Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 11 results ...

Aliu, J, Oke, A E, Abayomi, T, Aigbavboa, C and Makanjuola, S (2024) Exploring the critical success factors for adopting gamification in the Nigerian construction sector. Built Environment Project and Asset Management, 14(02), 184-200.

Fernando, M H V, Costa, D D, Malsha Nadeetharu, B K and Kulatunga, U (2024) Application of lean principles for building refurbishment projects in Sri Lanka. Built Environment Project and Asset Management, 14(02), 244-59.

Kaur, P, Ritu, R K and Kaur, A (2024) Unraveling consumer behavioral intentions to adopt solar water heaters in India using UTAUT model. Built Environment Project and Asset Management, 14(02), 312-28.

Laitinen, K, Luhtala, M, Örmä, M and Vaismaa, K (2024) Productivity development enablers in the infrastructure sector: capability maturity model integration approach. Built Environment Project and Asset Management, 14(02), 201-27.

Lebunu Hewage, U W A, Wadu Mesthrige, J and Too, E G (2024) Barriers to risk management in small construction projects in Sri Lanka. Built Environment Project and Asset Management, 14(02), 296-311.

Nguyen, T, Chileshe, N, Ho, D T, Nguyen, V T and Tran, Q P (2024) Significant risks that trigger cost overruns and delays in urban rail projects: a typical case study of Vietnam. Built Environment Project and Asset Management, 14(02), 278-95.

Saad, A M, Dulaimi, M, Arogundade, S, Zulu, S L and Gorse, C (2024) Modern methods of construction (MMC) and innovation negativism in the UK public sector. Built Environment Project and Asset Management, 14(02), 147-63.

Singh, A K and Kumar, V R P (2024) Analyzing the barriers for blockchain-enabled BIM adoption in facility management using best-worst method approach. Built Environment Project and Asset Management, 14(02), 164-83.

Sruthilaya, D, Vilventhan, A and Gopal, P R C (2024) Analysis of project complexity factors and their interdependencies in metro rail projects. Built Environment Project and Asset Management, 14(02), 260-77.

Wibowo, A (2024) Ex ante required rates of return and related factors in Indonesian PPP infrastructure projects. Built Environment Project and Asset Management, 14(02), 228-43.

Zeng, S, Chung, F and Ashuri, B (2024) Forecasting Right-of-Way (ROW) acquisition timeline of transportation projects. Built Environment Project and Asset Management, 14(02), 129-46.