Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 30 results ...
Anjomshoa, E (2024) Key performance indicators of construction companies in branding products and construction projects for success in a competitive environment in Iran. Engineering, Construction and Architectural Management, 31(05), 2151-75.
Arora, M, Prakash, A, Mittal, A and Singh, S (2024) Examining the slow acceptance of HR analytics in the Indian engineering and construction industry: a SEM-ANN-based approach. Engineering, Construction and Architectural Management, 31(05), 1973-93.
Aslam, M, Baffoe-Twum, E and Malik, S (2024) Benchmarking lean construction conformance in Pakistan’s construction industry. Engineering, Construction and Architectural Management, 31(05), 2077-100.
Chan, I Y S and Chen, H (2024) Towards an integrative analysis of underground environment and human health: a survey and field measurement approach. Engineering, Construction and Architectural Management, 31(05), 1807-34.
Cole-Colander, C (2003) Designing the Customer Experience. Building Research & Information, 31(05), 357–66.
Cong, W, Zhang, S, Liang, H and Xiang, Q (2024) Impact of challenge and hindrance job stressors on informal safety communication of construction workers in China: the moderating role of co-worker relationship. Engineering, Construction and Architectural Management, 31(05), 2011-33.
Cooper, R, Bruce, M, Wootton, A, Hands, D and Daly, L (2003) Managing design in the extended enterprise. Building Research & Information, 31(05), 367–78.
Espinoza, D and Morris, J W F (2013) Decoupled NPV: a simple, improved method to value infrastructure investments. Construction Management and Economics, 31(05), 471-96.
Fazeli, A, Banihashemi, S, Hajirasouli, A and Mohandes, S R (2024) Automated 4D BIM development: the resource specification and optimization approach. Engineering, Construction and Architectural Management, 31(05), 1896-922.
Fellows, R and Liu, A M M (2013) Use and misuse of the concept of culture. Construction Management and Economics, 31(05), 401-22.
Gann, D M, Salter, A J and Whyte, J K (2003) Design Quality Indicator as a tool for thinking. Building Research & Information, 31(05), 318–33.
Ghansah, F A, Lu, W and Ababio, B K (2024) Modelling the critical challenges of quality assurance of cross-border construction logistics and supply chain during the COVID-19 pandemic. Engineering, Construction and Architectural Management, 31(05), 2128-50.
Gibson, E G and Gebken, R J (2003) Design quality in pre-project planning: applications of the Project Definition Rating Index. Building Research & Information, 31(05), 346–56.
Goh, Y M and Chua, D (2013) Neural network analysis of construction safety management systems: a case study in Singapore. Construction Management and Economics, 31(05), 460-70.
Guo, Y, Liu, J, Chen, C, Luo, X and Martek, I (2024) PPP project price mode typologies: a China-based comparative case study. Engineering, Construction and Architectural Management, 31(05), 2034-52.
Han, Y, Shen, J, Zhu, X, An, B and Bao, X (2024) Interaction mechanisms of interface management risks in complex systems of high-speed rail construction projects: an association rule mining-based modeling framework. Engineering, Construction and Architectural Management, 31(05), 2101-27.
Hansen, K L and Vanegas, J A (2003) Improving design quality through briefing automation. Building Research & Information, 31(05), 379–86.
Hu, Y, Song, J and Zhao, T (2024) Evolutionary game analysis of the intelligent upgrading of smart solar photovoltaic projects. Engineering, Construction and Architectural Management, 31(05), 1835-56.
Huang, W, Zhong, D and Chen, Y (2024) The relationship between construction workers’ emotional intelligence and safety performance. Engineering, Construction and Architectural Management, 31(05), 2176-201.
Li, H, Chen, Y, Zheng, J, Fang, Y, Yang, Y, Skitmore, M, Rusch, R and Jiang, T (2024) The influence of the psychological contract on the safety of performance of construction workers in China. Engineering, Construction and Architectural Management, 31(05), 1879-95.
Liao, L, Ye, Y, Wei, N, Li, H and Fan, C (2024) Exploring blockchain technology acceptance among non-managerial construction practitioners in Shenzhen, China. Engineering, Construction and Architectural Management, 31(05), 2053-76.
Odeyinka, H A, Lowe, J and Kaka, A P (2013) Artificial neural network cost flow risk assessment model. Construction Management and Economics, 31(05), 423-39.
Onubi, H O, Carpio, M and Hassan, A S (2024) Job satisfaction in green construction projects: antecedent roles of green work climate, pro-environmental construction practice and green human capital. Engineering, Construction and Architectural Management, 31(05), 1857-78.
Orr, S and Jadhav, A (2024) The effect of construction sustainability system interactions on financial performance: a sociotechnical perspective. Engineering, Construction and Architectural Management, 31(05), 1923-46.
Pinder, J, Iii, R S and Saker, J (2013) Stakeholder perspectives on developing more adaptable buildings. Construction Management and Economics, 31(05), 440-59.
Thomson, D S, Austin, S A, Devine-Wright, H and Mills, G R (2003) Managing value and quality in design. Building Research & Information, 31(05), 334–45.
Tiew, S Y (2024) Factors affecting performance of graduate architects in contract implementation management: a case study on housing projects in Malaysia. Engineering, Construction and Architectural Management, 31(05), 1789-806.
Wang, D, Luo, J and Wang, Y (2024) Multifactor uncertainty analysis of prefabricated building supply chain: qualitative comparative analysis. Engineering, Construction and Architectural Management, 31(05), 1994-2010.
Whyte, J K and Gann, D M (2003) Design Quality Indicators: work in progress. Building Research & Information, 31(05), 387–98.
Wu, X, Qian, Q and Zhang, M (2024) Impact of supervisor leadership on construction worker safety behavior in China: the moderating role of social capital. Engineering, Construction and Architectural Management, 31(05), 1947-72.