Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 23 results ...
Abas, N H, Blismas, N and Lingard, H (2021) Development of risk assessment tool using damaging energy and argumentation theory for evaluating construction occupational safety and health risks. Engineering, Construction and Architectural Management, 28(10), 2967-93.
Alvanchi, A, Baniassadi, F, Shahsavari, M and Kashani, H (2021) Improving materials logistics plan in road construction projects using discrete event simulation. Engineering, Construction and Architectural Management, 28(10), 3144-63.
Bai, L, Wang, Z, Wang, H, Huang, N and Shi, H (2021) Prediction of multiproject resource conflict risk via an artificial neural network. Engineering, Construction and Architectural Management, 28(10), 2857-83.
Ekanayake, E M A C, Shen, G and Kumaraswamy, M M (2021) Critical capabilities of improving supply chain resilience in industrialized construction in Hong Kong. Engineering, Construction and Architectural Management, 28(10), 3236-60.
Ekanayake, E M A C, Shen, G Q, Kumaraswamy, M and Owusu, E K (2021) Critical supply chain vulnerabilities affecting supply chain resilience of industrialized construction in Hong Kong. Engineering, Construction and Architectural Management, 28(10), 3041-59.
El-Kholy, A M and Akal, A Y (2021) Assessing and allocating the financial viability risk factors in public-private partnership wastewater treatment plant projects. Engineering, Construction and Architectural Management, 28(10), 3014-40.
ElMenshawy, M and Marzouk, M (2021) Automated BIM schedule generation approach for solving time–cost trade-off problems. Engineering, Construction and Architectural Management, 28(10), 3346-67.
Fu, M, Liu, R and Hon, C K H (2021) Walkability evaluation of building circulation based on user preference. Engineering, Construction and Architectural Management, 28(10), 2904-24.
Gebremeskel, M N, Kim, S Y, Thuc, L D and Nguyen, M V (2021) Forming a driving index for implementing public-private partnership projects in emerging economy: Ethiopian perception. Engineering, Construction and Architectural Management, 28(10), 2925-47.
Hamida, A, Alsudairi, A, Alshaibani, K and Alshamrani, O (2021) Environmental impacts cost assessment model of residential building using an artificial neural network. Engineering, Construction and Architectural Management, 28(10), 3190-215.
Heesom, D, Boden, P, Hatfield, A, De Los Santos Melo, A and Czarska-Chukwurah, F (2021) Implementing a HBIM approach to manage the translocation of heritage buildings. Engineering, Construction and Architectural Management, 28(10), 2948-66.
Imani, E and Asefi, M (2021) Empirical investigation of factors that enhance development of technology in design process improvement in architecture education: analyses of students' views. Engineering, Construction and Architectural Management, 28(10), 3164-89.
Jang, Y, Jeong, I and Cho, Y K (2021) Identifying impact of variables in deep learning models on bankruptcy prediction of construction contractors. Engineering, Construction and Architectural Management, 28(10), 3282-98.
Jia, J, Ma, G, Jiang, S, Wu, M and Wu, Z (2021) Influence of social media use at work on construction managers' work performance: the knowledge seeker's perspective. Engineering, Construction and Architectural Management, 28(10), 3216-35.
Koranteng, C, Simons, B and Manu, F W (2021) A thermal performance study of four communities in Ghana's savannah region. Engineering, Construction and Architectural Management, 28(10), 3261-81.
Li, Z, Zhang, S, Meng, Q and Hu, X (2021) Barriers to the development of prefabricated buildings in China: a news coverage analysis. Engineering, Construction and Architectural Management, 28(10), 2884-903.
Mantha, B R K and García de Soto, B (2021) Assessment of the cybersecurity vulnerability of construction networks. Engineering, Construction and Architectural Management, 28(10), 3078-105.
Manu, P, Asiedu, R O, Mahamadu, A M, Olomolaiye, P O, Booth, C, Manu, E, Ajayi, S and Agyekum, K (2021) Contribution of procurement capacity of public agencies to attainment of procurement objectives in infrastructure procurement. Engineering, Construction and Architectural Management, 28(10), 3322-45.
Naji, K, Gunduz, M and Salat, F (2021) Assessment of preconstruction factors in sustainable project management performance. Engineering, Construction and Architectural Management, 28(10), 3060-77.
Nwadigo, O, Naismith, N N, Ghaffarianhoseini, A, Ghaffarian Hoseini, A and Tookey, J (2021) Dynamic Bayesian network modelling for predicting adaptability of time performance during time influencing factors disruptions in construction enterprise. Engineering, Construction and Architectural Management, 28(10), 2994-3013.
Sanhudo, L, Poças Martins, J, Ramos, N M M, Almeida, R M S F, Rocha, A, Pinto, D, Barreira, E and Simões, M L (2021) BIM framework for the specification of information requirements in energy-related projects. Engineering, Construction and Architectural Management, 28(10), 3123-43.
Shen, K, Li, X, Cao, X and Zhihui, Z (2021) Research on the rework risk core tasks in prefabricated construction in China. Engineering, Construction and Architectural Management, 28(10), 3299-321.
Sirin, O, Gunduz, M and Shamiyeh, M E (2021) Application of analytic hierarchy process (AHP) for sustainable pavement performance management in Qatar. Engineering, Construction and Architectural Management, 28(10), 3106-22.