Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 11 results ...
Adeli, H and Wu, M (1998) Regularization Neural Network for Construction Cost Estimation. Journal of Construction Engineering and Management, 124(01), 18–24.
Ballard, G and Howell, G (1998) Shielding Production: Essential Step in Production Control. Journal of Construction Engineering and Management, 124(01), 11–17.
Fayek, A (1998) Competitive Bidding Strategy Model and Software System for Bid Preparation. Journal of Construction Engineering and Management, 124(01), 1–10.
Hinze, J, Pedersen, C and Fredley, J (1998) Identifying Root Causes of Construction Injuries. Journal of Construction Engineering and Management, 124(01), 67–71.
Minato, T and Ashley, D B (1998) Data-Driven Analysis of “Corporate Risk” Using Historical Cost-Control Data. Journal of Construction Engineering and Management, 124(01), 42–47.
Ohrn, L G and Schexnayder, C (1998) Performance-Related Specifications for Highway Construction. Journal of Construction Engineering and Management, 124(01), 25–30.
Saad, I M H and Hancher, D E (1998) Multimedia for Construction Project Management: Project Navigator. Journal of Construction Engineering and Management, 124(01), 82–89.
Senior, B A and Halpin, D W (1998) Simplified Simulation System for Construction Projects. Journal of Construction Engineering and Management, 124(01), 72–81.
Sinfield, J V and Einstein, H H (1998) Tunnel Construction Costs for Tube Transportation Systems. Journal of Construction Engineering and Management, 124(01), 48–57.
Thomas, S R, Tucker, R L and Kelly, W R (1998) Critical Communications Variables. Journal of Construction Engineering and Management, 124(01), 58–66.
Warszawski, A and Navon, R (1998) Implementation of Robotics in Building: Current Status and Future Prospects. Journal of Construction Engineering and Management, 124(01), 31–41.