Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 11 results ...
Cheng, M and Yang, S (2001) GIS-Based Cost Estimates Integrating with Material Layout Planning. Journal of Construction Engineering and Management, 127(04), 291–9.
El-Rayes, K (2001) Optimum Planning of Highway Construction under A + B Bidding Method. Journal of Construction Engineering and Management, 127(04), 261–9.
Han, S H and Diekmann, J E (2001) Approaches for Making Risk-Based Go/No-Go Decision for International Projects. Journal of Construction Engineering and Management, 127(04), 300–8.
Harmelink, D J (2001) Linear Scheduling Model: Float Characteristics. Journal of Construction Engineering and Management, 127(04), 255–60.
Hegazy, T, Zaneldin, E and Grierson, D (2001) Improving Design Coordination for Building Projects. I: Information Model. Journal of Construction Engineering and Management, 127(04), 322–9.
Jergeas, G and Put, J V d (2001) Benefits of Constructability on Construction Projects. Journal of Construction Engineering and Management, 127(04), 281–90.
Kululanga, G K, Kuotcha, W, McCaffer, R and Edum-Fotwe, F (2001) Construction Contractors' Claim Process Framework. Journal of Construction Engineering and Management, 127(04), 309–14.
Leu, S and Hwang, S (2001) Optimal Repetitive Scheduling Model with Shareable Resource Constraint. Journal of Construction Engineering and Management, 127(04), 270–80.
Suraji, A, Duff, A R and Peckitt, S J (2001) Development of Causal Model of Construction Accident Causation. Journal of Construction Engineering and Management, 127(04), 337–44.
Tam, C M, Tong, T K L and Chan, W K W (2001) Genetic Algorithm for Optimizing Supply Locations around Tower Crane. Journal of Construction Engineering and Management, 127(04), 315–21.
Zaneldin, E, Hegazy, T and Grierson, D (2001) Improving Design Coordination for Building Projects. II: A Collaborative System. Journal of Construction Engineering and Management, 127(04), 330–6.