Akpan, E O P and Igwe, O (2001) Methodology for Determining Price Variation in Project Execution. Journal of Construction Engineering and Management, 127(05), 367–73.
Chevallier, N J and Russell, A D (2001) Developing a Draft Schedule Using Templates and Rules. Journal of Construction Engineering and Management, 127(05), 391–8.
El-Diraby, T E and O'Connor, J T (2001) Model for Evaluating Bridge Construction Plans. Journal of Construction Engineering and Management, 127(05), 399–405.
Elinwa, A U and Joshua, M (2001) Time-Overrun Factors in Nigerian Construction Industry. Journal of Construction Engineering and Management, 127(05), 419–25.
Henry, E and Brothers, H S (2001) Cost Analysis between SABER and Design Bid Build Contracting Methods. Journal of Construction Engineering and Management, 127(05), 359–66.
Kang, L S, Park, I C and Lee, B H (2001) Optimal Schedule Planning for Multiple, Repetitive Construction Process. Journal of Construction Engineering and Management, 127(05), 382–90.
Seo, S and Hwang, Y (2001) . Journal of Construction Engineering and Management, 127(05), 414–8.
Thorpe, T and Mead, S (2001) Project-Specific Web Sites: Friend or Foe?. Journal of Construction Engineering and Management, 127(05), 406–13.
Yamín, R A and Harmelink, D J (2001) Comparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM). Journal of Construction Engineering and Management, 127(05), 374–81.
Zhang, X Q and Kumaraswamy, M M (2001) Procurement Protocols for Public-Private Partnered Projects. Journal of Construction Engineering and Management, 127(05), 351–8.