Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 12 results ...
Anastasopoulos, P C, Haddock, J E and Peeta, S (2014) Cost Overrun in Public-Private Partnerships: Toward Sustainable Highway Maintenance and Rehabilitation. Journal of Construction Engineering and Management, 140(06).
Becker, T C, Jaselskis, E J and El-Gafy, M (2014) Improving Predictability of Construction Project Outcomes through Intentional Management of Indirect Construction Costs. Journal of Construction Engineering and Management, 140(06).
Chen, Y Q, Zhang, Y B and Zhang, S J (2014) Impacts of Different Types of Owner-Contractor Conflict on Cost Performance in Construction Projects. Journal of Construction Engineering and Management, 140(06).
El-Abbasy, M S, Senouci, A, Zayed, T, Mirahadi, F and Parvizsedghy, L (2014) Condition Prediction Models for Oil and Gas Pipelines Using Regression Analysis. Journal of Construction Engineering and Management, 140(06).
Hawas, F and Cifuentes, A (2014) Valuation of Projects with Stochastic Cash Flows and Intertemporal Correlations: Practical Modeling Guidelines. Journal of Construction Engineering and Management, 140(06).
Ko, C and Chung, N (2014) Lean Design Process. Journal of Construction Engineering and Management, 140(06).
Lee, H W, Choi, K and Gambatese, J A (2014) Real Options Valuation of Phased Investments in Commercial Energy Retrofits under Building Performance Risks. Journal of Construction Engineering and Management, 140(06).
Maghrebi, M, Travis Waller, S and Sammut, C (2014) Assessing the Accuracy of Expert-Based Decisions in Dispatching Ready Mixed Concrete. Journal of Construction Engineering and Management, 140(06).
O’Connor, J T, O’Brien, W J and Choi, J O (2014) Critical Success Factors and Enablers for Optimum and Maximum Industrial Modularization. Journal of Construction Engineering and Management, 140(06).
Russell, M M, Hsiang, S M, Liu, M and Wambeke, B (2014) Causes of Time Buffer and Duration Variation in Construction Project Tasks: Comparison of Perception to Reality. Journal of Construction Engineering and Management, 140(06).
West, J (2014) Collaborative Patterns and Power Imbalance in Strategic Alliance Networks. Journal of Construction Engineering and Management, 140(06).
Zhang, S, Migliaccio, G C, Zandbergen, P A and Guindani, M (2014) Empirical Assessment of Geographically Based Surface Interpolation Methods for Adjusting Construction Cost Estimates by Project Location. Journal of Construction Engineering and Management, 140(06).