Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 17 results ...
Alshorafa, R and Ergen, E (2021) Determining the level of development for BIM implementation in large-scale projects: A multi-case study. Engineering, Construction and Architectural Management, 28(01), 397-423.
Hasan, A, Ahn, S, Rameezdeen, R and Baroudi, B (2021) Investigation into post-adoption usage of mobile ICTs in Australian construction projects. Engineering, Construction and Architectural Management, 28(01), 351-71.
Heravi, G, Kebria, M F and Rostami, M (2021) Integrating the production and the erection processes of pre-fabricated steel frames in building projects using phased lean management. Engineering, Construction and Architectural Management, 28(01), 174-95.
Jiang, W and Zhao, X (2021) Trust and the intent to cooperate in energy performance contracting for public buildings in China. Engineering, Construction and Architectural Management, 28(01), 372-96.
Jiang, W, Martek, I, Hosseini, M R and Chen, C (2021) Political risk management of foreign direct investment in infrastructure projects: Bibliometric-qualitative analyses of research in developing countries. Engineering, Construction and Architectural Management, 28(01), 125-53.
Juan, Y K, Chi, H Y and Chen, H H (2021) Virtual reality-based decision support model for interior design and decoration of an office building. Engineering, Construction and Architectural Management, 28(01), 229-45.
Li, Y, He, N, Li, H, Liu, Z and Qi, J (2021) Influencing factors on inter-organizational trust asymmetry behavior in construction projects: Evidence from China. Engineering, Construction and Architectural Management, 28(01), 308-31.
Li, Y, Lin, J, Cui, Z, Wang, C and Li, G (2021) Workforce productivity evaluation of the US construction industry from 2006 to 2016. Engineering, Construction and Architectural Management, 28(01), 55-81.
Low, S P, Gao, S and Ng, E W L (2021) Future-ready project and facility management graduates in Singapore for industry 4.0: Transforming mindsets and competencies. Engineering, Construction and Architectural Management, 28(01), 270-90.
Ma, Z, Chong, H Y and Liao, P C (2021) Development of a time-variant causal model of human error in construction with dynamic Bayesian network. Engineering, Construction and Architectural Management, 28(01), 291-307.
Ramani, P V and Ksd, L K L (2021) Application of lean in construction using value stream mapping. Engineering, Construction and Architectural Management, 28(01), 216-28.
Sharma, K K, Israel, D and Bhalla, B (2021) Does previous work experience matter in students’ learning in higher project management education?. Engineering, Construction and Architectural Management, 28(01), 424-50.
Sinha, A K and Jha, K N (2021) Financing constraints of public–private partnership projects in India. Engineering, Construction and Architectural Management, 28(01), 246-69.
Wang, T, Abdallah, M, Clevenger, C and Monghasemi, S (2021) Time–cost–quality trade-off analysis for planning construction projects. Engineering, Construction and Architectural Management, 28(01), 82-100.
Wang, Y and Jin, X (2021) Structural risk of diversified project financing of city investment company in China based on the best worst method. Engineering, Construction and Architectural Management, 28(01), 196-215.
Wu, G, Hu, Z, Zheng, J, Zhao, X and Zuo, J (2021) Effects of structure characteristics of project network on conflicts and project success. Engineering, Construction and Architectural Management, 28(01), 101-24.
Xiang, L, Tan, Y, Jin, X and Shen, G (2021) Understanding stakeholders' concerns of age-friendly communities at the briefing stage: a preliminary study in urban China. Engineering, Construction and Architectural Management, 28(01), 31-54.