Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 11 results ...
Choi, K, Lee, H W, Bae, J and Bilbo, D (2016) Time-Cost Performance Effect of Change Orders from Accelerated Contract Provisions. Journal of Construction Engineering and Management, 142(03).
Farnsworth, C B, Warr, R O, Weidman, J E and Mark Hutchings, D (2016) Effects of CM/GC Project Delivery on Managing Process Risk in Transportation Construction. Journal of Construction Engineering and Management, 142(03).
Klanšek, U (2016) Mixed-Integer Nonlinear Programming Model for Nonlinear Discrete Optimization of Project Schedules under Restricted Costs. Journal of Construction Engineering and Management, 142(03).
Lee, K, Han, S H, Park, H and David Jeong, H (2016) Empirical Analysis of Host-Country Effects in the International Construction Market: An Industry-Level Approach. Journal of Construction Engineering and Management, 142(03).
Lee, S and Yu, J (2016) Comparative Study of BIM Acceptance between Korea and the United States. Journal of Construction Engineering and Management, 142(03).
Li, T H Y, Thomas Ng, S and Skitmore, M (2016) Modeling Multi-Stakeholder Multi-Objective Decisions during Public Participation in Major Infrastructure and Construction Projects: A Decision Rule Approach. Journal of Construction Engineering and Management, 142(03).
Moon, S, Choi, E and Hong, S (2016) Creation of Robust Design Alternatives for Temporary Construction in Value Engineering. Journal of Construction Engineering and Management, 142(03).
Pawan, P and Lorterapong, P (2016) A Fuzzy-Based Integrated Framework for Assessing Time Contingency in Construction Projects. Journal of Construction Engineering and Management, 142(03).
Sonmez, R, Iranagh, M A and Uysal, F (2016) Critical Sequence Crashing Heuristic for Resource-Constrained Discrete Time–Cost Trade-Off Problem. Journal of Construction Engineering and Management, 142(03).
Zhang, L and El-Gohary, N M (2016) Epistemology-Based Context-Aware Semantic Model for Sustainable Construction Practices. Journal of Construction Engineering and Management, 142(03).
Zhang, L, Cheng, J and Fan, W (2016) Party Selection for Integrated Project Delivery Based on Interorganizational Transactive Memory System. Journal of Construction Engineering and Management, 142(03).