Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Aboseif, E and Hanna, A S (2024) Benchmarking of construction projects performance for comparative assessment and performance improvement: a statistical quantitative approach. Engineering, Construction and Architectural Management, 31(07), 2829-51.

Al-Hadidi, S, Sweis, G, Abu-Khader, W, Abu-Rumman, G and Sweis, R (2024) Managing future urbanization growth patterns using genetic algorithm modeling. Engineering, Construction and Architectural Management, 31(07), 2648-68.

Delgado-Hernández, D J and Palacios-Navarro, U J (2024) A Bayesian network for selecting improvement management tools to increase customer satisfaction in the construction industry: case study of Mexico. Engineering, Construction and Architectural Management, 31(07), 2900-15.

Gibson, G E, El Asmar, M, Yussef, A and Ramsey, D (2024) A novel approach for measuring the accuracy of front end engineering design. Engineering, Construction and Architectural Management, 31(07), 2669-96.

Guo, J, Xiang, P, Liu, Q and Luo, Y (2024) Transportation infrastructure network optimisation based on computer simulation using Sichuan Province, China as an example. Engineering, Construction and Architectural Management, 31(07), 2740-69.

Khan, S, Panuwatwanich, K and Usanavasin, S (2024) Integrating building information modeling with augmented reality: application and empirical assessment in building facility management. Engineering, Construction and Architectural Management, 31(07), 2809-28.

Khanapure, V U and Shastri, S S (2024) A sustainable–lean implementation methodology: a catalyst for sustainability enhancement of high-rise residential projects. Engineering, Construction and Architectural Management, 31(07), 2585-603.

Kum, Y T, Yap, J B H, Lew, Y L and Lee, W P (2024) Transforming construction health and safety management during COVID-19 pandemic using innovative technologies: PLS-SEM approach. Engineering, Construction and Architectural Management, 31(07), 2770-808.

Lad, V H, Patel, D A, Chauhan, K A and Patel, K A (2024) Prioritisation of bridge for improving its resilience using multi-criteria decision-making techniques. Engineering, Construction and Architectural Management, 31(07), 2952-76.

  • Type: Journal Article
  • Keywords: aras; bridge; copras; critic; mcdm; moora; prioritisation; resilience; topsis; vikor; waspas; wpm; wsm
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-11-2021-0997
  • Abstract:
    Purpose: The work on bridge resilience assessment includes quantitative and qualitative approaches to compare the multiple bridges based on their resilience. But still, the bridge resilience obtained by these assessment approaches is inefficient when prioritising multiple bridges to improve their resilience. Therefore, this study aims to develop a methodology for prioritising the bridges to improve their resilience. Design/methodology/approach: The research methodology follows three sequential phases. In the first phase, criteria importance through intercriteria correlation (CRITIC) technique is used to compute the criteria weights. The criteria considered are age, area, design high flood level, finish road level FRL and resilience index of bridges. While 12 river-crossing bridges maintained by one bridge owner are considered as alternatives. Then, in the second phase, the prioritisation of each bridge is evaluated using five techniques, including technique for order of preference by similarity to ideal solution, VIKOR (in Serbian, Visekriterijumska Optimizacija I Kompromisno Resenje), additive ratio assessment, complex proportional assessment and multi-objective optimisation method by ratio analysis. Finally, in the third phase, the results of all five techniques are integrated using CRITIC and the weighted sum method. Findings: The result of the study enables bridge owners to deal with the particular bridge that requires resilience improvement. The study concluded that it is not enough to consider only the bridge resilience index to improve its resilience. The prioritisation exercise should consider various other criteria that are not preferred during the bridge resilience assessment process. Originality/value: The proposed methodology is a novel framework based on the existing multi-criteria decision-making (MCDM) techniques for contributing knowledge in the domain of bridge resilience management. It can efficiently overcome the pitfall of decision-making when two bridges have the same resilience index score. © 2023, Emerald Publishing Limited.

Li, T, Li, Z and Cai, J (2024) Antecedents and consequence of intra-organizational diffusion of prefabricated construction technology: a contingency theory perspective. Engineering, Construction and Architectural Management, 31(07), 2932-51.

Li, X, Chang, C T, Zhu, Y Y and Li, L L (2024) Key influence factors on the evacuation route selection for fire emergencies in urban underground complexes. Engineering, Construction and Architectural Management, 31(07), 2630-47.

Lin, Q, Zhang, C, Cai, H, Li, X and Xiao, H (2024) Urban night lighting evaluation system and case study: blending popular contemporary elements, cultural traditions and advanced lighting technologies. Engineering, Construction and Architectural Management, 31(07), 2916-31.

Lu, Y, Liu, J and Yu, W (2024) Social risk analysis for mega construction projects based on structural equation model and Bayesian network: a risk evolution perspective. Engineering, Construction and Architectural Management, 31(07), 2604-29.

Masood, R, Roy, K, González, V A, Lim, J B P and Nasir, A R (2024) A supply chain perspective of prefabricated housebuilding diffusion in New Zealand. Engineering, Construction and Architectural Management, 31(07), 2697-720.

Tennakoon, G A, Rameezdeen, R and Chileshe, N (2024) Walking the talk towards sustainable consumption: interventions to promote the uptake of reprocessed construction materials. Engineering, Construction and Architectural Management, 31(07), 2878-99.

Wang, Z, Shi, L and Cui, H (2024) Effects of the host-country institutional environment on the operation mode change of international construction enterprises. Engineering, Construction and Architectural Management, 31(07), 2721-39.

Xie, L L, Chen, Y, Wu, S, Chang, R D and Han, Y (2024) Knowledge extraction for solving resource-constrained project scheduling problem through decision tree. Engineering, Construction and Architectural Management, 31(07), 2852-77.

Zhou, X, Wang, Y, Zhang, Y and Liu, F (2024) Macro investigation on China's engineering insurance industry: based on industrial organization theories. Engineering, Construction and Architectural Management, 31(07), 2977-94.