Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 11 results ...
Alroomi, A, Jeong, D H S and Oberlender, G D (2012) Analysis of Cost-Estimating Competencies Using Criticality Matrix and Factor Analysis. Journal of Construction Engineering and Management, 138(11), 1270–80.
Chotibhongs, R and Arditi, D (2012) Detection of Collusive Behavior. Journal of Construction Engineering and Management, 138(11), 1251–8.
De Marco, A, Mangano, G, Corinna Cagliano, A and Grimaldi, S (2012) Public Financing into Build-Operate-Transfer Hospital Projects in Italy. Journal of Construction Engineering and Management, 138(11), 1294–302.
Hwang, S, Park, M, Lee, H and Kim, H (2012) Automated Time-Series Cost Forecasting System for Construction Materials. Journal of Construction Engineering and Management, 138(11), 1259–69.
Kim, B, Lee, H, Park, H and Kim, H (2012) Framework for Estimating Greenhouse Gas Emissions Due to Asphalt Pavement Construction. Journal of Construction Engineering and Management, 138(11), 1312–21.
Lee, G and Kim, S (2012) Case Study of Mass Customization of Double-Curved Metal Façade Panels Using a New Hybrid Sheet Metal Processing Technique. Journal of Construction Engineering and Management, 138(11), 1322–30.
Pan, W, Dainty, A R J and Gibb, A G F (2012) Establishing and Weighting Decision Criteria for Building System Selection in Housing Construction. Journal of Construction Engineering and Management, 138(11), 1239–50.
Pan, W, Gibb, A G F and Dainty, A R J (2012) Strategies for Integrating the Use of Off-Site Production Technologies in House Building. Journal of Construction Engineering and Management, 138(11), 1331–40.
Shapira, A, Simcha, M and Goldenberg, M (2012) Integrative Model for Quantitative Evaluation of Safety on Construction Sites with Tower Cranes. Journal of Construction Engineering and Management, 138(11), 1281–93.
Xiang, P, Zhou, J, Zhou, X and Ye, K (2012) Construction Project Risk Management Based on the View of Asymmetric Information. Journal of Construction Engineering and Management, 138(11), 1303–11.
Zhang, L and Qi, J (2012) Controlling Path and Controlling Segment Analysis in Repetitive Scheduling Method. Journal of Construction Engineering and Management, 138(11), 1341–5.