Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 20 results ...

Agyefi-Mensah, S, Kpamma, Z E and Hagan, D E (2022) Stair step geometry compliance with standard specifications for safety and usability: a study of selected university buildings in Ghana. International Journal of Building Pathology and Adaptation, 40(01), 20-39.

Alipour-Bashary, M, Ravanshadnia, M, Abbasianjahromi, H and Asnaashari, E (2022) Building demolition risk assessment by applying a hybrid fuzzy FTA and fuzzy CRITIC-TOPSIS framework. International Journal of Building Pathology and Adaptation, 40(01), 134-59.

Cole, R J (2012) Transitioning from green to regenerative design. Building Research & Information, 40(01), 39–53.

Cole, R J, Busby, P, Guenther, R, Briney, L, Blaviesciunaite, A and Alencar, T (2012) A regenerative design framework: setting new aspirations and initiating new discussions. Building Research & Information, 40(01), 95–111.

du Plessis, C (2012) Towards a regenerative paradigm for the built environment. Building Research & Information, 40(01), 7–22.

Ehwi, R J, Oti-Sarpong, K, Shojaei, R and Burgess, G (2022) Offsite Manufacturing Research: A Systematic Review of Methodologies Used. Construction Management and Economics, 40(01), 1–24.

Ekeskär, A, Havenvid, & I, Karrbom Gustavsson, T and Eriksson, P E (2022) Construction logistics in a multi-project context: coopetition among main contractors and the role of third-party logistics providers. Construction Management and Economics, 40(01), 25–40.

Faqih, F, Zayed, T and Alfalah, G (2022) Technology-based multi-tiered building diagnosis framework. International Journal of Building Pathology and Adaptation, 40(01), 101-33.

Hamida, M B, Hassanain, M A and Al-Hammad, A M (2022) Review and assessment of factors affecting adaptive reuse of commercial projects in Saudi Arabia. International Journal of Building Pathology and Adaptation, 40(01), 1-19.

Hoxie, C, Berkebile, R and Todd, J A (2012) Stimulating regenerative development through community dialogue. Building Research & Information, 40(01), 65–80.

Inançoğlu, S and Uzunoglu, S S (2022) Transformation of social housing kitchens over time: Nicosia Göçmenköy social houses as a case study. International Journal of Building Pathology and Adaptation, 40(01), 40-59.

Järvenpää, A, Eriksson, P E and Larsson, J (2022) Exploring a public client’s control systems in infrastructure projects from a relationship history perspective. Construction Management and Economics, 40(01), 56–71.

  • Type: Journal Article
  • Keywords: Organizational control; inter-organizational relationship; infrastructure projects; relationship history; Sweden;
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446193.2021.2014064
  • Abstract:
    Using a proper control system is vital to ensure that project delivery is satisfactory for the client. Prior research has identified relationship history as a potentially vital contingency factor in organizational control, but there is a lack of research on how relationship history affects how different control systems function in project-based contexts. In the Swedish infrastructure market, increased demand has resulted in a need for increased supply capacity. This has spurred new entrants that have no relationship history with the major client, the Swedish Transport Administration. The purpose is therefore to compare how the client’s control systems function in construction projects with familiar (known to the client) and unfamiliar (new to the client) contractors. The case study involves 32 interviews conducted in six infrastructure projects, three with unfamiliar contractors. Findings show that relationship history heavily influences how the control systems function, especially bureaucratic and clan control. The new contractors are unaccustomed with the client’s extensive use of bureaucratic control and perceive it as less suitable in design-build contracts. Furthermore, the lack of relationship history reduces the opportunity to use clan control from the beginning of a project, due to unfamiliarity with both the client and the control system.

Mang, P and Reed, B (2012) Designing from place: a regenerative framework and methodology. Building Research & Information, 40(01), 23–38.

Nwadike, A N and Wilkinson, S (2022) Why amending building codes? An investigation of the benefits of regular building code amendment in New Zealand. International Journal of Building Pathology and Adaptation, 40(01), 76-100.

Plaut, J M, Dunbar, B, Wackerman, A and Hodgin, S (2012) Regenerative design: the LENSES Framework for buildings and communities. Building Research & Information, 40(01), 112–22.

Simpeh, F and Adisa, S (2022) On-campus student accommodation safety measures: provision versus risk analysis. International Journal of Building Pathology and Adaptation, 40(01), 60-75.

Styhre, A, Brorström, S and Gluch, P (2022) The valuation of housing in low-amenity and low purchasing power city districts: social and economic value entangled by default. Construction Management and Economics, 40(01), 72–86.

Svec, P, Berkebile, R and Todd, J A (2012) REGEN: toward a tool for regenerative thinking. Building Research & Information, 40(01), 81–94.

Svensson, I and Gluch, P (2022) Materiality in action: the role of objects in institutional work. Construction Management and Economics, 40(01), 41–55.

Zari, M P (2012) Ecosystem services analysis for the design of regenerative built environments. Building Research & Information, 40(01), 54–64.