Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 31 results ...
Alharbi, R (2024) An appraisal of the early impact of COVID-19 on affordable housing finance in Saudi Arabia's Vision 2030. International Journal of Building Pathology and Adaptation, 42(04), 751-67.
Bartiaux, F, Gram-Hanssen, K, Fonseca, P, Ozoli?a, L and Christensen, T H (2014) A practice–theory approach to homeowners' energy retrofits in four European areas. Building Research & Information, 42(04), 525-38.
Berry, S, Sharp, A, Hamilton, J and Killip, G (2014) Inspiring low-energy retrofits: the influence of ‘open home’ events. Building Research & Information, 42(04), 422-33.
Christensen, T H, Gram-Hanssen, K, de Best-Waldhober, M and Adjei, A (2014) Energy retrofits of Danish homes: is the Energy Performance Certificate useful?. Building Research & Information, 42(04), 489-500.
Ebekozien, A, Aigbavboa, C, Emuchay, F E, Aigbedion, M, Ogbaini, I F and Awo-Osagie, A I (2024) Urban solid waste challenges and opportunities to promote sustainable developing cities through the fourth industrial revolution technologies. International Journal of Building Pathology and Adaptation, 42(04), 729-50.
Fawcett, T and Killip, G (2014) Anatomy of low carbon retrofits: evidence from owner-occupied Superhomes. Building Research & Information, 42(04), 434-45.
Frimpong, S, Sunindijo, R Y, Wang, C C, Boadu, E F, Dansoh, A, Hon, C K H and Yiu, T W (2024) Promoting positive mental health among young construction workers: the role of theory. Construction Management and Economics, 42(04), 366–85.
Galvin, R (2014) Why German homeowners are reluctant to retrofit. Building Research & Information, 42(04), 398-408.
Gupta, R, Barnfield, L and Hipwood, T (2014) Impacts of community-led energy retrofitting of owner-occupied dwellings. Building Research & Information, 42(04), 446-61.
Haines, V and Mitchell, V (2014) A persona-based approach to domestic energy retrofit. Building Research & Information, 42(04), 462-76.
Hamerski, D C, Saurin, T A, Formoso, C T and Isatto, E L (2024) The contributions of the Last Planner System to resilient performance in construction projects. Construction Management and Economics, 42(04), 328–45.
Hickey, P J and Cui, Q (2024) Tracing the career trajectories of architecture, engineering and construction (AEC) women leaders. Construction Management and Economics, 42(04), 289–306.
Hopkin, C and Lay, S (2024) Conceptual arguments on the use of unlatched reverse swing . International Journal of Building Pathology and Adaptation, 42(04), 618-36.
Horne, R, Maller, C and Dalton, T (2014) Low carbon, water-efficient house retrofits: an emergent niche?. Building Research & Information, 42(04), 539-48.
Ingle, A, Moezzi, M, Lutzenhiser, L and Diamond, R (2014) Better home energy audit modelling: incorporating inhabitant behaviours. Building Research & Information, 42(04), 409-21.
Islam, M H, Safayet, M A and Al Mamun, A (2024) Building performance analysis for optimizing the energy consumption of an educational building. International Journal of Building Pathology and Adaptation, 42(04), 576-95.
Judson, E P and Maller, C (2014) Housing renovations and energy efficiency: insights from homeowners’ practices. Building Research & Information, 42(04), 501-11.
Khozaei Ravari, F, Hassan, A S, Abdul Nasir, M H and Mohammad Taheri, M (2024) The development of residential spatial configuration for visual privacy in Iranian dwellings, a space syntax approach. International Journal of Building Pathology and Adaptation, 42(04), 672-703.
Mohd Latif, H, Essah, E A and Donyavi, S (2024) Creating a link between healthy homes and architectural elements: a qualitative study of modern residential buildings. International Journal of Building Pathology and Adaptation, 42(04), 637-52.
Morland, K V and Breslin, D (2024) Resolving learning paradoxes within a UK new-build housebuilder. Construction Management and Economics, 42(04), 307–27.
Muhammed, A, Folorunso, C O and Fadairo, G (2024) Assessment of sandcrete hollow blocks' thermal performance as a walling material for tropical buildings in Lokoja, Nigeria. International Journal of Building Pathology and Adaptation, 42(04), 653-71.
