Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 29 results ...
0Amjad Mohammadi, A, Safaeipour, H, Chenaghlou, M R, Behnejad, A and Afghani Khoraskani, R (2024) 0Configuration processing and construction of large-span karbandi vaults: a case of the karbandi vaulting of Haj-Mohammad-Qoli Timche in Tabriz Historic Bazaar. Engineering, Construction and Architectural Management, 31(01), 432-68.
Agyekum, K, Amos-Abanyie, S, Kumah, V M A, Kukah, A S K and Salgin, B (2024) Obstacles to the career progression of professional female project managers (PFPMs) in the Ghanaian construction industry. Engineering, Construction and Architectural Management, 31(01), 200-26.
Aka, A, Bello, A O, Bamgbade, A A and Bilau, A A (2024) Age-performance consideration in the recruitment of tradespeople in Nigerian construction industry. Engineering, Construction and Architectural Management, 31(01), 386-404.
Bojic, M, Yik, F and Lee, M (2003) Influence of air-conditioning exhaust on exterior recessed space. Building Research & Information, 31(01), 25–34.
Boudeau, C (2013) Design team meetings and the coordination of expertise: the roof garden of a hospital. Construction Management and Economics, 31(01), 78-89.
Cevikbas, M, Okudan, O and Işık, Z (2024) Identification and assessment of disruption claim management risks in construction projects: a life cycle-based approach. Engineering, Construction and Architectural Management, 31(01), 1-27.
Cheng, L and Cao, D (2024) Evolution model and quantitative assessment of risk network in housing construction accidents. Engineering, Construction and Architectural Management, 31(01), 227-46.
Chew, M Y L and Silva, N D (2003) Maintainability problems of wet areas in high-rise residential buildings. Building Research & Information, 31(01), 60–9.
Crawford, R H, Treloar, G J, Iiozor, B D and Love, P E D (2003) Competitive greenhouse emissions analysis of domestic solar hot water systems. Building Research & Information, 31(01), 34–47.
Duan, P, Zhou, J and Fan, W (2024) Safety tag generation and training material recommendation for construction workers: a persona-based approach. Engineering, Construction and Architectural Management, 31(01), 115-35.
Feriadi, H, Hien, N, Chandra, S and Cheong, K W (2003) Adaptive behaviour and thermal comfort in Singapore's naturally ventilated housing. Building Research & Information, 31(01), 13–23.
Fuller, R J and Luther, M B (2003) Simulation of condensation problems in a roller skating centre. Building Research & Information, 31(01), 48–59.
Ghorbany, S, Yousefi, S and Noorzai, E (2024) Evaluating and optimizing performance of public–private partnership projects using copula Bayesian network. Engineering, Construction and Architectural Management, 31(01), 290-323.
Håkansson, H and Ingemansson, M (2013) Industrial renewal within the construction network. Construction Management and Economics, 31(01), 40-61.
Kim, J-L (2013) Genetic algorithm stopping criteria for optimization of construction resource scheduling problems. Construction Management and Economics, 31(01), 3-19.
Koskela, L (2003) Is structural change the primary solution to the problems of construction?. Building Research & Information, 31(01), 85–96.
Langston, C (2013) The role of coordinate-based decision-making in the evaluation of sustainable built environments. Construction Management and Economics, 31(01), 62-77.
Li, X, Liu, X, Huang, Y, Li, J, He, J and Dai, J (2024) Evolutionary mechanism of green innovation behavior in construction enterprises: evidence from the construction industry. Engineering, Construction and Architectural Management, 31(01), 159-78.
Liu, B, Li, J, Wang, D, Liu, H, Wu, G and Yuan, J (2024) Public–private partnerships: a collaborative framework for ensuring project sustainable operations. Engineering, Construction and Architectural Management, 31(01), 264-89.
Mirzaee, A M, Pourrostam, T, Majrouhi Sardroud, J, Hosseini, M R, Rahnamayiezekavat, P and Edwards, D (2024) Dispute root causes and prevention in Iranian public-private partnership projects: a causal-predictive model. Engineering, Construction and Architectural Management, 31(01), 405-31.
Raisbeck, P and Tang, L C M (2013) Identifying design development factors in Australian PPP projects using an AHP framework. Construction Management and Economics, 31(01), 20-39.
Rankohi, S, Bourgault, M and Iordanova, I (2024) The concept of integration in an IPD context: A grounded theory review. Engineering, Construction and Architectural Management, 31(01), 48-72.
Saka, A B, Chan, D W M and Ajayi, S O (2024) Institutional isomorphism and adoption of building information modelling (BIM) in small and medium-sized enterprises (SMEs) of the Nigerian Construction Industry. Engineering, Construction and Architectural Management, 31(01), 179-99.
Sunikka, M and Boon, C (2003) Environmental policies and efforts in social housing: the Netherlands. Building Research & Information, 31(01), 1–12.
Tian, B, Fu, J, Xu, Y and Sun, L (2024) How does contract flexibility affect the sustainability performance of public–private partnership projects? A serial multiple mediator model. Engineering, Construction and Architectural Management, 31(01), 28-47.
Tijani, B, Jin, X and Osei-Kyei, R (2024) Effect of project organization elements on the mental health of project management practitioner in AEC projects. Engineering, Construction and Architectural Management, 31(01), 73-114.
Wang, K, Guo, F, Zhang, C and Schaefer, D (2024) From Industry 4.0 to Construction 4.0: barriers to the digital transformation of engineering and construction sectors. Engineering, Construction and Architectural Management, 31(01), 136-58.
Wang, M and Liao, P C (2024) Experience-based systematic construction hazard warning. Engineering, Construction and Architectural Management, 31(01), 469-86.
Xiahou, X, Li, Z, Zuo, J, Wang, Z, Li, K and Li, Q (2024) Critical success factors for the implementation of urban regeneration REITs in China: a TISM–MICMAC based approach. Engineering, Construction and Architectural Management, 31(01), 363-85.