Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 11 results ...
Arditi, D, Elhassan, A and Toklu, Y C (2002) Constructability Analysis in the Design Firm. Journal of Construction Engineering and Management, 128(02), 117–26.
Battikha, M G (2002) QUALICON: Computer-Based System for Construction Quality Management. Journal of Construction Engineering and Management, 128(02), 164–73.
Fredericks, T, Abudayyeh, O, Palmquist, M and Torres, H N (2002) Mechanical Contracting Safety Issues. Journal of Construction Engineering and Management, 128(02), 186–93.
Glagola, C R and Sheedy, W M (2002) Partnering on Defense Contracts. Journal of Construction Engineering and Management, 128(02), 127–38.
Gomar, J E, Haas, C T and Morton, D P (2002) Assignment and Allocation Optimization of Partially Multiskilled Workforce. Journal of Construction Engineering and Management, 128(02), 103–9.
Hajjar, D and AbouRizk, S M (2002) Unified Modeling Methodology for Construction Simulation. Journal of Construction Engineering and Management, 128(02), 174–85.
Kumaraswamy, M M and Morris, D A (2002) Build-Operate-Transfer-Type Procurement in Asian Megaprojects. Journal of Construction Engineering and Management, 128(02), 93–102.
Kwak, Y H (2002) Analyzing Asian Infrastructure Development Privatization Market. Journal of Construction Engineering and Management, 128(02), 110–6.
Que, B C (2002) Incorporating Practicability into Genetic Algorithm-Based Time-Cost Optimization. Journal of Construction Engineering and Management, 128(02), 139–43.
Thomas, H R, Horman, M J, de Souza, U E L and ZavÅ™ski, I (2002) Reducing variability to improve performance as a lean construction principle. Journal of Construction Engineering and Management, 128(02), 144–54.
Zhang, X Q, Kumaraswamy, M M, Zheng, W and Palaneeswaran, E (2002) Concessionaire Selection for Build-Operate-Transfer Tunnel Projects in Hong Kong. Journal of Construction Engineering and Management, 128(02), 155–63.