Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 12 results ...
Alarcón, L F, Rodríguez, A and Mourgues, C (2012) Impact of Machine-Failure Costs on Equipment Replacement Policies: Tunneling Company Case Study. Journal of Construction Engineering and Management, 138(06), 767–74.
Deshpande, A S, Salem, O M and Miller, R A (2012) Analysis of the Higher-Order Partial Correlation between CII Best Practices and Performance of the Design Phase in Fast-Track Industrial Projects. Journal of Construction Engineering and Management, 138(06), 716–24.
Hegazy, T and Menesi, W (2012) Heuristic Method for Satisfying Both Deadlines and Resource Constraints. Journal of Construction Engineering and Management, 138(06), 688–96.
Koo, K and Park, S (2012) GA-Based Fuel-Efficient Transfer Path Selection Model for Delivering Construction Materials. Journal of Construction Engineering and Management, 138(06), 725–32.
Oates, D and Sullivan, K T (2012) Postoccupancy Energy Consumption Survey of Arizona’s LEED New Construction Population. Journal of Construction Engineering and Management, 138(06), 742–50.
Petroutsatou, K, Georgopoulos, E, Lambropoulos, S and Pantouvakis, J P (2012) Early Cost Estimating of Road Tunnel Construction Using Neural Networks. Journal of Construction Engineering and Management, 138(06), 679–87.
Ranasinghe, U, Ruwanpura, J and Liu, X (2012) Streamlining the Construction Productivity Improvement Process with the Proposed Role of a Construction Productivity Improvement Officer. Journal of Construction Engineering and Management, 138(06), 697–706.
San Cristóbal, J R (2012) Contractor Selection Using Multicriteria Decision-Making Methods. Journal of Construction Engineering and Management, 138(06), 751–8.
Sing, C, Love, P E D and Tam, C M (2012) Stock-Flow Model for Forecasting Labor Supply. Journal of Construction Engineering and Management, 138(06), 707–15.
Tatari, O and Kucukvar, M (2012) Eco-Efficiency of Construction Materials: Data Envelopment Analysis. Journal of Construction Engineering and Management, 138(06), 733–41.
Wang, C, Liu, M, Hsiang, S M and Leming, M L (2012) Causes and Penalties of Variation: Case Study of a Precast Concrete Slab Production Facility. Journal of Construction Engineering and Management, 138(06), 775–85.
Xie, H, AbouRizk, S and Zou, J (2012) Quantitative Method for Updating Cost Contingency throughout Project Execution. Journal of Construction Engineering and Management, 138(06), 759–66.