Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 9 results ...

Chang, J, Jaskula, K, Papadonikolaki, E, Rovas, D and Parlikad, A K (2024) Can blockchain prevent the deterioration of building handover information quality for higher education institutions?. Built Environment Project and Asset Management, 14(04), 509-28.

Krishnamurthy, A D and Mahesh, G (2024) Stimulation of construction industry output through enhanced efficiency of Indian residential real estate sector. Built Environment Project and Asset Management, 14(04), 562-89.

Kumar, G and Nayak, J K (2024) Moderating effect of subsidy policy on intention to purchase residential rooftop solar panel systems. Built Environment Project and Asset Management, 14(04), 626-43.

Mawed, M (2024) Revolutionizing performance measures and criteria for the facilities management industry in the UAE. Built Environment Project and Asset Management, 14(04), 644-62.

Nazeer, F S, Kamardeen, I and Hasan, A (2024) Research needs for enhancing pre-occupancy evaluation of buildings. Built Environment Project and Asset Management, 14(04), 529-46.

Nguyen, T S, Mohamed, S and Mostafa, S (2024) Optimising project outcomes in complex environments: empirical insights on agile practices and stakeholder dynamics. Built Environment Project and Asset Management, 14(04), 590-606.

  • Type: Journal Article
  • Keywords: adaptive scoping; agile response to change; project complexity; project performance; stakeholder engagement
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/BEPAM-06-2023-0107
  • Abstract:
    Purpose: This study delves into the dynamics between Agile Response to Change (AR), Adaptive Scoping (AS), Stakeholder Engagement (SE) and Project Performance (PP), with a special focus on the moderating influence of Project Complexity (PC). The research, grounded in a thorough literature review, identifies critical gaps in these areas and examines the extent to which PC moderates the effects of AR, AS and SE on PP, offering new perspectives for managing complex projects. Design/methodology/approach: The research develops a conceptual model based on a critical analysis of existing literature. A comprehensive questionnaire was designed, incorporating 28 items to measure AR, AS, SE, PP and PC. Data was collected from 136 project managers across various industries, and the responses were analysed using structural equation modelling (SEM) to explore the complex interplay between these variables. Findings: The analysis revealed that internal AR (ARint) significantly enhances both quantitative (PPqt) and qualitative aspects of PP (PPql). AS and SE were found to positively influence PPql, but their impact on PPqt was not significant. Interestingly, PC was observed to negatively moderate the relationship between ARint and PPql, while its moderating effect on the relationship between ARint and PPql was not significant. The study also notes that PC does not significantly alter the positive correlations between AS, SE and PPql. Originality/value: This research contributes to the existing body of knowledge by elucidating the relationships between ARint, AS, SE and different dimensions of PP. It uniquely explores the role of PC as a moderating variable in these relationships, offering valuable insights for practitioners and researchers in the field of complex project management. © 2024, Emerald Publishing Limited.

Shaker, R A, Elbeltagi, E, Motawa, I, Elmasoudi, I and Elnabwy, M T (2024) Social network analysis for identifying the significant drivers of off-site construction adoption in Egypt. Built Environment Project and Asset Management, 14(04), 607-25.

Zarei, F and Nik-Bakht, M (2024) Extending CityGML with public input – social ADE. Built Environment Project and Asset Management, 14(04), 547-61.

Zhang, D and Ho, C H (2024) Distribution fitting and ANOVA test to analyze pavement sensing patterns for condition assessments. Built Environment Project and Asset Management, 14(04), 663-76.