Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 22 results ...
Conejos, S, Chew, M Y L, Tay, K, Tay, S and Safiena, S (2023) Green maintainability assessment of building-integrated photovoltaic (BIPV) applications: lessons learnt. International Journal of Building Pathology and Adaptation, 41(02), 320-46.
Fellows, M F, Phua, F T T and Tutt, D E (2023) Building bridges: the bilingual language work of migrant construction workers. Construction Management and Economics, 41(02), 153–71.
Galea, N, Powell, A and Salignac, F (2023) The role of homosociality in maintaining men’s powerfulness in construction companies. Construction Management and Economics, 41(02), 172–82.
Grant, A and Ries, R (2013) Impact of building service life models on life cycle assessment. Building Research & Information, 41(02), 168-86.
Hegarty, T, Wright, S, Wordsworth, R and Lord, B (2023) Deferential Tailoring: a grounded theory of how women respond and adapt to social conditions and gender-related challenges in the New Zealand construction industry. Construction Management and Economics, 41(02), 138–52.
Holmes, S H and Reinhart, C F (2013) Assessing future climate change and energy price scenarios: institutional building investment. Building Research & Information, 41(02), 209-22.
Hoque, M I, Safayet, M A, Rana, M J, Bhuiyan, A Y and Quraishy, G S (2023) Analysis of construction delay for delivering quality project in Bangladesh. International Journal of Building Pathology and Adaptation, 41(02), 401-21.
- Type: Journal Article
- Keywords: Bangladesh; construction delay; developing countries; important index; radar chart
- ISBN/ISSN:
- URL: https://doi.org/10.1108/IJBPA-03-2021-0032
- Abstract:
Purpose: Construction delay is the most common issue and creates many adverse effects in any construction industry. This study has investigated the views of engineers, project managers and contractors on the causes of delay during a construction phase to identify potential delay factors, negative effects on project delivery and prioritize the delay factors. Design/methodology/approach: An extensive literature review and interview with construction stakeholders have been conducted to identify potential causes of construction delays and design a questionnaire survey. The final questionnaire was designed with 40 potential delay factors, and a total of 102 valid Bangladeshi construction stakeholders responded to it. The result was analyzed by the relative importance index. Findings: Among the 40 delay factors, the top five most influencing delay factors are “delay in progress payments,” “rework due to mistakes during construction,” “lack of skilled labor,” “poor monitoring and control of activities” and “delays in the making of a decision.” The top five most damaging effects of delay are “time overrun,” “cost overrun,” “disputes,” “arbitration” and “litigation,” among ten negative effects of construction delay. All construction stakeholders believe that the owner-related, consultant-related and contractor-related groups are the first, second and third most important groups of delay factors. Originality/value: The outcome of this study would enable the Bangladeshi construction industry to develop strategies to overcome delay factors and their harmful effects. By focusing on the outcome of this research and prioritizing the critical factors, the construction industry of Bangladesh will be able to minimize construction delay significantly and propagate the progress of the construction industry by delivering quality projects timely.
Hughes, M, Palmer, J, Cheng, V and Shipworth, D (2013) Sensitivity and uncertainty analysis of England's housing energy model. Building Research & Information, 41(02), 156-67.
Khan, M I, Khan, S, Khan, U and Haleem, A (2023) Modeling the Big Data challenges in context of smart cities – an integrated fuzzy ISM-DEMATEL approach. International Journal of Building Pathology and Adaptation, 41(02), 422-53.
Kongela, S M (2023) Sustainability potential awareness among built environment stakeholders: experience from Tanzania. International Journal of Building Pathology and Adaptation, 41(02), 301-19.
Liu, Q, Feng, Y, London, K and Zhang, P (2023) Influence of personal characteristics and environmental stressors on mental health for multicultural construction workplaces in Australia. Construction Management and Economics, 41(02), 116–37.
Newaz, M T, Ershadi, M, Jefferies, M, Pillay, M and Davis, P (2023) A systematic review of contemporary safety management research: a multi-level approach to identifying trending domains in the construction industry. Construction Management and Economics, 41(02), 97–115.
Nouri, H, Safehian, M and Mir Mohammad Hosseini, S M (2023) Life cycle assessment of earthen materials for low-cost housing a comparison between rammed earth and fired clay bricks. International Journal of Building Pathology and Adaptation, 41(02), 364-77.
Olojede, B O, Opawole, A, Jagboro, G O and Alao, O O (2023) Examination of roles performed by public sector organizations in the procurement of public-private partnership projects. International Journal of Building Pathology and Adaptation, 41(02), 495-511.
Rehm, M and Ade, R (2013) Construction costs comparison between ‘green’ and conventional office buildings. Building Research & Information, 41(02), 198-208.
Schweber, L (2013) The effect of BREEAM on clients and construction professionals. Building Research & Information, 41(02), 129-45.
Toller, S, Carlsson, A, Wadeskog, A, Miliutenko, S and Finnveden, G (2013) Indicators for environmental monitoring of the Swedish building and real estate management sector. Building Research & Information, 41(02), 146-55.
Umeokafor, N, Okoro, C, Diugwu, I and Umar, T (2023) Design for safety in construction in Nigeria: a qualitative inquiry of the critical opportunities. International Journal of Building Pathology and Adaptation, 41(02), 476-94.
Van Tam, N, Quoc Toan, N, Phong, V V and Durdyev, S (2023) Impact of BIM-related factors affecting construction project performance. International Journal of Building Pathology and Adaptation, 41(02), 454-75.
Wafaei Baneh, K, Wafaei Baneh, B, Osman, A, Mostafapour, O and Bradosty, Z R (2023) Regeneration and documentation of historic geometric Islamic patterns via HBIM: a case study of Choli minaret, Kurdistan Region. International Journal of Building Pathology and Adaptation, 41(02), 347-63.
Wright, G B and Jack, L B (2013) Property-level stormwater drainage systems: integrated flow simulation and whole-life costs. Building Research & Information, 41(02), 223-36.
Xu, W, Cong, J and Proverbs, D G (2023) Evaluation of infrastructure resilience. International Journal of Building Pathology and Adaptation, 41(02), 378-400.