ARCOM Conference Paper Abstracts Database:
Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 70 results ...
Adegun, O B (2023) Climatic disasters within a flood-prone coastal slum in Lagos: coping capacities and adaptation prospects. International Journal of Disaster Resilience in the Built Environment, 14(02), 212-28.
Aje, O I, Odusami, K T and Ogunsemi, D R (2009) The impact of contractors' management capability on cost and time performance of construction projects in Nigeria. Journal of Financial Management of Property and Construction, 14(02), 171–87.
Alaghbari, M W, Kadir, R A and Salim, E A (2007) The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(02), 192–206.
Aliu, J, Oke, A E, Abayomi, T, Aigbavboa, C and Makanjuola, S (2024) Exploring the critical success factors for adopting gamification in the Nigerian construction sector. Built Environment Project and Asset Management, 14(02), 184-200.
Balamir, M (2023) The “disaster cycle” (DC) and actors in disaster management. International Journal of Disaster Resilience in the Built Environment, 14(02), 185-92.
Bashouri, J and William, D G (2014) A model for sharing knowledge in architectural firms. Construction Innovation, 14(02), 168-85.
Bazen, E (2014) Effect of the Building Act 2011 on compliance costs in Western Australia. Construction Economics and Building, 14(02), 41-56.
Bulsara, M A, Hingu, A D and Vaghasiya, P S (2016) Energy loss due to unbalance in rotor–shaft system. Journal of Engineering, Design and Technology, 14(02), 277-85.
Chen, J J (1996) The impact of public construction investment upon special economic zones: the Chinese experience. Construction Management and Economics, 14(02), 175-82.
Chen, Y, Dib, H and Cox, R F (2014) A measurement model of building information modelling maturity. Construction Innovation, 14(02), 186-209.
Dow, I, Sertyesilisik, B and Ross, A D (2009) An investigation on the cost implications of methodology of sub-contract work pricing. Journal of Financial Management of Property and Construction, 14(02), 98–125.
El Debs, L C, Brunese, P S and Shaurette, M (2018) Use of concept maps to illustrate barriers to construction industry inter-organizational communication: A comparative view from students and professionals. International Journal of Construction Education and Research, 14(02), 77-94.
El-Sabek, L M and McCabe, B Y (2018) Coordination challenges of production planning in the construction of international mega-projects in the Middle East. International Journal of Construction Education and Research, 14(02), 118-40.
Enshassi, A, Al-Najjar, J and Kumaraswamy, M (2009) Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(02), 126–51.
Fernando, M H V, Costa, D D, Malsha Nadeetharu, B K and Kulatunga, U (2024) Application of lean principles for building refurbishment projects in Sri Lanka. Built Environment Project and Asset Management, 14(02), 244-59.
Finch, E F, Flanagan, R and Marsh, L (1996) Auto-ID application in construction. Construction Management and Economics, 14(02), 121-9.
Glass, J and Simmonds, M (2007) “Considerate construction”: case studies of current practice. Engineering, Construction and Architectural Management, 14(02), 131–49.
Green, S D (1996) A metaphorical analysis of client organizations and the briefing process. Construction Management and Economics, 14(02), 155-64.
Hallal, I and Sahnoune, T (2023) Urban mix in housing neighbourhoods: challenges, evaluation method and diagnosis of Ayouf in Jijel, Algeria. International Journal of Disaster Resilience in the Built Environment, 14(02), 229-48.
Haupt, T C and Pillay, K (2016) Investigating the true costs of construction accidents. Journal of Engineering, Design and Technology, 14(02), 373-419.
Huang, J-Y and Siao, S-T (2016) Development of an integrated bionic design system. Journal of Engineering, Design and Technology, 14(02), 310-27.
Huang, W, Xu, J, Zhu, D, Liu, C, Lu, J and Lu, K (2016) Multi-objective optimization of composite two-stage vibration isolation system for sensitive equipment. Journal of Engineering, Design and Technology, 14(02), 343-61.
Hughes, R and Thorpe, D (2014) A review of enabling factors in construction industry productivity in an Australian environment. Construction Innovation, 14(02), 210-28.
Ikediashi, D I and Ogwueleka, A C (2016) Assessing the use of ICT systems and their impact on construction project performance in the Nigerian construction industry. Journal of Engineering, Design and Technology, 14(02), 252-76.
Jaafar, M, Nuruddin, A and Abu Bakar, S P (2014) Business success and psychological traits of housing developers. Construction Economics and Building, 14(02), 57-72.
Jaafar, M, Ramayah, T, Abdul-Aziz, A-R and Saad, B (2007) Technology readiness among managers of Malaysian construction firms. Engineering, Construction and Architectural Management, 14(02), 180–91.
Jiang, H and Liu, C (2014) Spatial linkages among Australian construction markets. Construction Economics and Building, 14(02), 18-30.
