Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 30 results ...

Anjomshoa, E (2024) Key performance indicators of construction companies in branding products and construction projects for success in a competitive environment in Iran. Engineering, Construction and Architectural Management, 31(05), 2151-75.

Arora, M, Prakash, A, Mittal, A and Singh, S (2024) Examining the slow acceptance of HR analytics in the Indian engineering and construction industry: a SEM-ANN-based approach. Engineering, Construction and Architectural Management, 31(05), 1973-93.

Aslam, M, Baffoe-Twum, E and Malik, S (2024) Benchmarking lean construction conformance in Pakistan’s construction industry. Engineering, Construction and Architectural Management, 31(05), 2077-100.

Chan, I Y S and Chen, H (2024) Towards an integrative analysis of underground environment and human health: a survey and field measurement approach. Engineering, Construction and Architectural Management, 31(05), 1807-34.

Cole-Colander, C (2003) Designing the Customer Experience. Building Research & Information, 31(05), 357–66.

Cong, W, Zhang, S, Liang, H and Xiang, Q (2024) Impact of challenge and hindrance job stressors on informal safety communication of construction workers in China: the moderating role of co-worker relationship. Engineering, Construction and Architectural Management, 31(05), 2011-33.

Cooper, R, Bruce, M, Wootton, A, Hands, D and Daly, L (2003) Managing design in the extended enterprise. Building Research & Information, 31(05), 367–78.

Espinoza, D and Morris, J W F (2013) Decoupled NPV: a simple, improved method to value infrastructure investments. Construction Management and Economics, 31(05), 471-96.

Fazeli, A, Banihashemi, S, Hajirasouli, A and Mohandes, S R (2024) Automated 4D BIM development: the resource specification and optimization approach. Engineering, Construction and Architectural Management, 31(05), 1896-922.

Fellows, R and Liu, A M M (2013) Use and misuse of the concept of culture. Construction Management and Economics, 31(05), 401-22.

Gann, D M, Salter, A J and Whyte, J K (2003) Design Quality Indicator as a tool for thinking. Building Research & Information, 31(05), 318–33.

Ghansah, F A, Lu, W and Ababio, B K (2024) Modelling the critical challenges of quality assurance of cross-border construction logistics and supply chain during the COVID-19 pandemic. Engineering, Construction and Architectural Management, 31(05), 2128-50.

Gibson, E G and Gebken, R J (2003) Design quality in pre-project planning: applications of the Project Definition Rating Index. Building Research & Information, 31(05), 346–56.

Goh, Y M and Chua, D (2013) Neural network analysis of construction safety management systems: a case study in Singapore. Construction Management and Economics, 31(05), 460-70.

Guo, Y, Liu, J, Chen, C, Luo, X and Martek, I (2024) PPP project price mode typologies: a China-based comparative case study. Engineering, Construction and Architectural Management, 31(05), 2034-52.

Han, Y, Shen, J, Zhu, X, An, B and Bao, X (2024) Interaction mechanisms of interface management risks in complex systems of high-speed rail construction projects: an association rule mining-based modeling framework. Engineering, Construction and Architectural Management, 31(05), 2101-27.

Hansen, K L and Vanegas, J A (2003) Improving design quality through briefing automation. Building Research & Information, 31(05), 379–86.

Hu, Y, Song, J and Zhao, T (2024) Evolutionary game analysis of the intelligent upgrading of smart solar photovoltaic projects. Engineering, Construction and Architectural Management, 31(05), 1835-56.

Huang, W, Zhong, D and Chen, Y (2024) The relationship between construction workers’ emotional intelligence and safety performance. Engineering, Construction and Architectural Management, 31(05), 2176-201.

Li, H, Chen, Y, Zheng, J, Fang, Y, Yang, Y, Skitmore, M, Rusch, R and Jiang, T (2024) The influence of the psychological contract on the safety of performance of construction workers in China. Engineering, Construction and Architectural Management, 31(05), 1879-95.

Liao, L, Ye, Y, Wei, N, Li, H and Fan, C (2024) Exploring blockchain technology acceptance among non-managerial construction practitioners in Shenzhen, China. Engineering, Construction and Architectural Management, 31(05), 2053-76.

Odeyinka, H A, Lowe, J and Kaka, A P (2013) Artificial neural network cost flow risk assessment model. Construction Management and Economics, 31(05), 423-39.

Onubi, H O, Carpio, M and Hassan, A S (2024) Job satisfaction in green construction projects: antecedent roles of green work climate, pro-environmental construction practice and green human capital. Engineering, Construction and Architectural Management, 31(05), 1857-78.

  • Type: Journal Article
  • Keywords: construction site; green human capital; green work climate; job satisfaction; pro-environmental construction practices
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-06-2022-0548
  • Abstract:
    Purpose: Job satisfaction (JS) of construction workers is important in determining the level of green construction project performance. Despite the importance of construction workers' JS in actualizing green construction projects' objectives, insufficient consideration has been accorded in green construction studies. This study aims to determine the link between green human capital (GHC), pro-environmental construction practice (PCP), green work climate (GWC) and JS. Precisely, the purpose of this study is to investigate the mediating role of GWC on the GHC and PCP relationship while analysing the moderating effect of GWC on the relationship between PCP and JS. Design/methodology/approach: This research's data were collected through a survey questionnaire with 272 useable responses obtained. The partial least squares structural equation modelling (PLS-SEM) technique was used in the study's data analysis. Findings: The findings of this study indicate that GHC was positively related to PCP; GWC had a significant mediating effect on the GHC–PCP relationship; PCP had a significant positive effect on JS; and GWC had a significant moderating effect on the PCP–JS relationship with high GWC yielding the greater effect. Practical implications: This study gives a clearer picture of how GHC can lead to the adoption of PCP through GWC and translate to JS, thus providing stakeholders with the required information on firm-based initiatives that can promote the needed green behaviour on the construction site. Originality/value: The originality of this study lies in its contribution to both theory and practice as it provides greater insight into PCP alongside its antecedents and outcomes as it relates to the JS of construction project/site managers. © 2022, Emerald Publishing Limited.

Orr, S and Jadhav, A (2024) The effect of construction sustainability system interactions on financial performance: a sociotechnical perspective. Engineering, Construction and Architectural Management, 31(05), 1923-46.

Pinder, J, Iii, R S and Saker, J (2013) Stakeholder perspectives on developing more adaptable buildings. Construction Management and Economics, 31(05), 440-59.

Thomson, D S, Austin, S A, Devine-Wright, H and Mills, G R (2003) Managing value and quality in design. Building Research & Information, 31(05), 334–45.

Tiew, S Y (2024) Factors affecting performance of graduate architects in contract implementation management: a case study on housing projects in Malaysia. Engineering, Construction and Architectural Management, 31(05), 1789-806.

Wang, D, Luo, J and Wang, Y (2024) Multifactor uncertainty analysis of prefabricated building supply chain: qualitative comparative analysis. Engineering, Construction and Architectural Management, 31(05), 1994-2010.

Whyte, J K and Gann, D M (2003) Design Quality Indicators: work in progress. Building Research & Information, 31(05), 387–98.

Wu, X, Qian, Q and Zhang, M (2024) Impact of supervisor leadership on construction worker safety behavior in China: the moderating role of social capital. Engineering, Construction and Architectural Management, 31(05), 1947-72.