Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 11 results ...
Albert, A, Hallowell, M R, Kleiner, B, Chen, A and Golparvar-Fard, M (2014) Enhancing Construction Hazard Recognition with High-Fidelity Augmented Virtuality. Journal of Construction Engineering and Management, 140(07).
Azambuja, M M, Ponticelli, S and O’Brien, W J (2014) Strategic procurement practices for the industrial supply chain. Journal of Construction Engineering and Management, 140(07), 06014005.
Choudhry, R M, Aslam, M A, Hinze, J W and Arain, F M (2014) Cost and Schedule Risk Analysis of Bridge Construction in Pakistan: Establishing Risk Guidelines. Journal of Construction Engineering and Management, 140(07).
Doloi, H (2014) Rationalizing the Implementation of Web-Based Project Management Systems in Construction Projects Using PLS-SEM. Journal of Construction Engineering and Management, 140(07).
Edwards, D J and Holt, G D (2014) Antecedents of Health and Safety Issues Relating to Plant Trailer Wheels. Journal of Construction Engineering and Management, 140(07).
Jin, R, Han, S, Hyun, C and Kim, J (2014) Improving Accuracy of Early Stage Cost Estimation by Revising Categorical Variables in a Case-Based Reasoning Model. Journal of Construction Engineering and Management, 140(07).
Kim, B and Kim, H (2014) Sensitivity of Earned Value Schedule Forecasting to S-Curve Patterns. Journal of Construction Engineering and Management, 140(07).
Nguyen, L D, Nguyen, T K N, Tran, D Q and Villiers, C (2014) Productivity in Daytime and Nighttime Construction of Urban Sewer Systems. Journal of Construction Engineering and Management, 140(07).
Sing, C P, Love, P E D, Fung, I W H and Edwards, D J (2014) Personality and Occupational Accidents: Bar Benders in Guangdong Province, Shenzhen, China. Journal of Construction Engineering and Management, 140(07).
Su, X and Cai, H (2014) Life Cycle Approach to Construction Workspace Modeling and Planning. Journal of Construction Engineering and Management, 140(07).
Tang, Y, Liu, R and Sun, Q (2014) Two-Stage Scheduling Model for Resource Leveling of Linear Projects. Journal of Construction Engineering and Management, 140(07).