Nafe Assafi, M, Hoque, M I and Hossain, M M (2024) Investigating the causes of construction delay on the perspective of organization-sectors involved in the construction industry of Bangladesh. International Journal of Building Pathology and Adaptation, 42(04), 788-817.
- Type: Journal Article
- Keywords: Bangladesh; construction delay; organization-sector; preventive measures; statistical analysis; questionaire survey
- ISBN/ISSN: 23984708
- URL: https://doi.org/10.1108/IJBPA-10-2021-0137
- Abstract:
Purpose: Construction delay always causes massive damage to the advancing construction industries, which is no different in the case of Bangladeshi construction industries. This paper aims to investigate the major delay factors causing construction delays in public-funded, mixed and private-funded construction projects of Bangladesh. Also, it offers preventive suggestions from expert stakeholders to reduce the recurrence of delays. Design/methodology/approach: At first, an extensive literature review was conducted to identify the thirty-seven major delay factors categorized under seven groups. A questionnaire was then developed for survey at ongoing construction projects at a different division of Bangladesh. Next, data from 110 respondents were collected, and the delay factors were ranked based on the Relative Importance Index (RII); lastly, probable solutions were suggested for top-ranked delay factors based on opinions from expert stakeholders in the construction sector of Bangladesh. Findings: The overall RII ranking of the 37 delay factors showed "Construction mistakes and defective work," "Contract modifications by the client" and "Adverse weather condition" as the top three factors causing the delay. For public-funded projects, "Construction mistakes and defective work" and "Slow decision making by a consultant" are the top delay factors. For mixed projects, "Slow decision making of the client" and "Construction mistakes and defective work ranked top, and for private-funded projects, "Financial problems and payment delay of the client" and "Adverse weather condition" ranked top. These nuances of ranking in individual project types ascertain that the causes of delay vary in terms of project features. Practical implications: The outcome of this project will help identify the significant delay factors based on their severity of effectiveness associated with public-funded, mixed and private-funded projects in Bangladesh. The suggestions regarding preventing these delay factors obtained through the opinions of expert stakeholders can help reduce the effect of these delays in the context of Bangladesh and in countries where the similarity in construction environment prevails. Originality/value: Previously, studies on construction delays in Bangladesh focused mainly on identifying the delays using qualitative analysis techniques. This study is based on a unique methodology of integrating quantitative research on delay factor identification and qualitative research on preventive measures following the opinions gathered from expert stakeholders in the construction sector.
Nguyen, T Q, Lou, E C W and Nguyen, B N (2024) A theoretical BIM-based framework for quantity take-off to facilitate progress payments: The case of high-rise building projects in Vietnam. International Journal of Building Pathology and Adaptation, 42(04), 704-28.
Nimlyat, P S, Salihu, B and Wang, G P (2024) The impact of indoor environmental quality (IEQ) on patients' health and comfort in Nigeria. International Journal of Building Pathology and Adaptation, 42(04), 510-30.
Nyqvist, R, Peltokorpi, A and Seppänen, O (2024) Uncertainty network modeling method for construction risk management. Construction Management and Economics, 42(04), 346–65.
Okafor, C C, Sydney Ani, U and Ugwu, O (2024) Critical solutions to the lapses of supply chain management in Nigeria's construction industry. International Journal of Building Pathology and Adaptation, 42(04), 768-87.
Oyegoke, A S, Ajayi, S, Abbas, M A and Ogunlana, S (2024) Development of Adapt-ABLE smart system: An end-to-end system for speeding up disabled housing adaptation process. International Journal of Building Pathology and Adaptation, 42(04), 531-52.
Sharar, M, Agyekum, K, Manu, P, Che Ibrahim, C K I, Mahamadu, A M, Antwi-Afari, M F and Danso, F O (2024) Design for safety in construction: A study of design professionals in Kuwait. International Journal of Building Pathology and Adaptation, 42(04), 596-617.
Tomrukçu, G and Ashrafian, T (2024) Energy-efficient building design under climate change adaptation process: a case study of a single-family house. International Journal of Building Pathology and Adaptation, 42(04), 553-75.
Vlasova, L and Gram-Hanssen, K (2014) Incorporating inhabitants’ everyday practices into domestic retrofits. Building Research & Information, 42(04), 512-24.
Zaferanchi, M and Sozer, H (2024) Effectiveness of interventions to convert the energy consumption of an educational building to zero energy. International Journal of Building Pathology and Adaptation, 42(04), 485-509.