Jiang, H, Xu, Y and Liu, C (2014) Market effects on forecasting construction prices using vector error correction models. International Journal of Construction Management, 14(02), 101-12.
Kakitahi, J M, Alinaitwe, H M, Landin, A and Mone, S J (2016) Impact of construction-related rework on selected Ugandan public projects. Journal of Engineering, Design and Technology, 14(02), 238-51.
Kaur, P, Ritu, R K and Kaur, A (2024) Unraveling consumer behavioral intentions to adopt solar water heaters in India using UTAUT model. Built Environment Project and Asset Management, 14(02), 312-28.
Ke, Y (2014) Is public-private partnership a panacea for infrastructure development? The case of Beijing national stadium. International Journal of Construction Management, 14(02), 90-100.
Ke, Y, Zhao, X, Wang, Y and Wang, S (2009) SWOT analysis of domestic private enterprises in developing infrastructure projects in China. Journal of Financial Management of Property and Construction, 14(02), 152–70.
Kometa, S T, Olomolaiye, P O and Harris, F C (1996) Validation of the model for evaluating client-generated risk by project consultants. Construction Management and Economics, 14(02), 131-45.
Laitinen, K, Luhtala, M, Örmä, M and Vaismaa, K (2024) Productivity development enablers in the infrastructure sector: capability maturity model integration approach. Built Environment Project and Asset Management, 14(02), 201-27.
Lambropoulos, J, Manolopoulos, N and Pantouvakis, J P (1996) SEMANTIC: smart earth moving analysis and estimation of cost. Construction Management and Economics, 14(02), 79-92.
Lê, M A T and Brønn, C (2007) Linking experience and learning: application to multi-project building environments. Engineering, Construction and Architectural Management, 14(02), 150–63.
Lebunu Hewage, U W A, Wadu Mesthrige, J and Too, E G (2024) Barriers to risk management in small construction projects in Sri Lanka. Built Environment Project and Asset Management, 14(02), 296-311.
Ling, F Y Y and Hien, M B T (2014) Boosting project outcomes through goal alignment: a case study of Vietnam. Construction Economics and Building, 14(02), 73-86.
MacSporran, C and Tucker, S N (1996) Target budget levels for building operating costs. Construction Management and Economics, 14(02), 103-19.
Madhlopa, A (2016) Effect of controlling airflow in a solar chimney on thermal load in a built environment. Journal of Engineering, Design and Technology, 14(02), 286-309.
Mohammed, A A and Abdul-Rahman, H (2014) Aspects of project learning in construction: A socio-technical model. Construction Innovation, 14(02), 229-44.
Moradpour, N, Pourahmad, A, Hataminejad, H, Ziari, K and Sharifi, A (2023) An overview of the state of urban resilience in Iran. International Journal of Disaster Resilience in the Built Environment, 14(02), 154-84.
Nguyen, T, Chileshe, N, Ho, D T, Nguyen, V T and Tran, Q P (2024) Significant risks that trigger cost overruns and delays in urban rail projects: a typical case study of Vietnam. Built Environment Project and Asset Management, 14(02), 278-95.
Oyewobi, L O, Abiola-Falemu, O and Ibironke, O T (2016) The impact of rework and organisational culture on project delivery. Journal of Engineering, Design and Technology, 14(02), 214-37.
Rameezdeen, R and Rodrigo, A (2014) Modifications to standard forms of contract: the impact on readability. Construction Economics and Building, 14(02), 31-40.
Ranasinghe, M (1996) Mine restoration bond for clay mining and its impact on the prices of building materials in Sri Lanka. Construction Management and Economics, 14(02), 165-74.
Saad, A M, Dulaimi, M, Arogundade, S, Zulu, S L and Gorse, C (2024) Modern methods of construction (MMC) and innovation negativism in the UK public sector. Built Environment Project and Asset Management, 14(02), 147-63.
Sadeghi, J, Oghabi, M, Sarvari, H, Sabeti, M S, Kashefi, H, Chan, D W M and Lotfata, A (2023) A hybrid risk assessment approach for assessing the earthquake risks in worn-out urban fabrics: a case study in Iran. International Journal of Disaster Resilience in the Built Environment, 14(02), 193-211.
Safougne Djomekui, B L and Yemmafouo, A (2023) Population resilience to flooding in the urbanised mangrove of Douala, Cameroon. International Journal of Disaster Resilience in the Built Environment, 14(02), 135-53.
Shafabakhsh, G A, Kashi, E and Akbari, A (2016) A comparison effect of aircraft main gear configuration on runway damages by LED and FE method. Journal of Engineering, Design and Technology, 14(02), 362-72.
Shoesmith, D R (1996) A study of the management and procurement of building services work. Construction Management and Economics, 14(02), 93-101.
Siew, R Y J (2014) Human resource management in the construction industry – Sustainability competencies. Construction Economics and Building, 14(02), 87-103.
