Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 11 results ...
Ballesteros-Pérez, P, Skitmore, M, Pellicer, E and González-Cruz, M C (2015) Scoring rules and abnormally low bids criteria in construction tenders: a taxonomic review. Construction Management and Economics, 33(04), 259-78.
Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 1: A portfolio of feedback techniques. Building Research & Information, 33(04), 347–52.
Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 3: Case studies of the use of techniques in the feedback portfolio. Building Research & Information, 33(04), 361–75.
- Type: Journal Article
- Keywords: case studies; client satisfaction; design quality; feedback; innovation; learning; post-occupancy evaluation; process improvement; professional services; quality control; techniques; user group
- ISBN/ISSN: 0961-3218
- URL: http://taylorandfrancis.metapress.com/link.asp?id=x418k9260712rjg1
- Abstract:
Although there is increasing interest in building performance, the people who procure, design and construct buildings seldom engage closely with the performance of the buildings they have created. This paper outlines the results of 14 case studies where designers and their clients used one or more techniques chosen from a portfolio of ten to evaluate their buildings or processes at any stage in the life cycle of a project. It is revealed that considerable value could be obtained for relatively low effort, helping to improve both the performance of the building concerned and the skills and insights of the participants; and that there was value in using established techniques that were robust, cost-effective and had benchmarks available where appropriate. It proved easier to undertake a survey than to get people together to discuss their experience. However, after the procurement process had started, it proved difficult to incorporate feedback, because everyone was already committed to a particular mode of operation.
Hamzeh, F R, Zankoul, E and Rouhana, C (2015) How can 'tasks made ready' during look-ahead planning impact reliable workflow and project duration?. Construction Management and Economics, 33(04), 243-58.
Herazo, B and Lizarralde, G (2015) The influence of green building certifications in collaboration and innovation processes. Construction Management and Economics, 33(04), 279-98.
Humphreys, M A (2005) Quantifying occupant comfort: are combined indices of the indoor environment practicable?. Building Research & Information, 33(04), 317–25.
Kaminsky, J (2015) The fourth pillar of infrastructure sustainability: tailoring civil infrastructure to social context. Construction Management and Economics, 33(04), 299-309.
Kampschroer, K and Heerwagen, J H (2005) The strategic workplace: development and evaluation. Building Research & Information, 33(04), 326–37.
Loosemore, M and Lim, B (2015) Inter-organizational unfairness in the construction industry. Construction Management and Economics, 33(04), 310-26.
Nicol, F and Roaf, S (2005) Post-occupancy evaluation and field studies of thermal comfort. Building Research & Information, 33(04), 338–46.
Way, M and Bordass, B (2005) Making feedback and post-occupancy evaluation routine 2: Soft landings – involving design and building teams in improving performance. Building Research & Information, 33(04), 353–60.