Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 18 results ...

Ajayi, S O, Lister, N, Dauda, J A, Oyegoke, A and Alaka, H (2024) Influencing sub-contracted operatives' attitudes and behaviours towards improved health and safety culture in construction. Engineering, Construction and Architectural Management, 31(06), 2286-305.

Aliu, J, Aghimien, D, Aigbavboa, C, Ebekozien, A, Oke, A E, Adekunle, S A, Akinradewo, O and Akinshipe, O (2024) Developing emotionally competent engineers for the ever-changing built environment. Engineering, Construction and Architectural Management, 31(06), 2248-63.

Ebekozien, A, Aigbavboa, C O, Samsurijan, M S, Adjekophori, B and Nwaole, A N C (2024) Leakages in affordable housing delivery: threat to achieving Sustainable Development Goal 11. Engineering, Construction and Architectural Management, 31(06), 2353-68.

Eze, E C, Aghimien, D O, Aigbavboa, C O and Sofolahan, O (2024) Building information modelling adoption for construction waste reduction in the construction industry of a developing country. Engineering, Construction and Architectural Management, 31(06), 2205-23.

Kukah, A S K, Owusu-Manu, D G, Badu, E and Asamoah, E (2024) Structural equation model (SEM) for evaluating interrelationships among risks inherent in Ghanaian public–private partnership (PPP) power projects. Engineering, Construction and Architectural Management, 31(06), 2327-52.

Le, A T H and Sutrisna, M (2024) Project cost control system and enabling-factors model: PLS-SEM approach and importance-performance map analysis. Engineering, Construction and Architectural Management, 31(06), 2513-35.

Li, L, Chen, C, Martek, I and Li, G (2024) An integrated model for international market and entry mode selections for Chinese contractors. Engineering, Construction and Architectural Management, 31(06), 2457-77.

Lim, M L W, Wong, S Y and Ding, C S (2024) Challenges of industrial revolution 4.0: quantity surveying students' perspectives. Engineering, Construction and Architectural Management, 31(06), 2496-512.

Pham Van, B and Peansupap, V (2024) Confirmatory analysis on factors influencing the material management effectiveness in construction projects. Engineering, Construction and Architectural Management, 31(06), 2536-62.

Qi, X, Du, Q, Zou, P X W and Huang, N (2024) Developing a weighted synergy network–based model for selecting prefabricated construction services. Engineering, Construction and Architectural Management, 31(06), 2306-26.

Tehrani, B M, BuHamdan, S and Alwisy, A (2024) Robotics in industrialized construction: an activity-based ranking system for assembly manufacturing tasks. Engineering, Construction and Architectural Management, 31(06), 2264-85.

Wang, Y, Zuo, J, Pan, M, Tu, B, Chang, R D, Liu, S, Xiong, F and Dong, N (2024) Cost prediction of building projects using the novel hybrid RA-ANN model. Engineering, Construction and Architectural Management, 31(06), 2563-82.

Wu, Z, Yang, K, Wu, Z, Xue, H, Li, S and Antwi-Afari, M F (2024) Investigating the mechanism of developers' willingness to adopt prefabricated housing using an integrated DEMATEL-SD framework. Engineering, Construction and Architectural Management, 31(06), 2392-414.

Wyke, S, Lindhard, S M and Larsen, J K (2024) Using principal component analysis to identify latent factors affecting cost and time overrun in public construction projects. Engineering, Construction and Architectural Management, 31(06), 2415-36.

Xiang, P, Xia, X and Pang, X (2024) An integrated risk assessment method for cross-regional mega construction projects. Engineering, Construction and Architectural Management, 31(06), 2369-91.

Xu, S, Zhou, L and Zou, P X W (2024) What influences stakeholders' decision in adopting blockchain-based quality tracking systems in prefabricated construction. Engineering, Construction and Architectural Management, 31(06), 2224-47.

Yuan, Z, Chang, Y, Chen, Y, Wang, Y, Huang, W and Chen, C (2024) Simulating and optimizing precast wall lifting in prefabricated building construction. Engineering, Construction and Architectural Management, 31(06), 2437-56.

Zarghami, S A (2024) Measuring sensitivity to change orders in construction projects using eigenvector centrality and radius of gyration. Engineering, Construction and Architectural Management, 31(06), 2478-95.