Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 14 results ...
Ahmed, S M, Sang, L P and Torbica, & M (2003) Use of Quality Function Deployment in Civil Engineering Capital Project Planning. Journal of Construction Engineering and Management, 129(04), 358–68.
Allouche, E N, Ariaratnam, S T and MacLeod, C W (2003) Software for Planning and Cost Control in Directional Drilling Projects. Journal of Construction Engineering and Management, 129(04), 446–53.
Attalla, M and Hegazy, T (2003) Predicting Cost Deviation in Reconstruction Projects: Artificial Neural Networks versus Regression. Journal of Construction Engineering and Management, 129(04), 405–11.
Chan, E H W and Tse, R Y C (2003) Cultural Considerations in International Construction Contracts. Journal of Construction Engineering and Management, 129(04), 375–81.
Chang, A S and Tsai, Y (2003) Engineering Information Classification System. Journal of Construction Engineering and Management, 129(04), 454–60.
Cheng, M and Ko, C (2003) Object-Oriented Evolutionary Fuzzy Neural Inference System for Construction Management. Journal of Construction Engineering and Management, 129(04), 461–9.
Fu, W K, Drew, D S and Lo, H P (2003) Competitiveness of Inexperienced and Experienced Contractors in Bidding. Journal of Construction Engineering and Management, 129(04), 388–95.
Hassim, S, Kadir, M R A, Lew, Y and Sim, Y (2003) Estimation of Minimum Working Capital for Construction Projects in Malaysia. Journal of Construction Engineering and Management, 129(04), 369–74.
Hegazy, T and Petzold, K (2003) Genetic Optimization for Dynamic Project Control. Journal of Construction Engineering and Management, 129(04), 396–404.
Ibbs, C W, Kwak, Y H, Ng, T and Odabasi, A M (2003) Project Delivery Systems and Project Change: Quantitative Analysis. Journal of Construction Engineering and Management, 129(04), 382–7.
Lee, S and Halpin, D W (2003) Predictive Tool for Estimating Accident Risk. Journal of Construction Engineering and Management, 129(04), 431–6.
Lu, M and Li, H (2003) Resource-Activity Critical-Path Method for Construction Planning. Journal of Construction Engineering and Management, 129(04), 412–20.
Navon, R and Goldschmidt, E (2003) Can Labor Inputs be Measured and Controlled Automatically?. Journal of Construction Engineering and Management, 129(04), 437–45.
Warszawski, A (2003) Analysis of Costs and Benefits of Tall Buildings. Journal of Construction Engineering and Management, 129(04), 421–30.