Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 7 results ...
Duffy, G A, Oberlender, G D and Seok Jeong, D H (2011) Linear Scheduling Model with Varying Production Rates. Journal of Construction Engineering and Management, 137(08), 574–82.
Elbarkouky, M M G and Robinson Fayek, A (2011) Fuzzy Preference Relations Consensus Approach to Reduce Conflicts on Shared Responsibilities in the Owner Managing Contractor Delivery System. Journal of Construction Engineering and Management, 137(08), 609–18.
Hallowell, M R (2011) Risk-Based Framework for Safety Investment in Construction Organizations. Journal of Construction Engineering and Management, 137(08), 592–9.
Hashemi, H, Mousavi, S M and Mojtahedi, S M H (2011) Bootstrap Technique for Risk Analysis with Interval Numbers in Bridge Construction Projects. Journal of Construction Engineering and Management, 137(08), 600–8.
Son, J and Rojas, E M (2011) Evolution of Collaboration in Temporary Project Teams: An Agent-Based Modeling and Simulation Approach. Journal of Construction Engineering and Management, 137(08), 619–28.
Wu, J, Kumaraswamy, M M and Soo, G (2011) Regulative Measures Addressing Payment Problems in the Construction Industry: A Calculative Understanding of Their Potential Outcomes Based on Gametric Models. Journal of Construction Engineering and Management, 137(08), 566–73.
Yang, J and Tsai, M (2011) Computerizing ICBF Method for Schedule Delay Analysis. Journal of Construction Engineering and Management, 137(08), 583–91.