Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 10 results ...
Bernold, L E, Lorenc, S J and Davis, M L (2001) Technological Intervention to Eliminate Back Injury Risks for Nailing. Journal of Construction Engineering and Management, 127(03), 245–50.
Chang, L and Chen, P (2001) BOT Financial Model: Taiwan High Speed Rail Case. Journal of Construction Engineering and Management, 127(03), 214–22.
El-Rayes, K (2001) Object-Oriented Model for Repetitive Construction Scheduling. Journal of Construction Engineering and Management, 127(03), 199–205.
El-Razek, M E A and Basha, I M (2001) Constructability Improvement of Bridges Using Stepping Formwork. Journal of Construction Engineering and Management, 127(03), 206–13.
Hegazy, T and Wassef, N (2001) Cost Optimization in Projects with Repetitive Nonserial Activities. Journal of Construction Engineering and Management, 127(03), 183–91.
Hiyassat, M A S (2001) Applying Modified Minimum Moment Method to Multiple Resource Leveling. Journal of Construction Engineering and Management, 127(03), 192–8.
Kangari, R and Bakheet, M (2001) Construction Surety Bonding. Journal of Construction Engineering and Management, 127(03), 232–8.
Mitropoulos, P and Howell, G (2001) Model for Understanding, Preventing, and Resolving Project Disputes. Journal of Construction Engineering and Management, 127(03), 223–31.
Moua, B and Russell, J S (2001) Comparison of Two Maintainability Programs. Journal of Construction Engineering and Management, 127(03), 239–44.
Oberlender, G D and Trost, S M (2001) Predicting Accuracy of Early Cost Estimates Based on Estimate Quality. Journal of Construction Engineering and Management, 127(03), 173–82.