Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 30 results ...

Anjomshoa, E (2024) Key performance indicators of construction companies in branding products and construction projects for success in a competitive environment in Iran. Engineering, Construction and Architectural Management, 31(05), 2151-75.

Arora, M, Prakash, A, Mittal, A and Singh, S (2024) Examining the slow acceptance of HR analytics in the Indian engineering and construction industry: a SEM-ANN-based approach. Engineering, Construction and Architectural Management, 31(05), 1973-93.

Aslam, M, Baffoe-Twum, E and Malik, S (2024) Benchmarking lean construction conformance in Pakistan’s construction industry. Engineering, Construction and Architectural Management, 31(05), 2077-100.

Chan, I Y S and Chen, H (2024) Towards an integrative analysis of underground environment and human health: a survey and field measurement approach. Engineering, Construction and Architectural Management, 31(05), 1807-34.

Cole-Colander, C (2003) Designing the Customer Experience. Building Research & Information, 31(05), 357–66.

Cong, W, Zhang, S, Liang, H and Xiang, Q (2024) Impact of challenge and hindrance job stressors on informal safety communication of construction workers in China: the moderating role of co-worker relationship. Engineering, Construction and Architectural Management, 31(05), 2011-33.

  • Type: Journal Article
  • Keywords: accessibility; challenge-hindrance stressors; informal safety communication; regression; trustworthiness
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-05-2023-0460
  • Abstract:
    Purpose: Job stressors have a considerable influence on workplace safety behaviors. However, the findings from previous studies regarding the effect of different types of job stressors have been contradictory. This is attributable to, among other factors, the effectiveness of job stressors varying with occupations and contexts. This study examines the effects of challenge and hindrance stressors on construction workers' informal safety communication at different levels of coworker relationships. Design/methodology/approach: A three-dimensional framework of informal safety communication is adopted, including self-needed, citizenship and participatory safety communication. Stepwise regression analysis is then performed using questionnaire survey data collected from 293 construction workers in the Chinese construction industry. Findings: The results demonstrate that both challenge and hindrance stressors are negatively associated with self-needed and citizenship safety communication, whereas their relationships with participatory safety communication are not significant. Meanwhile, the mitigation effects of the coworker relationship (represented by trustworthiness and accessibility) on the above negative impacts vary with the communication forms. Higher trustworthiness and accessibility enable workers faced with challenge stressors to actively manage these challenges and engage in self-needed safety communication. Similarly, trustworthiness promotes workers' involvement in self-needed and citizenship safety communication in the face of hindrance stressors, but accessibility is only effective in facilitating self-needed safety communication. Originality/value: By introducing the job demands-resources theory and distinguishing informal safety communication into three categories, this study explains the negative effects of challenge and hindrance job stressors in complex and variable construction contexts and provides additional clues to the current inconsistent findings regarding this framework. The diverse roles of challenge and hindrance job stressors also present strong evidence for the need to differentiate between the types of informal safe communication. © 2024, Emerald Publishing Limited.

Cooper, R, Bruce, M, Wootton, A, Hands, D and Daly, L (2003) Managing design in the extended enterprise. Building Research & Information, 31(05), 367–78.

Espinoza, D and Morris, J W F (2013) Decoupled NPV: a simple, improved method to value infrastructure investments. Construction Management and Economics, 31(05), 471-96.

Fazeli, A, Banihashemi, S, Hajirasouli, A and Mohandes, S R (2024) Automated 4D BIM development: the resource specification and optimization approach. Engineering, Construction and Architectural Management, 31(05), 1896-922.

Fellows, R and Liu, A M M (2013) Use and misuse of the concept of culture. Construction Management and Economics, 31(05), 401-22.

Gann, D M, Salter, A J and Whyte, J K (2003) Design Quality Indicator as a tool for thinking. Building Research & Information, 31(05), 318–33.

Ghansah, F A, Lu, W and Ababio, B K (2024) Modelling the critical challenges of quality assurance of cross-border construction logistics and supply chain during the COVID-19 pandemic. Engineering, Construction and Architectural Management, 31(05), 2128-50.

Gibson, E G and Gebken, R J (2003) Design quality in pre-project planning: applications of the Project Definition Rating Index. Building Research & Information, 31(05), 346–56.

Goh, Y M and Chua, D (2013) Neural network analysis of construction safety management systems: a case study in Singapore. Construction Management and Economics, 31(05), 460-70.

Guo, Y, Liu, J, Chen, C, Luo, X and Martek, I (2024) PPP project price mode typologies: a China-based comparative case study. Engineering, Construction and Architectural Management, 31(05), 2034-52.

Han, Y, Shen, J, Zhu, X, An, B and Bao, X (2024) Interaction mechanisms of interface management risks in complex systems of high-speed rail construction projects: an association rule mining-based modeling framework. Engineering, Construction and Architectural Management, 31(05), 2101-27.

Hansen, K L and Vanegas, J A (2003) Improving design quality through briefing automation. Building Research & Information, 31(05), 379–86.

Hu, Y, Song, J and Zhao, T (2024) Evolutionary game analysis of the intelligent upgrading of smart solar photovoltaic projects. Engineering, Construction and Architectural Management, 31(05), 1835-56.

Huang, W, Zhong, D and Chen, Y (2024) The relationship between construction workers’ emotional intelligence and safety performance. Engineering, Construction and Architectural Management, 31(05), 2176-201.

Li, H, Chen, Y, Zheng, J, Fang, Y, Yang, Y, Skitmore, M, Rusch, R and Jiang, T (2024) The influence of the psychological contract on the safety of performance of construction workers in China. Engineering, Construction and Architectural Management, 31(05), 1879-95.

Liao, L, Ye, Y, Wei, N, Li, H and Fan, C (2024) Exploring blockchain technology acceptance among non-managerial construction practitioners in Shenzhen, China. Engineering, Construction and Architectural Management, 31(05), 2053-76.

Odeyinka, H A, Lowe, J and Kaka, A P (2013) Artificial neural network cost flow risk assessment model. Construction Management and Economics, 31(05), 423-39.

Onubi, H O, Carpio, M and Hassan, A S (2024) Job satisfaction in green construction projects: antecedent roles of green work climate, pro-environmental construction practice and green human capital. Engineering, Construction and Architectural Management, 31(05), 1857-78.

Orr, S and Jadhav, A (2024) The effect of construction sustainability system interactions on financial performance: a sociotechnical perspective. Engineering, Construction and Architectural Management, 31(05), 1923-46.

Pinder, J, Iii, R S and Saker, J (2013) Stakeholder perspectives on developing more adaptable buildings. Construction Management and Economics, 31(05), 440-59.

Thomson, D S, Austin, S A, Devine-Wright, H and Mills, G R (2003) Managing value and quality in design. Building Research & Information, 31(05), 334–45.

Tiew, S Y (2024) Factors affecting performance of graduate architects in contract implementation management: a case study on housing projects in Malaysia. Engineering, Construction and Architectural Management, 31(05), 1789-806.

Wang, D, Luo, J and Wang, Y (2024) Multifactor uncertainty analysis of prefabricated building supply chain: qualitative comparative analysis. Engineering, Construction and Architectural Management, 31(05), 1994-2010.

Whyte, J K and Gann, D M (2003) Design Quality Indicators: work in progress. Building Research & Information, 31(05), 387–98.

Wu, X, Qian, Q and Zhang, M (2024) Impact of supervisor leadership on construction worker safety behavior in China: the moderating role of social capital. Engineering, Construction and Architectural Management, 31(05), 1947-72.