Bayraktar, M E, Hastak, M, Gokhale, S and Safi, B (2011) Decision Tool for Selecting the Optimal Techniques for Cost and Schedule Reduction in Capital Projects. Journal of Construction Engineering and Management, 137(09), 645–55.
Commuri, S, Mai, A T and Zaman, M (2011) Neural Network–Based Intelligent Compaction Analyzer for Estimating Compaction Quality of Hot Asphalt Mixes. Journal of Construction Engineering and Management, 137(09), 634–44.
Dai, J and Goodrum, P M (2011) Differences in Perspectives regarding Labor Productivity between Spanish- and English-Speaking Craft Workers. Journal of Construction Engineering and Management, 137(09), 689–97.
González, V, Alarcón, L F, Maturana, S and Bustamante, J A (2011) Site Management of Work-in-Process Buffers to Enhance Project Performance Using the Reliable Commitment Model: Case Study. Journal of Construction Engineering and Management, 137(09), 707–15.
Goodrum, P M, Haas, C T, Caldas, C, Zhai, D, Yeiser, J and Homm, D (2011) Model to Predict the Impact of a Technology on Construction Productivity. Journal of Construction Engineering and Management, 137(09), 678–88.
Hwang, S (2011) Time Series Models for Forecasting Construction Costs Using Time Series Indexes. Journal of Construction Engineering and Management, 137(09), 656–62.
Lin, G, Shen, G Q, Sun, M and Kelly, J (2011) Identification of Key Performance Indicators for Measuring the Performance of Value Management Studies in Construction. Journal of Construction Engineering and Management, 137(09), 698–706.
Wambeke, B W, Hsiang, S M and Liu, M (2011) Causes of Variation in Construction Project Task Starting Times and Duration. Journal of Construction Engineering and Management, 137(09), 663–77.