Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 20 results ...
Ahmadian Fard Fini, A, Akbarnezhad, A, Rashidi, T H and Waller, S T (2017) Job Assignment Based on Brain Demands and Human Resource Strategies. Journal of Construction Engineering and Management, 143(05).
Choe, S and Leite, F (2017) Assessing Safety Risk among Different Construction Trades: Quantitative Approach. Journal of Construction Engineering and Management, 143(05).
Choi, B and Lee, S (2017) Role of Social Norms and Social Identifications in Safety Behavior of Construction Workers. II: Group Analyses for the Effects of Cultural Backgrounds and Organizational Structures on Social Influence Process. Journal of Construction Engineering and Management, 143(05).
Choi, B, Ahn, S and Lee, S (2017) Role of Social Norms and Social Identifications in Safety Behavior of Construction Workers. I: Theoretical Model of Safety Behavior under Social Influence. Journal of Construction Engineering and Management, 143(05).
Dao, B, Kermanshachi, S, Shane, J, Anderson, S and Hare, E (2017) Exploring and Assessing Project Complexity. Journal of Construction Engineering and Management, 143(05).
Hummer, J E, Arocho, I and Rasdorf, W (2017) Approach to Assessing Tradeoffs between Construction Equipment Fleet Emissions and Cost. Journal of Construction Engineering and Management, 143(05).
Jeelani, I, Albert, A and Gambatese, J A (2017) Why Do Construction Hazards Remain Unrecognized at the Work Interface?. Journal of Construction Engineering and Management, 143(05).
Jeelani, I, Albert, A, Azevedo, R and Jaselskis, E J (2017) Development and Testing of a Personalized Hazard-Recognition Training Intervention. Journal of Construction Engineering and Management, 143(05).
Kapelko, M and Abbott, M (2017) Productivity Growth and Business Cycles: Case Study of the Spanish Construction Industry. Journal of Construction Engineering and Management, 143(05).
Karatai, T R, Kaluli, J W, Kabubo, C and Thiong’o, G (2017) Soil Stabilization Using Rice Husk Ash and Natural Lime as an Alternative to Cutting and Filling in Road Construction. Journal of Construction Engineering and Management, 143(05).
Lan, A and Galy, B (2017) Evaluation of a Horizontal Lifeline System Used during Installation of Residential Roofs. Journal of Construction Engineering and Management, 143(05).
Leung, M, Liang, Q and Chan, I Y S (2017) Development of a Stressors–Stress–Performance–Outcome Model for Expatriate Construction Professionals. Journal of Construction Engineering and Management, 143(05).
Moon, S, Zekavat, P R and Bernold, L E (2017) Dynamic Quality Control of Process Resource to Improve Concrete Supply Chain. Journal of Construction Engineering and Management, 143(05).
Roofigari-Esfahan, N and Razavi, S (2017) Uncertainty-Aware Linear Schedule Optimization: A Space-Time Constraint-Satisfaction Approach. Journal of Construction Engineering and Management, 143(05).
Saleem, M, Elshami, M M and Najjar, M (2017) Development, Testing, and Implementation Strategy of a Translucent Concrete-Based Smart Lane Separator for Increased Traffic Safety. Journal of Construction Engineering and Management, 143(05).
Shan, Y, Imran, H, Lewis, P and Zhai, D (2017) Investigating the Latent Factors of Quality of Work-Life Affecting Construction Craft Worker Job Satisfaction. Journal of Construction Engineering and Management, 143(05).
Song, M H, Fischer, M and Theis, P (2017) Field Study on the Connection between BIM and Daily Work Orders. Journal of Construction Engineering and Management, 143(05).
Toh, Y Z, Goh, Y M and Guo, B H W (2017) Knowledge, Attitude, and Practice of Design for Safety: Multiple Stakeholders in the Singapore Construction Industry. Journal of Construction Engineering and Management, 143(05).
Whang, S, Flanagan, R, Kim, S and Kim, S (2017) Contractor-Led Critical Design Management Factors in High-Rise Building Projects Involving Multinational Design Teams. Journal of Construction Engineering and Management, 143(05).
Xie, W, Zhao, T, Wang, H and Tang, J (2017) Construction Techniques Used to Automatically Pass Standard Box Girders through Special Passenger-Line Tunnels. Journal of Construction Engineering and Management, 143(05).