Singh, A K and Kumar, V R P (2024) Analyzing the barriers for blockchain-enabled BIM adoption in facility management using best-worst method approach. Built Environment Project and Asset Management, 14(02), 164-83.
Sommerville, J (1996) An analysis of recruitment sources and employee turnover in Scottish construction organizations. Construction Management and Economics, 14(02), 147-54.
Sruthilaya, D, Vilventhan, A and Gopal, P R C (2024) Analysis of project complexity factors and their interdependencies in metro rail projects. Built Environment Project and Asset Management, 14(02), 260-77.
Stringfellow, P (2014) Construction contractors’ involvement in disaster management planning. Construction Economics and Building, 14(02), 120-132.
Sunding, L and Ekholm, A (2014) Problems and problem attention in the construction sector – understanding the influence of human factors. Construction Economics and Building, 14(02), 1-17.
Sutrisna, M and Barrett, P (2007) Applying rich picture diagrams to model case studies of construction projects. Engineering, Construction and Architectural Management, 14(02), 164–79.
Sutton, K, Williams, A, Tremain, D and Kilgour, P (2016) University entry score: Is it a consideration for spatial performance in architecture design students?. Journal of Engineering, Design and Technology, 14(02), 328-42.
Swan, W and Khalfan, M M A (2007) Mutual objective setting for partnering projects in the public sector. Engineering, Construction and Architectural Management, 14(02), 119–30.
Sweis, R J, Al Sharef, R, Jandali, D, Obeidat, B Y and Andrawes, N (2018) The relationship between project team members' effectiveness and acknowledgment of talent: Team members' perspective. International Journal of Construction Education and Research, 14(02), 141-60.
- Type: Journal Article
- Keywords: team effectiveness; communication; satisfaction; talent acknowledgment; building projects; human resource management
- ISBN/ISSN: 1557-8771
- URL: https://doi.org/10.1080/15578771.2017.1356401
- Abstract:
The aim of this research is to investigate the relationship between the acknowledgment of team member's talents and his/her effectiveness in construction projects. Talents were investigated in terms of ability, aspiration, and engagement dimensions while effectiveness was measured by both, the satisfaction and the communication dimensions. The data were collected by distributing questionnaires on the contracting companies who are executing large building construction. Multiple linear regression was used to test the main hypothesis. The results showed a statistically significant relation between acknowledgment of a team member's talent and his/her effectiveness in performing their day-to-day tasks. The results of this research may serve as a motive for top management to lead their organization toward the adoption of talent management concept in which a clear definition of desired talents is required and a road map to talent acknowledgment is provided.;The aim of this research is to investigate the relationship between the acknowledgment of team member's talents and his/her effectiveness in construction projects. Talents were investigated in terms of ability, aspiration, and engagement dimensions while effectiveness was measured by both, the satisfaction and the communication dimensions. The data were collected by distributing questionnaires on the contracting companies who are executing large building construction. Multiple linear regression was used to test the main hypothesis. The results showed a statistically significant relation between acknowledgment of a team member's talent and his/her effectiveness in performing their day-to-day tasks. The results of this research may serve as a motive for top management to lead their organization toward the adoption of talent management concept in which a clear definition of desired talents is required and a road map to talent acknowledgment is provided.;
Talley, K G and Torres, A S (2018) Measuring the impact of using daily objectives to provide rapid feedback in construction courses. International Journal of Construction Education and Research, 14(02), 95-117.
Tam, V W Y and Hao, J J L (2014) Prefabrication as a mean of minimizing construction waste on site. International Journal of Construction Management, 14(02), 113-21.
Teriö, O, Sorri, J, Kähkönen, K and Hämäläinen, J (2014) Environmental index for Finnish construction sites. Construction Innovation, 14(02), 245-62.
Teriö, O, Sorri, J, Kähkönen, K and Hämäläinen, J (2014) Environmental index for Finnish construction sites. Construction Innovation, 14(02), 245-62.
Turkan, Y, Bosché, F, Haas, C T and Haas, R (2014) Tracking of secondary and temporary objects in structural concrete work. Construction Innovation, 14(02), 145-67.
Wibowo, A (2024) Ex ante required rates of return and related factors in Indonesian PPP infrastructure projects. Built Environment Project and Asset Management, 14(02), 228-43.
Yao, H and Hao, J L (2014) Simulation model for identifying effective policy in mitigating noise emissions from highway projects. International Journal of Construction Management, 14(02), 67-77.
Yusuf, G A and Mohamed, S F (2014) Perceived benefits of adopting a standard–based pricing mechanism for mechanical and electrical services installations. Construction Economics and Building, 14(02), 104-119.
Zeng, S, Chung, F and Ashuri, B (2024) Forecasting Right-of-Way (ROW) acquisition timeline of transportation projects. Built Environment Project and Asset Management, 14(02), 129-46.