidding: Mixed methods study in China. Journal of Construction Engineering and Management, 149(06).
Nguyen, T Q, Yeoh, J K W and Angelia, N (2023) Predicting percent plan complete through time series analysis. Journal of Construction Engineering and Management, 149(06).
Rathnayake, A and Middleton, C (2023) Systematic review of the literature on construction productivity. Journal of Construction Engineering and Management, 149(06).
Tao, Y, Hu, H, Xu, F and Zhang, Z (2023) Ergonomic risk assessment of construction workers and projects based on fuzzy Bayesian network and D-S evidence theory. Journal of Construction Engineering and Management, 149(06).
Tarekegn Gurmu, A (2023) Preconstruction phase management practices enhancing labor productivity in multistory building projects. Journal of Construction Engineering and Management, 149(06).
Tatari, A (2023) Simulating cost risks for prefabricated construction in developing countries using Bayesian networks. Journal of Construction Engineering and Management, 149(06).
Wang, Y, Chen, L and Zhuang, J (2023) Pricing of credit default swaps from the perspective of credit enhancement in PPP projects. Journal of Construction Engineering and Management, 149(06).
Zhang, W, Zhang, H and Yu, L (2023) Collaborative planning for stacking and installation of prefabricated building components regarding crane-collision avoidance. Journal of Construction Engineering and Management, 149(06).