Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 12 results ...
Antwi-Afari, M F, Li, H, Seo, J, Anwer, S, Yevu, S K and Wu, Z (2021) Validity and reliability of a wearable insole pressure system for measuring gait parameters to identify safety hazards in construction. Engineering, Construction and Architectural Management, 28(06), 1761-79.
Arabpour Roghabadi, M and Moselhi, O (2021) Optimized crew selection for scheduling of repetitive projects. Engineering, Construction and Architectural Management, 28(06), 1517-40.
Chen, X, Ding, Y, Cory, C A, Hu, Y, Wu, K J and Feng, X (2021) A decision support model for subcontractor selection using a hybrid approach of QFD and AHP-improved grey correlation analysis. Engineering, Construction and Architectural Management, 28(06), 1780-806.
Cong, X, Wang, L, Ma, L and Skibnewski, M (2021) Exploring critical influencing factors for the site selection failure of waste-to-energy projects in China caused by the “not in my back yard” effect. Engineering, Construction and Architectural Management, 28(06), 1561-92.
Gadisa, B and Zhou, H (2021) Exploring influential factors leading to the poor performance of public construction project in Ethiopia using structural equation modelling. Engineering, Construction and Architectural Management, 28(06), 1683-712.
Hassan, A, El-Rayes, K and Attalla, M (2021) Optimizing the scheduling of crew deployments in repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 28(06), 1615-34.
Li, H, Zhong, Y and Fan, C (2021) Reducing the social risks of transnational railway construction: a discussion on the formation mechanism of host country people's coping behaviors. Engineering, Construction and Architectural Management, 28(06), 1657-82.
Liu, J and Ma, G (2021) Study on incentive and supervision mechanisms of technological innovation in megaprojects based on the principal-agent theory. Engineering, Construction and Architectural Management, 28(06), 1593-614.
Okudan, O, Budayan, C and Dikmen, I (2021) Development of a conceptual life cycle performance measurement system for build–operate–transfer (BOT) projects. Engineering, Construction and Architectural Management, 28(06), 1635-56.
Wang, R, Lee, C J, Hsu, S C and Chen, J H (2021) Preventing or encouraging illegal activities by construction firms: effects of top management team compensation and aspiration-performance discrepancies. Engineering, Construction and Architectural Management, 28(06), 1739-60.
Zhang, L and Sun, H (2021) The impacts of ethical climate on knowledge contribution loafing among designers in engineering design firms: mediated effect of knowledge leadership. Engineering, Construction and Architectural Management, 28(06), 1807-27.
Zou, X, Wu, G and Zhang, Q (2021) Work continuity constraints in repetitive project scheduling considering soft logic. Engineering, Construction and Architectural Management, 28(06), 1713-38.