Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 11 results ...
Canales, A R, Arbelaez, M, Vasquez, E, Aveiga, F, Strong, K, Walters, R, Jaselskis, E J and Jahren, C T (2009) Exploring Training Needs and Development of Construction Language Courses for American Supervisors and Hispanic Craft Workers. Journal of Construction Engineering and Management, 135(05), 387–96.
Dai, J, Goodrum, P M, Maloney, W F and Srinivasan, C (2009) Latent Structures of the Factors Affecting Construction Labor Productivity. Journal of Construction Engineering and Management, 135(05), 397–406.
Hegab, M and Smith, G R (2009) Labor Performance Analysis for Microtunneling Projects. Journal of Construction Engineering and Management, 135(05), 432–5.
Hinze, J and Olbina, S (2009) Empirical Analysis of the Learning Curve Principle in Prestressed Concrete Piles. Journal of Construction Engineering and Management, 135(05), 425–31.
Hwang, S (2009) Dynamic Regression Models for Prediction of Construction Costs. Journal of Construction Engineering and Management, 135(05), 360–7.
Jang, W and Skibniewski, M J (2009) Cost-Benefit Analysis of Embedded Sensor System for Construction Materials Tracking. Journal of Construction Engineering and Management, 135(05), 378–86.
Lewis, P, Rasdorf, W, Frey, H C, Pang, S and Kim, K (2009) Requirements and Incentives for Reducing Construction Vehicle Emissions and Comparison of Nonroad Diesel Engine Emissions Data Sources. Journal of Construction Engineering and Management, 135(05), 341–51.
Lucko, G and Peña Orozco, A A (2009) Float Types in Linear Schedule Analysis with Singularity Functions. Journal of Construction Engineering and Management, 135(05), 368–77.
Mao, X, Zhang, X and AbouRizk, S M (2009) Enhancing Value Engineering Process by Incorporating Inventive Problem-Solving Techniques. Journal of Construction Engineering and Management, 135(05), 416–24.
Mitropoulos, P and Cupido, G (2009) Safety as an Emergent Property: Investigation into the Work Practices of High-Reliability Framing Crews. Journal of Construction Engineering and Management, 135(05), 407–15.
Moynihan, G, Zhou, H and Cui, Q (2009) Stochastic Modeling for Pavement Warranty Cost Estimation. Journal of Construction Engineering and Management, 135(05), 352–9.