Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 22 results ...

Adeyemi, B S and Aigbavboa, C O (2024) An evaluation of the impacts of construction professionals’ conflict on performance in the Nigerian construction industry. International Journal of Building Pathology and Adaptation, 42(03), 469-82.

  • Type: Journal Article
  • Keywords: conflict impacts; construction industry; construction performance; construction professionals; Nigeria
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/IJBPA-09-2021-0124
  • Abstract:
    Purpose: This study aims to evaluate impacts of construction professionals (CPs) conflict on performance in the Nigerian construction industry (NCI). Design/methodology/approach: A quantitative method was used for this research. Questionnaires were sent to various CPs in Southwestern part of Nigeria. A total of 150 questionnaires were sent out, while 135 were gotten back from the partakers. The data received from the partakers were computed by applying descriptive and exploratory factor analysis. Findings: In this study, conflict leads to the abandonment of the CPs’ task being rated highest by the participants. This was followed by conflict that results in insufficient communication, generates job pressure, results to frustrations and displeasure among the CPs, helps in early problem identification, causes work damage among professionals, helps in solving professional organization problems, improves productivity of professionals, improves communication among the professionals and so on. Research limitations/implications: This paper is limited to CPs that are members of professional bodies in Nigeria, and only 135 participants participated. Though, this paper suggests that a mixed-method approach should be utilized in further studies with a wider coverage. Practical implications: The findings from this paper will increase the understanding of CPs in Nigeria on various impacts of conflict on performance in the construction industry, most specifically the professional bodies. Moreover, this study will increase the knowledge of CPs to always avoid whatever that leads to the abandonment of their tasks. Additionally, this study will benefit the CPs to avoid insufficient communication among themselves, in order to accomplish great performance and efficiency in their respective professional bodies. Originality/value: Since previous studies on impacts of construction conflict in Nigeria were only focused on contractors and consultants in construction project, this current study filled the gap by evaluating the impacts of CPs’ conflict on performance in the NCI. Also, the method of analysis used for this study is exemptional because previous studies have overlooked the method. However, it is recommended that CPs must communicate more with others so as to ensure favorable conflict effects on performance. © 2021, Emerald Publishing Limited.

Aksenova, G and Oti-Sarpong, K (2024) Beyond “platformania” in the construction sector: Conceptualisations and implications of product platformisation in the UK. Construction Management and Economics, 42(03), 229–50.

Amiri, O, Rahimi, M, Ayazi, A and Khazaeni, G (2024) Multi-criteria decision-making model for EPC contractor prequalification: a hybrid approach. International Journal of Building Pathology and Adaptation, 42(03), 369-85.

Azman, M A, Chuweni, N N, Muhamad Halil, F, Ku Azir, K M A, Lee, B L, Juhari, F N and Skitmore, M (2024) The impact of the change in institutional regulation on construction productivity: firm-level evidence in a developing economy. Construction Management and Economics, 42(03), 199–214.

Badi, S (2024) The role of blockchain in enabling inter-organisational supply chain alignment for value co-creation in the construction industry. Construction Management and Economics, 42(03), 266–88.

Bergsdal, H, Brattebø, H and Müller, D B (2014) Dynamic material flow analysis for PCBs in the Norwegian building stock. Building Research & Information, 42(03), 359-70.

Devine-Wright, P, Wrapson, W, Henshaw, V and Guy, S (2014) Low carbon heating and older adults: comfort, cosiness and glow. Building Research & Information, 42(03), 288-99.

Dias, J L, Silva, A, Chai, C, Gaspar, P L and de Brito, J (2014) Neural networks applied to service life prediction of exterior painted surfaces. Building Research & Information, 42(03), 371-80.

Gallardo, C, Sandberg, N H and Brattebø, H (2014) Dynamic-MFA examination of Chilean housing stock: long-term changes and earthquake damage. Building Research & Information, 42(03), 343-58.

Gluch, P, Gustafsson, M, Thuvander, L and Baumann, H (2014) Charting corporate greening: environmental management trends in Sweden. Building Research & Information, 42(03), 318-29.

Hamilton, I G, Shipworth, D, Summerfield, A J, Steadman, P, Oreszczyn, T and Lowe, R (2014) Uptake of energy efficiency interventions in English dwellings. Building Research & Information, 42(03), 255-75.

Hoang, V, Susilawati, C and Raharjo, J P (2024) Analysis of productivity performance of real estate and construction firms in Indonesia. Construction Management and Economics, 42(03), 215–28.

Ilgın, H E, Karjalainen, M and Pelsmakers, S (2024) Finnish architects' attitudes towards multi-storey timber-residential buildings. International Journal of Building Pathology and Adaptation, 42(03), 352-68.

Lees, T and Sexton, M (2014) An evolutionary innovation perspective on the selection of low and zero-carbon technologies in new housing. Building Research & Information, 42(03), 276-87.

Nath, A D, Hoque, M I, Datta, S D and Shahriar, F (2024) Various recycled steel fiber effect on mechanical properties of recycled aggregate concrete. International Journal of Building Pathology and Adaptation, 42(03), 448-68.

Oke, A E, Kineber, A F, Albukhari, I and Dada, A J (2024) Modeling the robotics implementation barriers for construction projects in developing countries. International Journal of Building Pathology and Adaptation, 42(03), 386-409.

Olatunde, N A (2024) Stakeholder management strategies employed on building projects procured by private corporate organisations in south-western Nigeria. International Journal of Building Pathology and Adaptation, 42(03), 430-47.

Schweber, L and Haroglu, H (2014) Comparing the fit between BREEAM assessment and design processes. Building Research & Information, 42(03), 300-17.

van Marrewijk, A, Veenswijk, M and Clegg, S (2014) Changing collaborative practices through cultural interventions. Building Research & Information, 42(03), 330-42.

van Wyk, L, Kajimo-Shakantu, K and Opawole, A (2024) Adoption of innovative technologies in the South African construction industry. International Journal of Building Pathology and Adaptation, 42(03), 410-29.

Walker, G H, Foscarin-Kosmetatou, S, Marr, S, Gillies, S and Lindsay, P (2024) Critical essay: sociotechnical construction. Construction Management and Economics, 42(03), 251–65.

Zhalmurziyeva, K, Tokbolat, S, Durdyev, S, Mustafa, M Y and Karaca, F (2024) Assessment of sustainability indicators for urban water infrastructure in a developing country. International Journal of Building Pathology and Adaptation, 42(03), 337-51.