Afful, A E, Ayarkwa, J, Acquah, G K K, Osei-Asibey, D and Osei Assibey, A A D (2023) Barriers to incorporation of indoor environmental quality (IEQ) principles into building designs. Engineering, Construction and Architectural Management, 30(06), 2400-19.

Boyd, D and Bentley, D (2012) A critique of conceptions of design and management in construction projects. Construction Management and Economics, 30(06), 441-54.

Bröchner, J, Josephson, P-E and Kadefors, A (2002) Swedish construction culture, quality management and collaborative practice. Building Research & Information, 30(06), 392–400.

Cevikbas, M and Işık, Z (2023) Detecting the most appropriate delay analysis methods for mega airport projects. Engineering, Construction and Architectural Management, 30(06), 2463-80.

Durdyev, S, Koc, K, Karaca, F and Gurgun, A P (2023) Strategies for implementation of green roofs in developing countries. Engineering, Construction and Architectural Management, 30(06), 2481-502.

Erman, E (2002) Timber joint design: the geometric breakdown method. Building Research & Information, 30(06), 446–69.

Fitriani, H and Ajayi, S (2023) Investigation of requisite measures for enhancing sustainable construction practices in Indonesia. Engineering, Construction and Architectural Management, 30(06), 2602-20.

Gao, Q, Liu, B, Sun, J, Liu, C and Xu, Y (2023) Border-crossing frequencies of CO2 embodied in international trade of construction products for final demand. Engineering, Construction and Architectural Management, 30(06), 2360-80.

Jennings, W (2012) Why costs overrun: risk, optimism and uncertainty in budgeting for the London 2012 Olympic Games. Construction Management and Economics, 30(06), 455-62.

Khatatbeh, A A (2023) Quantifying the impact of ISO 9001 standard on the project and engineering management and success factors; A case of construction industry. Engineering, Construction and Architectural Management, 30(06), 2564-81.

Langston, C (2023) The empirical relationship between contractor success and project innovation. Engineering, Construction and Architectural Management, 30(06), 2231-54.

Lehtiranta, L, Kärnä, S, Junnonen, J-M and Julin, P (2012) The role of multi-firm satisfaction in construction project success. Construction Management and Economics, 30(06), 463-75.

Mohandes, S R, Durdyev, S, Sadeghi, H, Mahdiyar, A, Hosseini, M R, Banihashemi, S and Martek, I (2023) Towards enhancement in reliability and safety of construction projects: developing a hybrid multi-dimensional fuzzy-based approach. Engineering, Construction and Architectural Management, 30(06), 2255-79.

Ofori, G (2002) Singapore's construction: moving toward a knowledge-based industry. Building Research & Information, 30(06), 401–12.

Olatunji, O A, Ramanayaka, C D E, Rotimi, F E and Rotimi, J O B (2023) Analysis of contractors' administrative characteristics in bid decision factors. Engineering, Construction and Architectural Management, 30(06), 2420-35.

Omar, H and Mahdjoubi, L (2023) Practical solutions for improving the suboptimal performance of construction projects using Dubai construction projects as an example. Engineering, Construction and Architectural Management, 30(06), 2185-205.

Onubi, H O, Hassan, A S, Yusof, N and Bahdad, A A S (2023) Moderating effect of project size on the relationship between COVID-19 safety protocols and economic performance of construction projects. Engineering, Construction and Architectural Management, 30(06), 2206-30.

Pietroforte, R and Miller, J B (2002) Procurement methods for US infrastructure: historical perspectives and recent trends. Building Research & Information, 30(06), 425–35.

Qiu, Y and Chen, H (2023) A systematic review of the knowledge domain of institutional theory in construction project management. Engineering, Construction and Architectural Management, 30(06), 2523-44.

Reeves, K (2002) Construction business systems in Japan: general contractors and subcontractors. Building Research & Information, 30(06), 413–24.

Rwelamila, P D (2002) Creating an effective construction industry strategy in South Africa. Building Research & Information, 30(06), 435–45.

Shahid, M U, Thaheem, M J and Arshad, H (2023) Quantification and benchmarking of construction waste and its impact on cost – a case of Pakistan. Engineering, Construction and Architectural Management, 30(06), 2304-33.

Shi, C, Chen, Y, Hua, Y and Tang, Y (2023) Understanding subcontracting organizational arrangements for construction projects in China: integrating capabilities and uncertainty. Engineering, Construction and Architectural Management, 30(06), 2381-99.

Shi, Q, Zuo, J and Zillante, G (2012) Exploring the management of sustainable construction at the programme level: a Chinese case study. Construction Management and Economics, 30(06), 425-40.

Sodangi, M (2023) Towards attaining efficient joint ventures in international construction: the case of Saudi Arabia. Engineering, Construction and Architectural Management, 30(06), 2545-63.

Tetteh, M O, Chan, A P C, Nani, G, Darko, A and Oppong, G D (2023) Impacts of management control mechanisms on the performance of international construction joint ventures: an empirical study. Engineering, Construction and Architectural Management, 30(06), 2280-303.

Xie, L L, Luo, Z and Zhao, X (2023) Critical factors of construction workers' career promotion: evidence from Guangzhou city. Engineering, Construction and Architectural Management, 30(06), 2334-59.

Yuan, X X (2012) Bayesian method for the correlated competitive bidding model. Construction Management and Economics, 30(06), 477-91.

Zaman, U, Florez-Perez, L, Anjam, M, Ghani Khwaja, M and Ul-Huda, N (2023) At the end of the world, turn left: examining toxic leadership, team silence and success in mega construction projects. Engineering, Construction and Architectural Management, 30(06), 2436-62.

Zhang, H M, Chong, H Y, Zeng, Y and Zhang, W (2023) The effective mediating role of stakeholder management in the relationship between BIM implementation and project performance. Engineering, Construction and Architectural Management, 30(06), 2503-22.

  • Type: Journal Article
  • Keywords: BIM implementation; mediation; project performance; stakeholder management; structural equations modeling
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-04-2020-0225
  • Abstract:

    Purpose: Building information modeling (BIM) has brought great advantages to project delivery and performance. However, BIM has also increased the complexity of projects. Research shows that for BIM implementation to have a positive impact in this innovative environment, BIM should be synchronized with stakeholder management. Therefore, this research aims to incorporate the theory of stakeholder management in BIM-enabled projects and determine the theory’s intermediary role between BIM implementation and project performance. Design/methodology/approach: An extensive literature review was conducted and 13 critical success factors (CSFs) for BIM implementation, 29 CSFs for stakeholder management and 6 CSFs for BIM project performance were identified. These measurement items were tested using a questionnaire survey method and analyzed using structural equation modeling. This research was focused on Chinese megaprojects or complex projects that were under a high level of development of BIM, which could reflect the complex stakeholder relationships and BIM implementation for project performance. Findings: The results indicate that effective use of BIM can directly improve project performance. Further, stakeholder management has an important and positive intermediary role within the path of BIM implementation and project performance, particularly through (1) stakeholder dynamics (SD) and (2) stakeholder engagement or empowerment (SE). Originality/value: The logical relationship of mutual influence among CSFs has been revealed for BIM-enabled projects. This research contributes to the effective collaboration and practice of BIM in the construction industry.